Volumn 48, Issue 6, 2010, Pages 1787-1804

Heuristic procedures for solving the general assembly line balancing problem with setups

Author keywords

Assembly line balancing; Production; Sequence dependent setup times

Indexed keywords

ASSEMBLY LINE BALANCING; GENERAL ASSEMBLY; HEURISTIC PROCEDURES; PRIORITY RULES; PRODUCTION SEQUENCES; SEQUENCE-DEPENDENT SETUP TIME; SET-UP TIME; SIMPLE ASSEMBLY LINE BALANCING;

EID: 74549129380     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802577979     Document Type: Article
Times cited : (69)

References (49)
  • 1
    • 0031541297 scopus 로고    scopus 로고
    • Concurrent operations assignment and sequencing for particular assembly problems in flow lines
    • Agnetis, A. and Arbib, C., 1997. Concurrent operations assignment and sequencing for particular assembly problems in flow lines. Annals of Operations Research, 69 (0), 1-31.
    • (1997) Annals of Operations Research , vol.69 , Issue.0 , pp. 1-31
    • Agnetis, A.1    Arbib, C.2
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D., and Aldowaisan, T., 1999. A review of scheduling research involving setup considerations. Omega, 27 (2), 219-239.
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi, A., et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1
  • 4
    • 36849023499 scopus 로고    scopus 로고
    • Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    • Andrés, C., Miralles, C., and Pastor, R., 2008. Balancing and scheduling tasks in assembly lines with sequence-dependent setup times. European Journal of Operational Research, 187 (3), 1212-1223.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1212-1223
    • Andrés, C.1    Miralles, C.2    Pastor, R.3
  • 6
    • 25144463245 scopus 로고    scopus 로고
    • Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds
    • Amen, M., 2006. Cost-oriented assembly line balancing: model formulations, solution difficulty, upper and lower bounds. European Journal of Operational Research, 168 (3), 747-770.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 747-770
    • Amen, M.1
  • 7
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus, A.L., 1966. COMSOAL: a computer method of sequencing operations for assembly lines. International Journal of Production Research, 4 (4), 259-277.
    • (1966) International Journal of Production Research , vol.4 , Issue.4 , pp. 259-277
    • Arcus, A.L.1
  • 10
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars, I., 1986. A survey of exact algorithms for the simple assembly line balancing problem. Management Science, 32 (8), 909-932.
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 11
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalised assembly line balancing
    • Becker, C. and Scholl, A., 2006. A survey on problems and methods in generalised assembly line balancing. European Journal of Operational Research, 168 (3), 694-715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 13
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin, J. and Rubinovitz, J., 2003. A weighted approach for assembly line design with station paralleling and equipment selection. IIE Transactions, 35 (1), 73-85.
    • (2003) IIE Transactions , vol.35 , Issue.1 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 14
    • 42649114477 scopus 로고    scopus 로고
    • ASALBP: The alternative subgraphs assembly line balancing problem
    • Capacho, L. and Pastor, R., 2008. ASALBP: the alternative subgraphs assembly line balancing problem. International Journal of Production Research, 46 (13), 3503-3516.
    • (2008) International Journal of Production Research , vol.46 , Issue.13 , pp. 3503-3516
    • Capacho, L.1    Pastor, R.2
  • 15
    • 64549088104 scopus 로고    scopus 로고
    • Capacho, L., et al., 2007. An evaluation ofconstructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics (online 27 October 2007), doi: 10.1007/s10732-007- 9063-x.
    • Capacho, L., et al., 2007. An evaluation ofconstructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics (online 27 October 2007), doi: 10.1007/s10732-007- 9063-x.
  • 16
    • 7444231627 scopus 로고    scopus 로고
    • A hybrid method combining continuous tabu search and Nelder-Mead simplex algorithms for the global minimisation of multiminima functions
    • Chelouah, R. and Siarry, P., 2005. A hybrid method combining continuous tabu search and Nelder-Mead simplex algorithms for the global minimisation of multiminima functions. European Journal ofOperational Research, 161 (3), 636-654.
    • (2005) European Journal ofOperational Research , vol.161 , Issue.3 , pp. 636-654
    • Chelouah, R.1    Siarry, P.2
  • 18
    • 40649088035 scopus 로고    scopus 로고
    • Balancing assembly line with skilled and unskilled workers
    • Corominas, A., Pastor, R., and Plans, J., 2008. Balancing assembly line with skilled and unskilled workers. OMEGA, 36 (6), 1126-1132.
    • (2008) OMEGA , vol.36 , Issue.6 , pp. 1126-1132
    • Corominas, A.1    Pastor, R.2    Plans, J.3
  • 19
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel, E. and Sarin, S., 1998. A survey of the assembly line balancing procedures. Production Planning & Control, 9 (5), 414-434.
    • (1998) Production Planning & Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.2
  • 20
    • 0000049494 scopus 로고
    • Greedy randomised adaptative search procedures
    • Feo, T.A. and Resende, M.G., 1995. Greedy randomised adaptative search procedures. Journal of Global Optimisation, 6 (2), 109-133.
    • (1995) Journal of Global Optimisation , vol.6 , Issue.2 , pp. 109-133
    • Feo, T.A.1    Resende, M.G.2
  • 21
    • 7544243412 scopus 로고    scopus 로고
    • Comparison of heuristics for flowtime minimisation in permutation flowshops
    • Framinan, J.M., Leisten, R., and Ruiz-Usano, R., 2005. Comparison of heuristics for flowtime minimisation in permutation flowshops. Computers & Operations Research, 32 (5), 1237-1254.
    • (2005) Computers & Operations Research , vol.32 , Issue.5 , pp. 1237-1254
    • Framinan, J.M.1    Leisten, R.2    Ruiz-Usano, R.3
  • 22
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., Grassi, A., and Rimini, B., 2006. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics, 102 (2), 226-243.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 23
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, R.J., 1989. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27 (4), 637-670.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 25
    • 74549161657 scopus 로고    scopus 로고
    • design problems. Operations Research, 31 (3), 522-545.
    • design problems. Operations Research, 31 (3), 522-545.
  • 26
    • 0001108060 scopus 로고
    • Assembly line balancing using the ranked positional weight technique
    • Helgeson, W.B. and Birnie, D.P., 1961. Assembly line balancing using the ranked positional weight technique. Journal ofIndustrial Engineering, 12 (6), 394-398.
    • (1961) Journal ofIndustrial Engineering , vol.12 , Issue.6 , pp. 394-398
    • Helgeson, W.B.1    Birnie, D.P.2
  • 27
    • 0032251894 scopus 로고    scopus 로고
    • Convergence properties of the Nelder-Mead simplex method in low dimensions
    • Lagarias, J.C., et al., 1998. Convergence properties of the Nelder-Mead simplex method in low dimensions. SIAM Journal on Optimisation, 9 (1), 112-147.
    • (1998) SIAM Journal on Optimisation , vol.9 , Issue.1 , pp. 112-147
    • Lagarias, J.C.1
  • 28
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • Miltenburg, J., 2001. U-shaped production lines: a review of theory and practice. International Journal of Production Economics, 70 (3), 201-214.
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 29
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem. Application to sheltered work centres for disabled
    • Miralles, C., et al., 2008. Branch and bound procedures for solving the assembly line worker assignment and balancing problem. Application to sheltered work centres for disabled. Discrete Applied Mathematics, 156 (3), 352-367.
    • (2008) Discrete Applied Mathematics , vol.156 , Issue.3 , pp. 352-367
    • Miralles, C.1
  • 30
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie, C.L. and Young, H.H., 1965. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering, 16 (1), 23-29.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 31
    • 0000238336 scopus 로고
    • A simplex method for function minimisation
    • Nelder, J.A. and Mead, R., 1965. A simplex method for function minimisation. The Computer Journal, 7 (4), 308-313.
    • (1965) The Computer Journal , vol.7 , Issue.4 , pp. 308-313
    • Nelder, J.A.1    Mead, R.2
  • 32
    • 0031122267 scopus 로고    scopus 로고
    • A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    • Park, K., Park, S., and Kim, W., 1997. A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Computers & Industrial Engineering, 32 (2), 321-332.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.2 , pp. 321-332
    • Park, K.1    Park, S.2    Kim, W.3
  • 33
    • 0036902263 scopus 로고    scopus 로고
    • Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the tasks dispersion
    • Pastor, R., et al., 2002. Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the tasks dispersion. Journal of the Operational Research Society, 53 (12), 1317-1323.
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.12 , pp. 1317-1323
    • Pastor, R.1
  • 34
    • 70449674529 scopus 로고    scopus 로고
    • An improved mathematical program to solve the simple assembly line balancing problem
    • to be published, doi:10.1080/00207540701713832
    • Pastor, R. and Ferrer, L., 2008. An improved mathematical program to solve the simple assembly line balancing problem. International Journal of Production Research (to be published), doi:10.1080/00207540701713832.
    • (2008) International Journal of Production Research
    • Pastor, R.1    Ferrer, L.2
  • 36
    • 0036966648 scopus 로고    scopus 로고
    • State of art of optimisation methods for assembly line design
    • Rekiek, B., et al., 2002. State of art of optimisation methods for assembly line design. Annual Reviews in Control, 26 (2), 163-174.
    • (2002) Annual Reviews in Control , vol.26 , Issue.2 , pp. 163-174
    • Rekiek, B.1
  • 37
    • 37049022197 scopus 로고    scopus 로고
    • An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
    • Ruiz, R. and Stutzle, T., 2008. An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives. European Journal of Operational Research, 187 (3), 1143-1159.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1143-1159
    • Ruiz, R.1    Stutzle, T.2
  • 38
    • 0037097830 scopus 로고    scopus 로고
    • Balancing and scheduling of surface mount technology lines
    • Sawik, T., 2002. Balancing and scheduling of surface mount technology lines. International Journal of Production Research, 40 (9), 1973-1991.
    • (2002) International Journal of Production Research , vol.40 , Issue.9 , pp. 1973-1991
    • Sawik, T.1
  • 39
    • 0003545561 scopus 로고    scopus 로고
    • ed, 2nd ed. Heidelberg, Germany: Physica-Verlag
    • Scholl, A., 1999. ed., Balancing and sequencing ofassembly lines. 2nd ed. Heidelberg, Germany: Physica-Verlag.
    • (1999) Balancing and sequencing ofassembly lines
  • 40
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl, A. and Becker, C., 2006. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 168 (3), 666-693.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 41
    • 43449085514 scopus 로고    scopus 로고
    • The sequence-dependent assembly line balancing problem
    • Scholl, A., Boysen, N., and Fliedner, M., 2008. The sequence-dependent assembly line balancing problem. OR Spectrum, 30 (3), 579-609.
    • (2008) OR Spectrum , vol.30 , Issue.3 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 42
    • 0001193704 scopus 로고    scopus 로고
    • SALOME: A bidirectional branch and bound procedure for assembly line balancing
    • Scholl, A. and Klein, R., 1997. SALOME: a bidirectional branch and bound procedure for assembly line balancing. Informs Journal on Computing, 9 (4), 319-334.
    • (1997) Informs Journal on Computing , vol.9 , Issue.4 , pp. 319-334
    • Scholl, A.1    Klein, R.2
  • 44
    • 0031543416 scopus 로고    scopus 로고
    • Simple assembly line balancing-heuristic approaches
    • Scholl, A. and Voß, S., 1996. Simple assembly line balancing-heuristic approaches. Journal of Heuristics, 2 (3), 217-244.
    • (1996) Journal of Heuristics , vol.2 , Issue.3 , pp. 217-244
    • Scholl, A.1    Voß, S.2
  • 45
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • Talbot, F.B., Patterson, J.H., and Gehrlein, W.V., 1986. A comparative evaluation of heuristic line balancing techniques. Management Science, 32 (4), 430-454.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 47
    • 0020116655 scopus 로고
    • Assembly line balancing as generalised bin packing
    • Wee, T.S. and Magazine, M.J., 1982. Assembly line balancing as generalised bin packing. Operations Research Letters, 1 (2), 56-58.
    • (1982) Operations Research Letters , vol.1 , Issue.2 , pp. 56-58
    • Wee, T.S.1    Magazine, M.J.2
  • 48
    • 0032651420 scopus 로고    scopus 로고
    • A column-generation approach for the assembly system design problem with tool changes
    • Wilhelm, W.E., 1999. A column-generation approach for the assembly system design problem with tool changes. International Journal of Flexible Manufacturing Systems, 11 (2), 177-205.
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.2 , pp. 177-205
    • Wilhelm, W.E.1
  • 49
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • Zhu, X. and Wilhelm, W.E., 2006. Scheduling and lot sizing with sequence-dependent setup: a literature review. IIE Transactions, 38 (18), 987-1007.
    • (2006) IIE Transactions , vol.38 , Issue.18 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.