메뉴 건너뛰기




Volumn 112, Issue 1, 2008, Pages 177-191

Minimizing work overload in mixed-model assembly lines

Author keywords

Heuristics; Just in time; Scheduling; Sequencing; Work overload

Indexed keywords

HEURISTIC METHODS; PROBLEM SOLVING; SCHEDULING;

EID: 38749123964     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2006.08.019     Document Type: Article
Times cited : (56)

References (20)
  • 1
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines
    • Aigbedo H., and Monden Y. A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines. International Journal of Production Research 35 (1997) 2543-2564
    • (1997) International Journal of Production Research , vol.35 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 3
    • 0031213490 scopus 로고    scopus 로고
    • Efficient methods for sequencing minimum job sets on mixed model assembly lines
    • Bolat A. Efficient methods for sequencing minimum job sets on mixed model assembly lines. Naval Research Logistics 44 (1997) 419-437
    • (1997) Naval Research Logistics , vol.44 , pp. 419-437
    • Bolat, A.1
  • 4
    • 0026933958 scopus 로고
    • Scheduling algorithms to minimize utility work at a single station on paced assembly line
    • Bolat A., and Yano C.A. Scheduling algorithms to minimize utility work at a single station on paced assembly line. Production Planning and Control 3 (1992) 393-405
    • (1992) Production Planning and Control , vol.3 , pp. 393-405
    • Bolat, A.1    Yano, C.A.2
  • 5
    • 0026936861 scopus 로고
    • A surrogate objective for utility work in paced assembly line
    • Bolat A., and Yano C.A. A surrogate objective for utility work in paced assembly line. Production Planning and Control 3 (1992) 406-412
    • (1992) Production Planning and Control , vol.3 , pp. 406-412
    • Bolat, A.1    Yano, C.A.2
  • 6
    • 0032120699 scopus 로고    scopus 로고
    • A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
    • Hyun C.J., Kim Y., and Kim Y.K. A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers and Operations Research 25 (1998) 675-690
    • (1998) Computers and Operations Research , vol.25 , pp. 675-690
    • Hyun, C.J.1    Kim, Y.2    Kim, Y.K.3
  • 7
    • 0035341955 scopus 로고    scopus 로고
    • Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
    • Korkmazel T., and Meral S. Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems. European Journal of Operational Research 131 (2001) 188-207
    • (2001) European Journal of Operational Research , vol.131 , pp. 188-207
    • Korkmazel, T.1    Meral, S.2
  • 8
    • 9944236363 scopus 로고    scopus 로고
    • Sequencing problem for a mixed-model assembly line in the Toyota production system
    • Kotani S., Ito T., and Ohno K. Sequencing problem for a mixed-model assembly line in the Toyota production system. International Journal of Production Research 42 (2004) 4955-4974
    • (2004) International Journal of Production Research , vol.42 , pp. 4955-4974
    • Kotani, S.1    Ito, T.2    Ohno, K.3
  • 9
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time productions systems
    • Miltenburg J. Level schedules for mixed-model assembly lines in just-in-time productions systems. Management Science 35 (1989) 192-207
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 10
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Institute of Industrial Engineers, Atlanta, GA
    • Monden Y. Toyota Production System (1983), Industrial Engineering and Management Press, Institute of Industrial Engineers, Atlanta, GA
    • (1983) Toyota Production System
    • Monden, Y.1
  • 11
    • 0032118472 scopus 로고    scopus 로고
    • Designing a mixed-model assembly line to minimize the costs of idle time and utility times
    • Sarker B., and Pan H. Designing a mixed-model assembly line to minimize the costs of idle time and utility times. Computers and Industrial Engineering 34 (1998) 609-628
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 609-628
    • Sarker, B.1    Pan, H.2
  • 13
    • 0032305338 scopus 로고    scopus 로고
    • Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
    • Scholl A., Klein R., and Domschke W. Pattern based vocabulary building for effectively sequencing mixed-model assembly lines. Journal of Heuristics 4 (1998) 359-381
    • (1998) Journal of Heuristics , vol.4 , pp. 359-381
    • Scholl, A.1    Klein, R.2    Domschke, W.3
  • 14
    • 0030572655 scopus 로고    scopus 로고
    • Traditional heuristics versus hopfield neural network approach to a car sequencing problem
    • Smith K., Palaniswami M., and Krishnamoorthy M. Traditional heuristics versus hopfield neural network approach to a car sequencing problem. European Journal of Operational Research 93 (1996) 300-316
    • (1996) European Journal of Operational Research , vol.93 , pp. 300-316
    • Smith, K.1    Palaniswami, M.2    Krishnamoorthy, M.3
  • 15
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
    • Tsai L.H. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Management Science 41 (1995) 485-495
    • (1995) Management Science , vol.41 , pp. 485-495
    • Tsai, L.H.1
  • 16
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a sit production system
    • Xiaobo Z., and Ohno K. Algorithms for sequencing mixed models on an assembly line in a sit production system. Computers and Industrial Engineering 32 (1997) 47-56
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 17
    • 0033728251 scopus 로고    scopus 로고
    • Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
    • Xiaobo Z., and Ohno K. Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages. European Journal of Operational Research 124 (2000) 560-570
    • (2000) European Journal of Operational Research , vol.124 , pp. 560-570
    • Xiaobo, Z.1    Ohno, K.2
  • 18
    • 0000544268 scopus 로고
    • Survey, development and applications of algorithms for sequencing paced assembly lines
    • Yano C.A., and Bolat A. Survey, development and applications of algorithms for sequencing paced assembly lines. Journal of Manufacturing and Operations Management 2 (1989) 172-198
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 172-198
    • Yano, C.A.1    Bolat, A.2
  • 19
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • Yano C.A., and Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options. Management Science 37 (1991) 572-586
    • (1991) Management Science , vol.37 , pp. 572-586
    • Yano, C.A.1    Rachamadugu, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.