-
1
-
-
0009143417
-
Virtual stations and the capacity of two-station queueing networks
-
ISyE
-
J. G. Dai and J. H. Vande Vate, "Virtual stations and the capacity of two-station queueing networks," Georgia Tech., Technical Rep., ISyE, 1996.
-
(1996)
Georgia Tech., Technical Rep.
-
-
Dai, J.G.1
Vande Vate, J.H.2
-
2
-
-
0025401166
-
Dynamic instabilities and stabilization methods indistributed real-time scheduling of manufacturing systems
-
P. R. Kumar and T. I. Seidman, "Dynamic instabilities and stabilization methods indistributed real-time scheduling of manufacturing systems," IEEE Trans. Automat. Contr., vol. 35, pp. 289-298, 1990.
-
(1990)
IEEE Trans. Automat. Contr.
, vol.35
, pp. 289-298
-
-
Kumar, P.R.1
Seidman, T.I.2
-
3
-
-
0000231669
-
Scheduling manufacturing systems of re-entrant lines
-
D. D. Yao, Ed. New York, NY: Springer-Verlag
-
P. R. Kumar, "Scheduling manufacturing systems of re-entrant lines," in Stochastic Modeling and Analysis of Manufacturing Systems, D. D. Yao, Ed. New York, NY: Springer-Verlag, 1994, pp. 325-360.
-
(1994)
Stochastic Modeling and Analysis of Manufacturing Systems
, pp. 325-360
-
-
Kumar, P.R.1
-
4
-
-
0028744478
-
Scheduling semiconductor manufacturing plants
-
_, "Scheduling semiconductor manufacturing plants," IEEE Contr. Syst. Mag., vol. 14, no. 6, pp. 33-40, 1994.
-
(1994)
IEEE Contr. Syst. Mag.
, vol.14
, Issue.6
, pp. 33-40
-
-
-
5
-
-
0026369803
-
Distributed scheduling based on due dates and buffer priorities
-
S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Trans. Automat. Contr., vol. 36, pp. 1406-1416, 1991.
-
(1991)
IEEE Trans. Automat. Contr.
, vol.36
, pp. 1406-1416
-
-
Lu, S.H.1
Kumar, P.R.2
-
6
-
-
0003054955
-
A survey of scheduling rules
-
S. S. Panwalkar and W. Iskander, "A survey of scheduling rules," Oper. Res., vol. 25, pp. 45-61, 1977.
-
(1977)
Oper. Res.
, vol.25
, pp. 45-61
-
-
Panwalkar, S.S.1
Iskander, W.2
-
7
-
-
33749879052
-
Structural control of large-scale flexibly automated manufacturing systems
-
C. T. Leondes, Ed. London, U.K.: Gordon & Breach
-
S. A. Reveliotis, M. A. Lawley, and P. M. Ferreira, "Structural control of large-scale flexibly automated manufacturing systems," in Computer Aided and Integrated Manufacturing Systems Techniques and Applications, C. T. Leondes, Ed. London, U.K.: Gordon & Breach.
-
Computer Aided and Integrated Manufacturing Systems Techniques and Applications
-
-
Reveliotis, S.A.1
Lawley, M.A.2
Ferreira, P.M.3
-
8
-
-
0028525902
-
'First come first serve' can be unstable
-
T. I. Seidman, "'First come first serve' can be unstable," IEEE Trans. Automat. Contr., vol. 39, pp. 2166-2171, 1994.
-
(1994)
IEEE Trans. Automat. Contr.
, vol.39
, pp. 2166-2171
-
-
Seidman, T.I.1
-
9
-
-
0030192952
-
Some kanban-controlled manufacturing systems: A first stability analysis
-
T. I. Seidman and C. J. Humes, "Some kanban-controlled manufacturing systems: A first stability analysis," IEEE Trans. Automat. Contr., vol. 41, pp. 1013-1018, 1996.
-
(1996)
IEEE Trans. Automat. Contr.
, vol.41
, pp. 1013-1018
-
-
Seidman, T.I.1
Humes, C.J.2
-
10
-
-
0029324121
-
Stability and performance of a simple distributed tracking policy for production control of manufacturing systems
-
A. Sharifnia, "Stability and performance of a simple distributed tracking policy for production control of manufacturing systems," IEEE Trans. Automat. Contr., vol. 40, pp. 1109-1113, 1995.
-
(1995)
IEEE Trans. Automat. Contr.
, vol.40
, pp. 1109-1113
-
-
Sharifnia, A.1
-
11
-
-
0031102412
-
Instability of the join-the-shortest-queue and fcfs policies in queueing systems and their stabilization
-
_, "Instability of the join-the-shortest-queue and fcfs policies in queueing systems and their stabilization," Operations Res, vol. 45, pp. 309-314, 1997.
-
(1997)
Operations Res
, vol.45
, pp. 309-314
-
-
|