Volumn 125, Issue 2, 2000, Pages 324-339

Scheduling a flowline manufacturing cell with sequence dependent family setup times

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CELLULAR MANUFACTURING; HEURISTIC METHODS; PROCESS ENGINEERING; SCHEDULING; STATISTICAL METHODS;

EID: 0033720051     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00387-2     Document Type: Article
Times cited : (142)

References (15)
  • 2
    • 0025256245 scopus 로고
    • Scheduling groups of jobs in the two-machine flow shop
    • Baker K.R. Scheduling groups of jobs in the two-machine flow shop. Mathematical and Computer Modelling. 13:1990;29-36.
    • (1990) Mathematical and Computer Modelling , vol.13 , pp. 29-36
    • Baker, K.R.1
  • 3
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job, m-machine sequencing problem
    • Campbell H.G., Dudek R.A., Smith M.L. A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science. 16:1970;B630-B637.
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 5
    • 0017516618 scopus 로고
    • An evaluation of flow shop sequencing heuristics
    • Dannenbring D.G. An evaluation of flow shop sequencing heuristics. Management Science. 23:1977;1174-1182.
    • (1977) Management Science , vol.23 , pp. 1174-1182
    • Dannenbring, D.G.1
  • 6
    • 0000587970 scopus 로고
    • Three heuristic rules for sequencing jobs to a single production facility
    • Gavett J.W. Three heuristic rules for sequencing jobs to a single production facility. Management Science. 2:1965;B166-B176.
    • (1965) Management Science , vol.2
    • Gavett, J.W.1
  • 10
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with set-up times
    • Johnson S.M. Optimal two and three stage production schedules with set-up times. Naval Research Logistics Quarterly. 1:1954;61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 14
    • 0024700013 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • Taillard E. Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research. 41:1989;186-193.
    • (1989) European Journal of Operational Research , vol.41 , pp. 186-193
    • Taillard, E.1
  • 15
    • 84989723711 scopus 로고
    • A simulated annealing approach to scheduling a manufacturing cell
    • Vakharia A.J., Chang Y.L. A simulated annealing approach to scheduling a manufacturing cell. Naval Research Logistics. 37:1990;559-577.
    • (1990) Naval Research Logistics , vol.37 , pp. 559-577
    • Vakharia, A.J.1    Chang, Y.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.