메뉴 건너뛰기




Volumn 19, Issue 3, 2003, Pages 474-480

A generalized stochastic petri net model for performance analysis and control of capacitated reentrant lines

Author keywords

Capacitated reentrant lines; Performance modeling and control; Scheduling; Timed Petri nets

Indexed keywords

CAPACITANCE; PERFORMANCE; PETRI NETS; SCHEDULING;

EID: 0038199835     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/TRA.2003.810577     Document Type: Review
Times cited : (53)

References (17)
  • 1
    • 0000231669 scopus 로고
    • Scheduling manufacturing systems of reentrant lines
    • D. D. Yao, Ed. New York: Springer-Verlag
    • P. R. Kumar, "Scheduling manufacturing systems of reentrant lines," in Stochastic Modeling and Analysis of Manufacturing Systems, D. D. Yao, Ed. New York: Springer-Verlag, 1994, pp. 325-360.
    • (1994) Stochastic Modeling and Analysis of Manufacturing Systems , pp. 325-360
    • Kumar, P.R.1
  • 2
    • 0035485518 scopus 로고    scopus 로고
    • Queueing network models in the design and analysis of semiconductor wafer fabs
    • Oct.
    • S. Kumar and P. R. Kumar, "Queueing network models in the design and analysis of semiconductor wafer fabs," IEEE Trans. Robot. Automat., vol. 17, pp. 548-561, Oct. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 3
    • 0003006313 scopus 로고    scopus 로고
    • High-fidelity rapid prototyping of 300-mm fabs through discrete event system modeling
    • J. Park, S. A. Reveliotis, D. Bodner, C. Zhou, J.-F. Wu, and L. McGinnis, "High-fidelity rapid prototyping of 300-mm fabs through discrete event system modeling," Comput. Industry, vol. 1528, pp. 1-20, 2001.
    • (2001) Comput. Industry , vol.1528 , pp. 1-20
    • Park, J.1    Reveliotis, S.A.2    Bodner, D.3    Zhou, C.4    Wu, J.-F.5    McGinnis, L.6
  • 4
    • 0033689252 scopus 로고    scopus 로고
    • The destabilizing effect of blocking due to finite buffering capacity in multiclass queueing networks
    • Mar.
    • S. A. Reveliotis, "The destabilizing effect of blocking due to finite buffering capacity in multiclass queueing networks," IEEE Trans. Automat. Contr., vol. 45, pp. 585-588, Mar. 2000.
    • (2000) IEEE Trans. Automat. Contr. , vol.45 , pp. 585-588
    • Reveliotis, S.A.1
  • 5
    • 84976753721 scopus 로고
    • A class of generalized stochastic Petri nets for performance evaluation of multiprocessor systems
    • M. A. Marsan, G. Conte, and G. Balbo, "A class of generalized stochastic Petri nets for performance evaluation of multiprocessor systems." ACM Trans. Comput. Syst., vol. 2, pp. 93-122, 1984.
    • (1984) ACM Trans. Comput. Syst. , vol.2 , pp. 93-122
    • Marsan, M.A.1    Conte, G.2    Balbo, G.3
  • 9
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach
    • Aug.
    • M. Zhou and M. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach," IEEE Trans. Semiconduct. Manufact., vol. 11, pp. 33-357, Aug. 1998.
    • (1998) IEEE Trans. Semiconduct. Manufact. , vol.11 , pp. 33-357
    • Zhou, M.1    Jeng, M.2
  • 10
    • 0034294127 scopus 로고    scopus 로고
    • Markovian-timed Petri nets for performance analysis of semiconductor manufacturing systems
    • Oct.
    • M. Jeng, X. Xie, and W.-Y. Hung, "Markovian-timed Petri nets for performance analysis of semiconductor manufacturing systems," IEEE Trans. Syst., Man, Cybern. - Part B, vol. 30, pp. 757-771, Oct. 2000.
    • (2000) IEEE Trans. Syst., Man, Cybern. - Part B , vol.30 , pp. 757-771
    • Jeng, M.1    Xie, X.2    Hung, W.-Y.3
  • 11
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct.
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Automat., vol. 17, pp. 562-575, Oct. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , pp. 562-575
    • Zuberek, W.M.1
  • 13
    • 0025624142 scopus 로고
    • Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows
    • Dec.
    • Z. A. Banaszak and B. H. Krogh, "Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows," IEEE Trans. Robot. Automat., vol. 6, pp. 724-734, Dec. 1990.
    • (1990) IEEE Trans. Robot. Automat. , vol.6 , pp. 724-734
    • Banaszak, Z.A.1    Krogh, B.H.2
  • 17
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • Dec.
    • S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Trans. Automat. Contr., vol. 36, pp. 1406-1416, Dec. 1991.
    • (1991) IEEE Trans. Automat. Contr. , vol.36 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.