메뉴 건너뛰기




Volumn 7, Issue 3, 2010, Pages 708-715

Approximate analysis of reentrant lines with Bernoulli reliability model

Author keywords

Bernoulli reliability; last buffer first serve (LBFS); production rate; reentrant lines

Indexed keywords

APPROXIMATE ANALYSIS; BERNOULLI; BERNOULLI RELIABILITY; MANUFACTURING SYSTEM; PRODUCTION RATES; RE-ENTRANT LINES; RECURSIVE PROCEDURE; RELIABILITY MODEL; SCHEDULING POLICIES; WASHING OPERATION;

EID: 77954384258     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2009.2021463     Document Type: Article
Times cited : (32)

References (18)
  • 1
    • 70449688145 scopus 로고    scopus 로고
    • Throughput analysis in production systems: Recent advances and future topics
    • J. Li, D. E. Blumenfeld, N. Huang, and J. M. Alden, "Throughput analysis in production systems: Recent advances and future topics," Int. J. Prod. Res., vol.47, pp. 3823-3851, 2009.
    • (2009) Int. J. Prod. Res. , vol.47 , pp. 3823-3851
    • Li, J.1    Blumenfeld, D.E.2    Huang, N.3    Alden, J.M.4
  • 2
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Aug.
    • L. M. Wein, "Scheduling semiconductor wafer fabrication," IEEE Trans. Semicond. Manuf., vol.1, pp. 115-130, Aug. 1988.
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , pp. 115-130
    • Wein, L.M.1
  • 3
    • 21144477219 scopus 로고
    • Re-entrant lines
    • P. R. Kumar, "Re-entrant lines," Queueing Syst., vol.13, pp. 87-110, 1993.
    • (1993) Queueing Syst , vol.13 , pp. 87-110
    • Kumar, P.R.1
  • 4
    • 0035485518 scopus 로고    scopus 로고
    • Queueing network models in the design and analysis of semiconductor wafer fabs
    • Oct.
    • S. Kumar and P. R. Kumar, "Queueing network models in the design and analysis of semiconductor wafer fabs," IEEE Trans. Robot. Automat., vol.17, pp. 548-561, Oct. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 5
    • 0030086281 scopus 로고    scopus 로고
    • Stability and instability of fluid models for certain re-entrant lines
    • J. G. Dai and G. Weiss, "Stability and instability of fluid models for certain re-entrant lines," Math. Oper. Res., vol.21, pp. 115-134, 1996.
    • (1996) Math. Oper. Res. , vol.21 , pp. 115-134
    • Dai, J.G.1    Weiss, G.2
  • 6
    • 0029771094 scopus 로고    scopus 로고
    • Performance analysis of scheduling policies in re-entrant manufacturing systems
    • Y. Narahari and L. M. Khan, "Performance analysis of scheduling policies in re-entrant manufacturing systems," Comput. Oper. Res., vol.23, pp. 37-51, 1996.
    • (1996) Comput. Oper. Res. , vol.23 , pp. 37-51
    • Narahari, Y.1    Khan, L.M.2
  • 7
    • 0038199835 scopus 로고    scopus 로고
    • A generalized stochastic petri net model for performance analysis and control of capacitated re-entrant lines
    • Jun.
    • J. Y. Choi and S. A. Reveliotis, "A generalized stochastic petri net model for performance analysis and control of capacitated re-entrant lines," IEEE Trans. Robot. Automat., vol.19, pp. 474-480, Jun. 2003.
    • (2003) IEEE Trans. Robot. Automat. , vol.19 , pp. 474-480
    • Choi, J.Y.1    Reveliotis, S.A.2
  • 8
    • 23844441654 scopus 로고    scopus 로고
    • Relative value function approximation for the capacitated re-entrant line scheduling problem
    • Jul.
    • J. Y. Choi and S. A. Reveliotis, "Relative value function approximation for the capacitated re-entrant line scheduling problem," IEEE Trans. Automat. Sci. Eng., vol.2, pp. 285-299, Jul. 2005.
    • (2005) IEEE Trans. Automat. Sci. Eng. , vol.2 , pp. 285-299
    • Choi, J.Y.1    Reveliotis, S.A.2
  • 9
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Aug.
    • S. H. Lu, D. Ramaswam, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants," IEEE Trans. Semicond. Manuf., vol.7, pp. 374-388, Aug. 1994.
    • (1994) IEEE Trans. Semicond. Manuf. , vol.7 , pp. 374-388
    • Lu, S.H.1    Ramaswam, D.2    Kumar, P.R.3
  • 10
    • 17444424631 scopus 로고    scopus 로고
    • Performance evaluation of production lines with finite buffer capacity producing two different products
    • M. Colledani, A. Matta, and T. Tolio, "Performance evaluation of production lines with finite buffer capacity producing two different products," OR Spectrum, vol.27, pp. 243-263, 2005.
    • (2005) OR Spectrum , vol.27 , pp. 243-263
    • Colledani, M.1    Matta, A.2    Tolio, T.3
  • 11
    • 42449123014 scopus 로고    scopus 로고
    • Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers
    • M. Colledani, F. Gandola, A. Matta, and T. Tolio, "Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers," IIE Trans., vol.40, pp. 612-626, 2008.
    • (2008) IIE Trans , vol.40 , pp. 612-626
    • Colledani, M.1    Gandola, F.2    Matta, A.3    Tolio, T.4
  • 12
    • 3242682462 scopus 로고    scopus 로고
    • Performance analysis of production systems with rework loops
    • J. Li, "Performance analysis of production systems with rework loops," IIE Trans., vol.36, pp. 755-765, 2004.
    • (2004) IIE Trans , vol.36 , pp. 755-765
    • Li, J.1
  • 13
    • 3042630551 scopus 로고    scopus 로고
    • Throughput analysis in automotive paint shops: A case study
    • Jul.
    • J. Li, "Throughput analysis in automotive paint shops: A case study," IEEE Trans. Automat. Sci. Eng., vol.1, pp. 90-98, Jul. 2004.
    • (2004) IEEE Trans. Automat. Sci. Eng. , vol.1 , pp. 90-98
    • Li, J.1
  • 14
    • 12844287589 scopus 로고    scopus 로고
    • Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems
    • Jan.
    • J. Li, "Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems," IEEE Trans. Automat. Sci. Eng., vol.2, pp. 40-53, Jan. 2005.
    • (2005) IEEE Trans. Automat. Sci. Eng. , vol.2 , pp. 40-53
    • Li, J.1
  • 15
    • 35348899105 scopus 로고    scopus 로고
    • Queueing theory for semiconductor manufacturing systems: A survey and open problems
    • Oct.
    • J. G. Shanthikumar, S. Ding, and M. T. Zhang, "Queueing theory for semiconductor manufacturing systems: A survey and open problems," IEEE Trans. Automat. Sci. Eng., vol.4, pp. 513-522, Oct. 2007.
    • (2007) IEEE Trans. Automat. Sci. Eng. , vol.4 , pp. 513-522
    • Shanthikumar, J.G.1    Ding, S.2    Zhang, M.T.3
  • 17
    • 32644458004 scopus 로고    scopus 로고
    • Comparison of two-machine line models in throughput analysis
    • J. Li, D. E. Blumenfeld, and J. M. Alden, "Comparison of two-machine line models in throughput analysis," Int. J. Prod. Res., vol.44, pp. 1375-1398, 2006.
    • (2006) Int. J. Prod. Res. , vol.44 , pp. 1375-1398
    • Li, J.1    Blumenfeld, D.E.2    Alden, J.M.3
  • 18
    • 0033689252 scopus 로고    scopus 로고
    • The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing network
    • Mar.
    • S. A. Reveliotis, "The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing network," IEEE Trans. Automat. Contr., vol.45, pp. 585-588, Mar. 2000.
    • (2000) IEEE Trans. Automat. Contr. , vol.45 , pp. 585-588
    • Reveliotis, S.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.