-
1
-
-
70449688145
-
Throughput analysis in production systems: Recent advances and future topics
-
J. Li, D. E. Blumenfeld, N. Huang, and J. M. Alden, "Throughput analysis in production systems: Recent advances and future topics," Int. J. Prod. Res., vol.47, pp. 3823-3851, 2009.
-
(2009)
Int. J. Prod. Res.
, vol.47
, pp. 3823-3851
-
-
Li, J.1
Blumenfeld, D.E.2
Huang, N.3
Alden, J.M.4
-
2
-
-
0024055865
-
Scheduling semiconductor wafer fabrication
-
Aug.
-
L. M. Wein, "Scheduling semiconductor wafer fabrication," IEEE Trans. Semicond. Manuf., vol.1, pp. 115-130, Aug. 1988.
-
(1988)
IEEE Trans. Semicond. Manuf.
, vol.1
, pp. 115-130
-
-
Wein, L.M.1
-
3
-
-
21144477219
-
Re-entrant lines
-
P. R. Kumar, "Re-entrant lines," Queueing Syst., vol.13, pp. 87-110, 1993.
-
(1993)
Queueing Syst
, vol.13
, pp. 87-110
-
-
Kumar, P.R.1
-
4
-
-
0035485518
-
Queueing network models in the design and analysis of semiconductor wafer fabs
-
Oct.
-
S. Kumar and P. R. Kumar, "Queueing network models in the design and analysis of semiconductor wafer fabs," IEEE Trans. Robot. Automat., vol.17, pp. 548-561, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, pp. 548-561
-
-
Kumar, S.1
Kumar, P.R.2
-
5
-
-
0030086281
-
Stability and instability of fluid models for certain re-entrant lines
-
J. G. Dai and G. Weiss, "Stability and instability of fluid models for certain re-entrant lines," Math. Oper. Res., vol.21, pp. 115-134, 1996.
-
(1996)
Math. Oper. Res.
, vol.21
, pp. 115-134
-
-
Dai, J.G.1
Weiss, G.2
-
6
-
-
0029771094
-
Performance analysis of scheduling policies in re-entrant manufacturing systems
-
Y. Narahari and L. M. Khan, "Performance analysis of scheduling policies in re-entrant manufacturing systems," Comput. Oper. Res., vol.23, pp. 37-51, 1996.
-
(1996)
Comput. Oper. Res.
, vol.23
, pp. 37-51
-
-
Narahari, Y.1
Khan, L.M.2
-
7
-
-
0038199835
-
A generalized stochastic petri net model for performance analysis and control of capacitated re-entrant lines
-
Jun.
-
J. Y. Choi and S. A. Reveliotis, "A generalized stochastic petri net model for performance analysis and control of capacitated re-entrant lines," IEEE Trans. Robot. Automat., vol.19, pp. 474-480, Jun. 2003.
-
(2003)
IEEE Trans. Robot. Automat.
, vol.19
, pp. 474-480
-
-
Choi, J.Y.1
Reveliotis, S.A.2
-
8
-
-
23844441654
-
Relative value function approximation for the capacitated re-entrant line scheduling problem
-
Jul.
-
J. Y. Choi and S. A. Reveliotis, "Relative value function approximation for the capacitated re-entrant line scheduling problem," IEEE Trans. Automat. Sci. Eng., vol.2, pp. 285-299, Jul. 2005.
-
(2005)
IEEE Trans. Automat. Sci. Eng.
, vol.2
, pp. 285-299
-
-
Choi, J.Y.1
Reveliotis, S.A.2
-
9
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
-
Aug.
-
S. H. Lu, D. Ramaswam, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants," IEEE Trans. Semicond. Manuf., vol.7, pp. 374-388, Aug. 1994.
-
(1994)
IEEE Trans. Semicond. Manuf.
, vol.7
, pp. 374-388
-
-
Lu, S.H.1
Ramaswam, D.2
Kumar, P.R.3
-
10
-
-
17444424631
-
Performance evaluation of production lines with finite buffer capacity producing two different products
-
M. Colledani, A. Matta, and T. Tolio, "Performance evaluation of production lines with finite buffer capacity producing two different products," OR Spectrum, vol.27, pp. 243-263, 2005.
-
(2005)
OR Spectrum
, vol.27
, pp. 243-263
-
-
Colledani, M.1
Matta, A.2
Tolio, T.3
-
11
-
-
42449123014
-
Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers
-
M. Colledani, F. Gandola, A. Matta, and T. Tolio, "Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers," IIE Trans., vol.40, pp. 612-626, 2008.
-
(2008)
IIE Trans
, vol.40
, pp. 612-626
-
-
Colledani, M.1
Gandola, F.2
Matta, A.3
Tolio, T.4
-
12
-
-
3242682462
-
Performance analysis of production systems with rework loops
-
J. Li, "Performance analysis of production systems with rework loops," IIE Trans., vol.36, pp. 755-765, 2004.
-
(2004)
IIE Trans
, vol.36
, pp. 755-765
-
-
Li, J.1
-
13
-
-
3042630551
-
Throughput analysis in automotive paint shops: A case study
-
Jul.
-
J. Li, "Throughput analysis in automotive paint shops: A case study," IEEE Trans. Automat. Sci. Eng., vol.1, pp. 90-98, Jul. 2004.
-
(2004)
IEEE Trans. Automat. Sci. Eng.
, vol.1
, pp. 90-98
-
-
Li, J.1
-
14
-
-
12844287589
-
Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems
-
Jan.
-
J. Li, "Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems," IEEE Trans. Automat. Sci. Eng., vol.2, pp. 40-53, Jan. 2005.
-
(2005)
IEEE Trans. Automat. Sci. Eng.
, vol.2
, pp. 40-53
-
-
Li, J.1
-
15
-
-
35348899105
-
Queueing theory for semiconductor manufacturing systems: A survey and open problems
-
Oct.
-
J. G. Shanthikumar, S. Ding, and M. T. Zhang, "Queueing theory for semiconductor manufacturing systems: A survey and open problems," IEEE Trans. Automat. Sci. Eng., vol.4, pp. 513-522, Oct. 2007.
-
(2007)
IEEE Trans. Automat. Sci. Eng.
, vol.4
, pp. 513-522
-
-
Shanthikumar, J.G.1
Ding, S.2
Zhang, M.T.3
-
17
-
-
32644458004
-
Comparison of two-machine line models in throughput analysis
-
J. Li, D. E. Blumenfeld, and J. M. Alden, "Comparison of two-machine line models in throughput analysis," Int. J. Prod. Res., vol.44, pp. 1375-1398, 2006.
-
(2006)
Int. J. Prod. Res.
, vol.44
, pp. 1375-1398
-
-
Li, J.1
Blumenfeld, D.E.2
Alden, J.M.3
-
18
-
-
0033689252
-
The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing network
-
Mar.
-
S. A. Reveliotis, "The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing network," IEEE Trans. Automat. Contr., vol.45, pp. 585-588, Mar. 2000.
-
(2000)
IEEE Trans. Automat. Contr.
, vol.45
, pp. 585-588
-
-
Reveliotis, S.A.1
|