메뉴 건너뛰기




Volumn 26, Issue 4, 2010, Pages 237-246

Optimizing resource utilization during the recovery of civil infrastructure systems

Author keywords

Civil infrastructure systems; Construction management; Disaster recovery; Infrastructure; Natural disasters; Optimization; Project planning; Reconstruction; Reconstruction efforts; Recovery planning; Resource allocation

Indexed keywords

CIVIL INFRASTRUCTURE SYSTEMS; CONSTRUCTION MANAGEMENT; DISASTER RECOVERY; INFRASTRUCTURE; NATURAL DISASTERS; PROJECT PLANNING; RECONSTRUCTION; RECONSTRUCTION EFFORTS; RECOVERY PLANNING;

EID: 77956836698     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000024     Document Type: Article
Times cited : (59)

References (38)
  • 1
    • 33846367323 scopus 로고    scopus 로고
    • Assessment of damage to urban buried infrastructure in the aftermath of Hurricanes Katrina and Rita
    • , ASCE, Reston, Va.
    • Allouche, E. N., Sterling, R. L., Chisolm, E., Hill, D., and Hall, D. (2006). " Assessment of damage to urban buried infrastructure in the aftermath of Hurricanes Katrina and Rita.." ASCE Conf. Proc., ASCE, Reston, Va., 50.
    • (2006) ASCE Conf. Proc. , pp. 50
    • Allouche, E.N.1    Sterling, R.L.2    Chisolm, E.3    Hill, D.4    Hall, D.5
  • 2
    • 77956828598 scopus 로고    scopus 로고
    • Information/data needs for floodplain management
    • ASCE, Reston, Va.
    • Birkenstock, T., and Bourget, P. (2000). " Information/data needs for floodplain management.." ASCE Conf. Proc., ASCE, Reston, Va., 116.
    • (2000) ASCE Conf. Proc. , pp. 116
    • Birkenstock, T.1    Bourget, P.2
  • 3
    • 70449727657 scopus 로고    scopus 로고
    • Transportation system modeling and decision support for catastrophic event planning in the Central United States: A case study of St. Louis area
    • , ASCE, Reston, Va.
    • Chang, L., Elnashai, A. S., and Spencer, B. F. (2009). " Transportation system modeling and decision support for catastrophic event planning in the Central United States: A case study of St. Louis area.." ASCE Conf. Proc., ASCE, Reston, Va., 7.
    • (2009) ASCE Conf. Proc. , pp. 7
    • Chang, L.1    Elnashai, A.S.2    Spencer, B.F.3
  • 4
    • 9144254156 scopus 로고    scopus 로고
    • Evaluating Disaster Mitigations: Methodology for Urban Infrastructure Systems
    • DOI 10.1061/(ASCE)1527-6988(2003)4:4(186)
    • Chang, S. E. (2003). " Evaluating disaster mitigations: Methodology for urban infrastructure systems.." Nat. Hazards Rev. NHREFO 1527-6988, 4 (4), 186-196. 10.1061/(ASCE)1527-6988(2003)4:4(186) (Pubitemid 37365012)
    • (2003) NATURAL HAZARDS REVIEW , vol.4 , Issue.4 , pp. 186-196
    • Chang, S.E.1
  • 5
    • 0035400397 scopus 로고    scopus 로고
    • Measuring post-disaster transportation system performance: The 1995 Kobe earthquake in comparative perspective
    • DOI 10.1016/S0965-8564(00)00003-3, PII S0965856400000033
    • Chang, S. E., and Nojima, N. (2001). " Measuring post-disaster transportation system performance: The 1995 Kobe earthquake in comparative perspective.." Transp. Res., Part A: Policy Pract. TRPPEC 0965-8564, 35 (6), 475-494. 10.1016/S0965-8564(00)00003-3 (Pubitemid 32550762)
    • (2001) Transportation Research Part A: Policy and Practice , vol.35 , Issue.6 , pp. 475-494
    • Chang, S.E.1    Nojima, N.2
  • 6
    • 33846831075 scopus 로고    scopus 로고
    • A fuzzy multi-objective model for reconstructing the post-quake road-network by genetic algorithm
    • ZZZZZZ 1562-2479
    • Chen, Y. -W., and Tzeng, G. -H. (1999). " A fuzzy multi-objective model for reconstructing the post-quake road-network by genetic algorithm.." Int. J. Fuzzy Syst. ZZZZZZ 1562-2479, 1 (2), 85-95.
    • (1999) Int. J. Fuzzy Syst. , vol.1 , Issue.2 , pp. 85-95
    • Chen, Y.-W.1    Tzeng, G.-H.2
  • 8
    • 33751290672 scopus 로고    scopus 로고
    • Multiproject planning and resource controls for facility management
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1294), 004612QCO
    • East, E. W., and Liu, L. Y. (2006). " Multiproject planning resource controls for facility management.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (12), 1294-1305. 10.1061/(ASCE)0733-9364(2006)132:12(1294) (Pubitemid 44794269)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1294-1305
    • East, E.W.1    Liu, L.Y.2
  • 9
    • 60449101309 scopus 로고    scopus 로고
    • Optimizing large-scale temporary housing arrangements after natural disasters
    • JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(2009)23:2(110)
    • El-Anwar, O., El-Rayes, K., and Elnashai, A. (2009). " Optimizing large-scale temporary housing arrangements after natural disasters.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 23 (2), 110-118. 10.1061/(ASCE)0887- 3801(2009)23:2(110)
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.2 , pp. 110-118
    • El-Anwar, O.1    El-Rayes, K.2    Elnashai, A.3
  • 10
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade-off analysis for highway construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(477)
    • El-Rayes, K., and Kandil, A. (2005). " Time-cost-quality trade off analysis for highway construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (4), 477-486. 10.1061/(ASCE)0733-9364(2005)131:4(477) (Pubitemid 40430144)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 477-486
    • El-Rayes, K.1    Kandil, A.2
  • 11
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(18)
    • El-Rayes, K., and Moselhi, O. (2001). " Optimizing resource utilization for repetitive construction projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (1), 18-27. 10.1061/(ASCE)0733-9364(2001)127:1(18) (Pubitemid 32158955)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 12
    • 77956826875 scopus 로고    scopus 로고
    • Prevention and repair measures for infrastructure natural disaster risk management
    • ASCE, Reston, Va.
    • Greenstein, J. (2003). " Prevention and repair measures for infrastructure natural disaster risk management.." ASCE Conf. Proc., ASCE, Reston, Va., 81.
    • (2003) ASCE Conf. Proc. , pp. 81
    • Greenstein, J.1
  • 13
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 14
    • 12744251346 scopus 로고    scopus 로고
    • Distributed scheduling model for infrastructure networks
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(160)
    • Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure networks.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (2), 160-167. 10.1061/(ASCE)0733-9364(2004)130:2(160) (Pubitemid 40265382)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 160-167
    • Hegazy, T.1    Elhakeem, A.2    Elbeltagi, E.3
  • 16
    • 60649088091 scopus 로고    scopus 로고
    • Water rationing model for consequence minimization of water infrastructure destruction
    • JWRMD5 0733-9496, 10.1061/(ASCE)0733-9496(2009)135:2(80)
    • Jeong, H. S., and Abraham, D. M. (2009). " Water rationing model for consequence minimization of water infrastructure destruction.." J. Water Resour. Plann. Manage. JWRMD5 0733-9496, 135 (2), 80-89. 10.1061/(ASCE)0733- 9496(2009)135:2(80)
    • (2009) J. Water Resour. Plann. Manage. , vol.135 , Issue.2 , pp. 80-89
    • Jeong, H.S.1    Abraham, D.M.2
  • 17
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:5(491)
    • Kandil, A., and El-Rayes, K. (2006). " Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (5), 491-498. 10.1061/(ASCE)0733-9364(2006)132:5(491)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 18
    • 33847225537 scopus 로고    scopus 로고
    • Fund allocation for transportation network recovery following natural disasters
    • JUPDDM 0733-9488, 10.1061/(ASCE)0733-9488(2007)133:1(82)
    • Karlaftis, M. G., Kepaptsoglou, K. L., and Lambropoulos, S. (2007). " Fund allocation for transportation network recovery following natural disasters.." J. Urban Plann. Dev. JUPDDM 0733-9488, 133 (1), 82-89. 10.1061/(ASCE)0733-9488(2007)133:1(82)
    • (2007) J. Urban Plann. Dev. , vol.133 , Issue.1 , pp. 82-89
    • Karlaftis, M.G.1    Kepaptsoglou, K.L.2    Lambropoulos, S.3
  • 19
    • 37249037472 scopus 로고    scopus 로고
    • Minimizing construction-related security risks during airport expansion projects
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(40)
    • Khalafallah, A., and El-Rayes, K. (2008). " Minimizing construction-related security risks during airport expansion projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (1), 40-48. 10.1061/(ASCE)0733- 9364(2008)134:1(40) (Pubitemid 350265377)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 40-48
    • Khalafallah, A.1    El-Rayes, K.2
  • 20
    • 0036715492 scopus 로고    scopus 로고
    • Prioritization of schedule dependencies in hurricane recovery of transportation agency
    • DOI 10.1061/(ASCE)1076-0342(2002)8:3(103)
    • Lambert, J. H., and Patterson, C. E. (2002). " Prioritization of schedule dependencies in hurricane recovery of transportation agency.." J. Infrastruct. Syst. JITSE4 1076-0342, 8 (3), 103-111. 10.1061/(ASCE)1076- 0342(2002)8:3(103) (Pubitemid 35016337)
    • (2002) Journal of Infrastructure Systems , vol.8 , Issue.3 , pp. 103-111
    • Lambert, J.H.1    Patterson, C.E.2
  • 21
    • 84865859399 scopus 로고    scopus 로고
    • An analysis of the alliancing procurement method for reconstruction following an earthquake
    • , Earthquake Engineering Research Institute (EERI), Oakland
    • Le Masurier, J., Wilkinson, S., and Shestakova, Y. (2006). " An analysis of the alliancing procurement method for reconstruction following an earthquake.." Proc., 8th U.S. National Conf. on Earthquake Engineering, Earthquake Engineering Research Institute (EERI), Oakland.
    • (2006) Proc., 8th U.S. National Conf. on Earthquake Engineering
    • Le Masurier, J.1    Wilkinson, S.2    Shestakova, Y.3
  • 22
    • 77956851865 scopus 로고    scopus 로고
    • Managing the earthquake risk: Research and implementation efforts on Utah's highway infrastructure
    • ASCE, Reston, Va.
    • Leonard, B. D. (2003). " Managing the earthquake risk: Research and implementation efforts on Utah's highway infrastructure.." ASCE Conf. Proc., ASCE, Reston, Va., 10.
    • (2003) ASCE Conf. Proc. , pp. 10
    • Leonard, B.D.1
  • 23
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • Leu, S. -S., and Yang, C. -H. (1999). " GA-based multicriteria optimal model for construction scheduling.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 24
    • 0347186791 scopus 로고    scopus 로고
    • 22nd Ed., Reed Construction Data, Kingston, Mass
    • Means, R. S. (2008). Heavy construction cost data, 22nd Ed., Reed Construction Data, Kingston, Mass.
    • (2008) Heavy Construction Cost Data
    • Means, R.S.1
  • 25
    • 77956846941 scopus 로고    scopus 로고
    • Expediting assessment of damaged buildings during disaster response using mobile ad hoc networks
    • ASCE, Reston, Va.
    • Mehta, S., and Pea-Mora, F. (2009). " Expediting assessment of damaged buildings during disaster response using mobile ad hoc networks.." ASCE Conf. Proc., ASCE, Reston, Va., 22.
    • (2009) ASCE Conf. Proc. , pp. 22
    • Mehta, S.1    Pea-Mora, F.2
  • 26
    • 70349317365 scopus 로고    scopus 로고
    • Optimizing postdisaster reconstruction planning for damaged transportation networks
    • JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000070
    • Orabi, W., El-Rayes, K., Senouci, A. B., and Al-Derham, H. (2009). " Optimizing postdisaster reconstruction planning for damaged transportation networks.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 1039-1048. 10.1061/(ASCE)CO.1943-7862.0000070
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 1039-1048
    • Orabi, W.1    El-Rayes, K.2    Senouci, A.B.3    Al-Derham, H.4
  • 27
    • 27144554213 scopus 로고    scopus 로고
    • Minimizing data requirements for disaster planning using integrated, efficient models
    • , ASCE, Reston, Va.
    • Perkins, T. K., VanBlaricum, V., Bozada, T., and Pride, R. (2005). " Minimizing data requirements for disaster planning using integrated, efficient models.." ASCE Conf. Proc., ASCE, Reston, Va., 23.
    • (2005) ASCE Conf. Proc. , pp. 23
    • Perkins, T.K.1    Vanblaricum, V.2    Bozada, T.3    Pride, R.4
  • 28
    • 38049172103 scopus 로고    scopus 로고
    • Normalized hurricane damages in the United States: 1900-2005
    • NHREFO 1527-6988, 10.1061/(ASCE)1527-6988(2008)9:1(29)
    • Pielke, R. A., Jr., Gratz, J., Landsea, C. W., Collins, D., Saunders, M. A., and Musulin, R. (2008). " Normalized hurricane damages in the United States: 1900-2005.." Nat. Hazards Rev. NHREFO 1527-6988, 9 (1), 29-42. 10.1061/(ASCE)1527-6988(2008)9:1(29)
    • (2008) Nat. Hazards Rev. , vol.9 , Issue.1 , pp. 29-42
    • Pielke Jr., R.A.1    Gratz, J.2    Landsea, C.W.3    Collins, D.4    Saunders, M.A.5    Musulin, R.6
  • 29
    • 33847129988 scopus 로고    scopus 로고
    • Infrastructure management information system framework requirements for disasters
    • DOI 10.1061/(ASCE)0887-3801(2007)21:2(90)
    • Pradhan, A. R., Laefer, D. F., and Rasdorf, W. J. (2007). " Infrastructure management information system framework requirements for disasters.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 21 (2), 90-101. 10.1061/(ASCE)0887-3801(2007)21:2(90) (Pubitemid 46280978)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.2 , pp. 90-101
    • Pradhan, A.R.1    Laefer, D.F.2    Rasdorf, W.J.3
  • 30
    • 77956854336 scopus 로고    scopus 로고
    • Nelson A. Rockefeller Institute of Government and Public Affairs Research Council of Louisiana (Dec. 17, 2008)
    • Rowley, K. (2008). " GulfGov reports: The role of community rebuilding plans in the hurricane recovery.." Nelson A. Rockefeller Institute of Government and Public Affairs Research Council of Louisiana, 〈 http://www.rockinst.org/disaster-recovery/ 〉 (Dec. 17, 2008).
    • (2008) GulfGov Reports: The Role of Community Rebuilding Plans in the Hurricane Recovery
    • Rowley, K.1
  • 31
    • 0011101775 scopus 로고
    • Optimization of post-earthquake restoration of lifeline networks using genetic algorithms
    • Public Works Research Institute, Osaka, Japan
    • Sato, T., and Ichii, K. (1995). " Optimization of post-earthquake restoration of lifeline networks using genetic algorithms.." Proc., 6th U.S.-Japan Workshop on Earthquake Disaster Prevention for Lifeline Systems, Public Works Research Institute, Osaka, Japan.
    • (1995) Proc., 6th U.S.-Japan Workshop on Earthquake Disaster Prevention for Lifeline Systems
    • Sato, T.1    Ichii, K.2
  • 32
    • 77956794762 scopus 로고    scopus 로고
    • Prioritization of seismic reinforcement for road bridges based on the concept of life cycle cost
    • , ASCE, Reston, Va.
    • Sato, T., Yoshida, I., and Masumoto, M. (2003). " Prioritization of seismic reinforcement for road bridges based on the concept of life cycle cost.." ASCE Conf. Proc., ASCE, Reston, Va., 24.
    • (2003) ASCE Conf. Proc. , pp. 24
    • Sato, T.1    Yoshida, I.2    Masumoto, M.3
  • 33
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • Senouci, A. B., and Eldin, N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 34
    • 33847221437 scopus 로고    scopus 로고
    • System risk curves: Probabilistic performance scenarios for highway networks subject to earthquake damage
    • JITSE4 1076-0342, 10.1061/(ASCE)1076-0342(2007)13:1(43)
    • Shiraki, N., Shinozuka, M., Moore, J. E., II, Chang, S. E., Kameda, H., and Tanaka, S. (2007). " System risk curves: Probabilistic performance scenarios for highway networks subject to earthquake damage.." J. Infrastruct. Syst. JITSE4 1076-0342, 13 (1), 43-54. 10.1061/(ASCE)1076- 0342(2007)13:1(43)
    • (2007) J. Infrastruct. Syst. , vol.13 , Issue.1 , pp. 43-54
    • Shiraki, N.1    Shinozuka, M.2    Moore, J.E.I.I.3    Chang, S.E.4    Kameda, H.5    Tanaka, S.6
  • 35
    • 70449726699 scopus 로고    scopus 로고
    • Modeling of restoration process associated with critical infrastructure and its interdependency due to a seismic disaster
    • ASCE, Reston, Va.
    • Shoji, G., and Toyota, A. (2009). " Modeling of restoration process associated with critical infrastructure and its interdependency due to a seismic disaster.." ASCE Conf. Proc., ASCE, Reston, Va., 62.
    • (2009) ASCE Conf. Proc. , pp. 62
    • Shoji, G.1    Toyota, A.2
  • 36
    • 77956806427 scopus 로고    scopus 로고
    • A building blackbox for urban disaster response and relief
    • , ASCE, Reston, Va.
    • Tsai, M., Liu, L. Y., and Pea-Mora, F. (2007). " A building blackbox for urban disaster response and relief.." ASCE Conf. Proc., ASCE, Reston, Va., 96.
    • (2007) ASCE Conf. Proc. , pp. 96
    • Tsai, M.1    Liu, L.Y.2    Pea-Mora, F.3
  • 37
    • 77956829894 scopus 로고    scopus 로고
    • Community preparedness and response model for protecting infrastructures
    • , ASCE, Reston, Va.
    • Uddin, N., Engi, D., and Haque, A. (2003). " Community preparedness and response model for protecting infrastructures.." ASCE Conf. Proc., ASCE, Reston, Va., 3.
    • (2003) ASCE Conf. Proc. , pp. 3
    • Uddin, N.1    Engi, D.2    Haque, A.3
  • 38
    • 32144449889 scopus 로고    scopus 로고
    • Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects
    • DOI 10.1080/01446190500184311, PII U3444313557857
    • Zhang, H., Li, H., and Tam, C. M. (2006). " Heuristic scheduling of resource-constrained, multiple mode and repetitive projects.." Journal of Construction Management and Economics, 24, 159-169. 10.1080/01446190500184311 (Pubitemid 43203269)
    • (2006) Construction Management and Economics , vol.24 , Issue.2 , pp. 159-169
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.