메뉴 건너뛰기




Volumn 131, Issue 5, 2009, Pages 0510121-05101212

Manufacturing system design considering stochastic product evolution and task recurrence

Author keywords

Line balancing; Manufacturing system design; Mixed integer programming; Stochastic product change; Task recurrence

Indexed keywords

BALANCING; COST EFFECTIVENESS; INTEGER PROGRAMMING; LIFE CYCLE; MANUFACTURE; STOCHASTIC SYSTEMS; SYSTEMS ANALYSIS;

EID: 77955285833     PISSN: 10871357     EISSN: 15288935     Source Type: Journal    
DOI: 10.1115/1.4000095     Document Type: Article
Times cited : (17)

References (51)
  • 1
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed- model production line balancing problem
    • Askin, R. G., and Zhou, M., 1997, "A Parallel Station Heuristic for the Mixed- Model Production Line Balancing Problem," Int. J. Prod. Res., 35(11), pp. 3095-3105.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 2
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl, A., and Becker, C., 2006, "State-of-the-Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing," Eur. J. Oper. Res., 168(3), pp. 666-693.
    • (2006) Eur. J. Oper. Res. , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 4
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker, C., and Scholl, A., 2006, "A Survey on Problems and Methods in Generalized Assembly Line Balancing," Eur. J. Oper. Res., 168(3), pp. 694-715.
    • (2006) Eur. J. Oper. Res. , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 5
    • 27744559270 scopus 로고    scopus 로고
    • Stochastic assembly line balancing using beam search
    • Erel, E., Sabuncuoglu, I., and Sekerci, H., 2005, "Stochastic Assembly Line Balancing Using Beam Search," Int. J. Prod. Res., 43(7), pp. 1411-1426.
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.7 , pp. 1411-1426
    • Erel, E.1    Sabuncuoglu, I.2    Sekerci, H.3
  • 7
    • 0042270463 scopus 로고    scopus 로고
    • Stochastic programming approaches to stochastic scheduling
    • Birge, J. R., and Dempster, M. A. H., 1996, "Stochastic Programming Approaches to Stochastic Scheduling," J. Global Optim., 9(3-4), pp. 417-451.
    • (1996) J. Global Optim. , vol.9 , Issue.3-4 , pp. 417-451
    • Birge, J.R.1    Dempster, M.A.H.2
  • 8
    • 84867954072 scopus 로고    scopus 로고
    • A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
    • Ahmed, S., King, A., and Parija, G., 2003, "A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion Under Uncertainty," J. Global Optim., 26(1), pp. 3-24.
    • (2003) J. Global Optim. , vol.26 , Issue.1 , pp. 3-24
    • Ahmed, S.1    King, A.2    Parija, G.3
  • 9
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel, E., and Sarin, S. C., 1998, "A Survey of the Assembly Line Balancing Procedures," Prod. Plan. Control, 9(5), pp. 414-434.
    • (1998) Prod. Plan. Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 10
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., Grassi, A., and Rimini, B., 2006, "A New Multi-Objective Heuristic Algorithm for Solving the Stochastic Assembly Line Re-Balancing Problem," Int. J. Prod. Econ., 102(2), pp. 226-243.
    • (2006) Int. J. Prod. Econ. , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 11
    • 3342985995 scopus 로고
    • A review of analytical systems of line balancing
    • Kilbridge, M. D., and Wester, L., 1962, "A Review of Analytical Systems of Line Balancing," Oper. Res., 10(5), pp. 626-638.
    • (1962) Oper. Res. , vol.10 , Issue.5 , pp. 626-638
    • Kilbridge, M.D.1    Wester, L.2
  • 12
    • 0024641634 scopus 로고
    • A comprehensive literature-review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S., and Gagnon, R. J., 1989, "A Comprehensive Literature-Review and Analysis of the Design, Balancing and Scheduling of Assembly Systems," Int. J. Prod. Res., 27(4), pp. 637-670.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 13
    • 0001636411 scopus 로고
    • Experimental investigation and comparative evaluation of production line balancing techniques
    • Mastor, A. A., 1970, "Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques," Management Science, 16(11), pp. 728-746.
    • (1970) Management Science , vol.16 , Issue.11 , pp. 728-746
    • Mastor, A.A.1
  • 14
    • 0000396642 scopus 로고
    • Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations
    • Pinto, P. A., Dannenbring, D. G., and Khumawala, B. M., 1981, "Branch and Bound and Heuristic Procedures for Assembly Line Balancing With Paralleling of Stations," Int. J. Prod. Res., 19(5), pp. 565-576.
    • (1981) Int. J. Prod. Res. , vol.19 , Issue.5 , pp. 565-576
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 15
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin, J., and Rubinovitz, J., 2003, "A Weighted Approach for Assembly Line Design With Station Paralleling and Equipment Selection," IIE Trans., 35(1), pp. 73-85.
    • (2003) IIE Trans. , vol.35 , Issue.1 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 16
    • 0032001849 scopus 로고    scopus 로고
    • The mixed-model u-line balancing problem
    • Sparling, D., and Miltenburg, J., 1998, "The Mixed-Model U-Line Balancing Problem," Int. J. Prod. Res., 36(2), pp. 485-501.
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.2 , pp. 485-501
    • Sparling, D.1    Miltenburg, J.2
  • 17
    • 0035840757 scopus 로고    scopus 로고
    • Balancing of U-type assembly systems using simulated annealing
    • Erel, E., Sabuncuoglu, I., and Aksu, B. A., 2001, "Balancing of U-Type Assembly Systems Using Simulated Annealing," Int. J. Prod. Res., 39(13), pp. 3003-3015.
    • (2001) Int. J. Prod. Res. , vol.39 , Issue.13 , pp. 3003-3015
    • Erel, E.1    Sabuncuoglu, I.2    Aksu, B.A.3
  • 18
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • DOI 10.1016/S0925-5273(00)00064-5, PII S0925527300000645
    • Miltenburg, J., 2001, "U-Shaped Production Lines: A Review of Theory and Practice," Int. J. Prod. Econ., 70(3), pp. 201-214. (Pubitemid 32272149)
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 19
    • 0242401874 scopus 로고    scopus 로고
    • U-OPT: An analysis of exact U-shaped line balancing procedures
    • Aase, G. R., Schniederjans, M. J., and Olson, J. R., 2003, "U-OPT: An Analysis of Exact U-shaped Line Balancing Procedures," Int. J. Prod. Res., 41(17), pp. 4185-4210.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.17 , pp. 4185-4210
    • Aase, G.R.1    Schniederjans, M.J.2    Olson, J.R.3
  • 20
    • 12844277355 scopus 로고    scopus 로고
    • Automated generation of assembly system-design solutions
    • Webbink, R. F., and Hu, S. J., 2005, "Automated Generation of Assembly System-Design Solutions," IEEE Trans. Autom. Sci. Eng., 2(1), pp. 32-39.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.1 , pp. 32-39
    • Webbink, R.F.1    Hu, S.J.2
  • 21
    • 46149112187 scopus 로고    scopus 로고
    • Balancing of manufacturing systems with complex configurations for delayed product differentiation
    • Ko, J., and Hu, S. J., 2008, "Balancing of Manufacturing Systems With Complex Configurations for Delayed Product Differentiation," Int. J. Prod. Res., 46(15), pp. 4285-4308.
    • (2008) Int. J. Prod. Res. , vol.46 , Issue.15 , pp. 4285-4308
    • Ko, J.1    Hu, S.J.2
  • 22
    • 0031258003 scopus 로고    scopus 로고
    • Design of assembly systems for modular products
    • He, D. W., and Kusiak, A., 1997, "Design of Assembly Systems for Modular Products," IEEE Trans. Rob. Autom., 13(5), pp. 646-655.
    • (1997) IEEE Trans. Rob. Autom. , vol.13 , Issue.5 , pp. 646-655
    • He, D.W.1    Kusiak, A.2
  • 23
    • 84885869652 scopus 로고
    • A stochastic line balancing procedure
    • Kottas, J. F., and Lau, H. S., 1981, "A Stochastic Line Balancing Procedure," Int. J. Prod. Res., 19(2), pp. 177-193.
    • (1981) Int. J. Prod. Res. , vol.19 , Issue.2 , pp. 177-193
    • Kottas, J.F.1    Lau, H.S.2
  • 24
    • 0025462434 scopus 로고
    • Development of cost model for the single- model stochastic assembly line balancing problem
    • Sarin, S. C., and Erel, E., 1990, "Development of Cost Model for the Single- Model Stochastic Assembly Line Balancing Problem," Int. J. Prod. Res., 28(7), pp. 1305-1316.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.7 , pp. 1305-1316
    • Sarin, S.C.1    Erel, E.2
  • 25
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman, F. N., and Carter, J. C., 1986, "A Cost-Based Methodology for Stochastic Line Balancing With Intermittent Line Stoppages," Manage. Sci., 32(4), pp. 455-463.
    • (1986) Manage. Sci. , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 26
    • 0023586184 scopus 로고
    • An exploratory-study on stopping a paced line when incompletions occur
    • Lau, H. S., and Shtub, A., 1987, "An Exploratory-Study on Stopping a Paced Line When Incompletions Occur," IIE Trans., 19(4), pp. 463-467.
    • (1987) IIE Trans. , vol.19 , Issue.4 , pp. 463-467
    • Lau, H.S.1    Shtub, A.2
  • 27
    • 0000423498 scopus 로고
    • Stochastic assembly-line balancing using simulated annealing
    • Suresh, G., and Sahu, S., 1994, "Stochastic Assembly-Line Balancing Using Simulated Annealing," Int. J. Prod. Res., 32(8), pp. 1801-1810.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.8 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 28
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen, P. R., and Frazier, G. V., 1998, "Using Simulated Annealing to Solve a Multiobjective Assembly Line Balancing Problem With Parallel Workstations," Int. J. Prod. Res., 36(10), pp. 2717-2741.
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 29
    • 0021392913 scopus 로고
    • The effect of incompletion cost on line balancing with multiple manning of work stations
    • Shtub, A., 1984, "The Effect of Incompletion Cost on Line Balancing With Multiple Manning of Work Stations," Int. J. Prod. Res., 22(2), pp. 235-245.
    • (1984) Int. J. Prod. Res. , vol.22 , Issue.2 , pp. 235-245
    • Shtub, A.1
  • 30
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen, P. R., and Tarasewich, P., 2003, "Using ant Techniques to Solve the Assembly Line Balancing Problem," IIE Trans., 35(7), pp. 605-617.
    • (2003) IIE Trans. , vol.35 , Issue.7 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 31
    • 0029732559 scopus 로고    scopus 로고
    • A genetic algorithm for assembly line balancing
    • Suresh, G., Vinod, V. V., and Sahu, S., 1996, "A Genetic Algorithm for Assembly Line Balancing," Prod. Plan. Control, 7(1), pp. 38-46.
    • (1996) Prod. Plan. Control , vol.7 , Issue.1 , pp. 38-46
    • Suresh, G.1    Vinod, V.V.2    Sahu, S.3
  • 32
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie, C. L., and Young, H. H., 1965, "A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times," Journal of Industrial Engineering, 16(1), pp. 23-29.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 33
    • 0038580042 scopus 로고
    • A stochastic approach to assembly- line balancing
    • Nkasu, M. M., and Leung, K. H., 1995, "A Stochastic Approach to Assembly- Line Balancing," Int. J. Prod. Res., 33(4), pp. 975-991.
    • (1995) Int. J. Prod. Res. , vol.33 , Issue.4 , pp. 975-991
    • Nkasu, M.M.1    Leung, K.H.2
  • 34
    • 0026367536 scopus 로고
    • Using learning-theory in assembly lines for new products
    • Dar-El, E. M., and Rubinovitz, J., 1991, "Using Learning-Theory in Assembly Lines for New Products," Int. J. Prod. Econ., 25(13), pp. 103-109.
    • (1991) Int. J. Prod. Econ. , vol.25 , Issue.13 , pp. 103-109
    • Dar-El, E.M.1    Rubinovitz, J.2
  • 35
    • 0026938787 scopus 로고
    • On-the-fly line balancing with very little WIP
    • McClain, J. O., Thomasa, L. J., and Soxb, C., 1992, "On-the-Fly Line Balancing With Very Little WIP," Int. J. Prod. Econ., 27, pp. 283-289.
    • (1992) Int. J. Prod. Econ. , vol.27 , pp. 283-289
    • McClain, J.O.1    Thomasa, L.J.2    Soxb, C.3
  • 36
    • 0035452548 scopus 로고    scopus 로고
    • Performance opportunity for workforce agility in collaborative and noncollaborative work systems
    • Van Oyen, M. P., Gel, E. G. S., and Hopp, W. J., 2001, "Performance Opportunity for Workforce Agility in Collaborative and Noncollaborative Work Systems," IIE Trans., 33(9), pp. 761-777.
    • (2001) IIE Trans. , vol.33 , Issue.9 , pp. 761-777
    • Van Oyen, M.P.1    Gel, E.G.S.2    Hopp, W.J.3
  • 37
    • 0036778653 scopus 로고    scopus 로고
    • Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
    • Gel, E. S., Hopp, W. J., and Van Oyen, M. P., 2002, "Factors Affecting Opportunity of Worksharing as a Dynamic Line Balancing Mechanism," IIE Trans., 34(10), pp. 847-863.
    • (2002) IIE Trans. , vol.34 , Issue.10 , pp. 847-863
    • Gel, E.S.1    Hopp, W.J.2    Van Oyen, M.P.3
  • 38
    • 0038515132 scopus 로고    scopus 로고
    • A new fuzzy AHP method for the evaluation of automated manufacturing systems
    • Monitto, M., Pappalardo, P., and Tolio, T., 2002, "A New Fuzzy AHP Method for the Evaluation of Automated Manufacturing Systems," CIRP Ann., 51(1), pp. 395-398.
    • (2002) CIRP Ann. , vol.51 , Issue.1 , pp. 395-398
    • Monitto, M.1    Pappalardo, P.2    Tolio, T.3
  • 39
    • 21944431814 scopus 로고    scopus 로고
    • Reusability assessment for manufacturing systems
    • Ko, J., Hu, S. J., and Huang, T., 2005, "Reusability Assessment for Manufacturing Systems," CIRP Ann., 54(1), pp. 113-116.
    • (2005) CIRP Ann. , vol.54 , Issue.1 , pp. 113-116
    • Ko, J.1    Hu, S.J.2    Huang, T.3
  • 40
    • 0022676381 scopus 로고
    • Production planning of style goods with high setup costs and forecast revisions
    • Bitran, G. R., Haas, E. A., and Matsuo, H., 1986, "Production Planning of Style Goods With High Setup Costs and Forecast Revisions," Oper. Res., 34(2), pp. 226-236.
    • (1986) Oper. Res. , vol.34 , Issue.2 , pp. 226-236
    • Bitran, G.R.1    Haas, E.A.2    Matsuo, H.3
  • 42
    • 0024962821 scopus 로고
    • Models and exact- solutions for a class of stochastic location-routing problems
    • Laporte, G., Louveaux, F., and Mercure, H., 1989, "Models and Exact- Solutions for a Class of Stochastic Location-Routing Problems," Eur. J. Oper. Res., 39(1), pp. 71-78.
    • (1989) Eur. J. Oper. Res. , vol.39 , Issue.1 , pp. 71-78
    • Laporte, G.1    Louveaux, F.2    Mercure, H.3
  • 43
    • 0024700442 scopus 로고
    • A scenario approach to capacity planning
    • Eppen, G. D., Martin, R. K., and Schrage, L., 1989, "A Scenario Approach to Capacity Planning," Oper. Res., 37(4), pp. 517-527.
    • (1989) Oper. Res. , vol.37 , Issue.4 , pp. 517-527
    • Eppen, G.D.1    Martin, R.K.2    Schrage, L.3
  • 44
    • 0028446466 scopus 로고
    • A stochastic optimization model for planning capacity expansion in a service industry under uncertain demand
    • Berman, O., Ganz, Z., and Wagner, J. M., 1994, "A Stochastic Optimization Model for Planning Capacity Expansion in a Service Industry Under Uncertain Demand," Naval Res. Logistics Quart., 41(4), pp. 545-564.
    • (1994) Naval Res. Logistics Quart. , vol.41 , Issue.4 , pp. 545-564
    • Berman, O.1    Ganz, Z.2    Wagner, J.M.3
  • 45
    • 1942539743 scopus 로고    scopus 로고
    • An approximation scheme for stochastic integer programs arising in capacity expansion
    • Ahmed, S., and Sahinidis, N. V., 2003, "An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion," Oper. Res., 51(3), pp. 461-471.
    • (2003) Oper. Res. , vol.51 , Issue.3 , pp. 461-471
    • Ahmed, S.1    Sahinidis, N.V.2
  • 46
    • 0042941240 scopus 로고    scopus 로고
    • Stochastic integer programming: General models and algorithms
    • Klein Haneveld, W. K., and van der Vlerk, M. H., 1999, "Stochastic Integer Programming: General Models and Algorithms," Ann. Operat. Res., 85, pp. 39-57.
    • (1999) Ann. Operat. Res. , vol.85 , pp. 39-57
    • Klein Haneveld, W.K.1    Van Der Vlerk, M.H.2
  • 47
    • 1942500445 scopus 로고    scopus 로고
    • Optimization under uncertainty: State-of-the-art and opportunities
    • Sahinidis, N. V., 2004, "Optimization Under Uncertainty: State-of-the-Art and Opportunities," Comput. Chem. Eng., 28(6-7), pp. 971-983.
    • (2004) Comput. Chem. Eng. , vol.28 , Issue.6-7 , pp. 971-983
    • Sahinidis, N.V.1
  • 48
    • 33746415203 scopus 로고    scopus 로고
    • Monotonicity and active set strategies in probabilistic design optimization
    • Chan, K. Y., Skerlos, S., and Papalambros, P. Y., 2006, "Monotonicity and Active Set Strategies in Probabilistic Design Optimization," ASME J. Mech. Des., 128(4), pp. 893-900.
    • (2006) ASME J. Mech. Des. , vol.128 , Issue.4 , pp. 893-900
    • Chan, K.Y.1    Skerlos, S.2    Papalambros, P.Y.3
  • 50
    • 3843118715 scopus 로고    scopus 로고
    • On bridging the gap between stochastic integer programming and MIP solver technologies
    • Parija, G. R., Ahmed, S., and King, A. J., 2004, "On Bridging the Gap Between Stochastic Integer Programming and MIP Solver Technologies," INFORMS J. Comput., 16(1), pp. 73-83.
    • (2004) INFORMS J. Comput. , vol.16 , Issue.1 , pp. 73-83
    • Parija, G.R.1    Ahmed, S.2    King, A.J.3
  • 51
    • 0022768294 scopus 로고
    • SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM.
    • Baybars, I., 1986, "A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem," Manage. Sci., 32(8), pp. 909-932. (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.