-
1
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. OMEGA 27 (1999) 219-239
-
(1999)
OMEGA
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
2
-
-
0025256245
-
Scheduling groups of jobs in the two-machine flowshop
-
Baker K.R. Scheduling groups of jobs in the two-machine flowshop. Mathematical and Computer Modeling 13 (1990) 29-36
-
(1990)
Mathematical and Computer Modeling
, vol.13
, pp. 29-36
-
-
Baker, K.R.1
-
3
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine sequencing problem
-
Campbell H.G., Dudek R.A., and Smith M.L. A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science 16 (1970) B630-B637
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
4
-
-
0028698198
-
Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
-
Cetinkaya F.C. Lot streaming in a two-stage flow shop with set-up, processing and removal times separated. Journal of the Operational Research Society 45 (1994) 1445-1455
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
7
-
-
20344369817
-
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
-
Das S.R., and Canel C. An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system. International Journal of Production Economics 97 (2005) 247-262
-
(2005)
International Journal of Production Economics
, vol.97
, pp. 247-262
-
-
Das, S.R.1
Canel, C.2
-
8
-
-
0036067263
-
Scheduling jobs on parallel machines with sequence-dependent family setup times
-
Eom D.-H., Shin H.-J., Kwun I.-H., Shim J.-K., and Kim S.-S. Scheduling jobs on parallel machines with sequence-dependent family setup times. Advanced Manufacturing Technology 19 (2002) 926-932
-
(2002)
Advanced Manufacturing Technology
, vol.19
, pp. 926-932
-
-
Eom, D.-H.1
Shin, H.-J.2
Kwun, I.-H.3
Shim, J.-K.4
Kim, S.-S.5
-
9
-
-
14644435008
-
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
-
Franca P.M., Gupta J.N.D., Mendes A.S., Moscato P., and Veltink K.J. Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers & Industrial Engineering 48 3 (2005) 491-506
-
(2005)
Computers & Industrial Engineering
, vol.48
, Issue.3
, pp. 491-506
-
-
Franca, P.M.1
Gupta, J.N.D.2
Mendes, A.S.3
Moscato, P.4
Veltink, K.J.5
-
10
-
-
0022865373
-
Future paths for intger programming and links to artificial intelligence
-
Glover F. Future paths for intger programming and links to artificial intelligence. Computer and Operations Research 13 (1986) 533-549
-
(1986)
Computer and Operations Research
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
11
-
-
0004215426
-
-
Kluwer Academic Publisher, Dordrecht, MA
-
Glover F., and Laguna M. Tabu Search (1997), Kluwer Academic Publisher, Dordrecht, MA
-
(1997)
Tabu Search
-
-
Glover, F.1
Laguna, M.2
-
12
-
-
31444449761
-
Minimizing flow time in a flow-line manufacturing cell with family setup times
-
Gupta J.N.D., and Schaller J.E. Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society 57 (2006) 163-176
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 163-176
-
-
Gupta, J.N.D.1
Schaller, J.E.2
-
13
-
-
21444451875
-
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
-
Logendran R., Salmasi N., and Sriskandarajah Ch. Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & Operations Research 33 (2004) 158-180
-
(2004)
Computers & Operations Research
, vol.33
, pp. 158-180
-
-
Logendran, R.1
Salmasi, N.2
Sriskandarajah, Ch.3
-
15
-
-
0026220052
-
A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
-
Mahmoodi F., and Dooley K.J. A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. International Journal of Production Research 29 9 (1991) 1923-1939
-
(1991)
International Journal of Production Research
, vol.29
, Issue.9
, pp. 1923-1939
-
-
Mahmoodi, F.1
Dooley, K.J.2
-
16
-
-
0142248230
-
A genetic algorithm for multiple objective dealing with exceptional elements in cellular manufacturing
-
Mansouri S.A., Moattar-Husseini S.M., and Zegordi S.H. A genetic algorithm for multiple objective dealing with exceptional elements in cellular manufacturing. Production Planning & Control 14 5 (2003) 437-446
-
(2003)
Production Planning & Control
, vol.14
, Issue.5
, pp. 437-446
-
-
Mansouri, S.A.1
Moattar-Husseini, S.M.2
Zegordi, S.H.3
-
17
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow shop sequencing problem
-
Nawaz M., Enscore E., and Ham I. A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. OMEGA, International Journal of Management Science 11 (1983) 91-95
-
(1983)
OMEGA, International Journal of Management Science
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.2
Ham, I.3
-
19
-
-
0033297212
-
Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flow time and weighted tardiness of jobs
-
Rajendran C., and Ziegler H. Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flow time and weighted tardiness of jobs. Computers & Industrial Engineering 37 (1999) 671-690
-
(1999)
Computers & Industrial Engineering
, vol.37
, pp. 671-690
-
-
Rajendran, C.1
Ziegler, H.2
-
20
-
-
0034688379
-
A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
-
Schaller J. A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell. International Journal of Production Research 38 2 (2000) 287-308
-
(2000)
International Journal of Production Research
, vol.38
, Issue.2
, pp. 287-308
-
-
Schaller, J.1
-
21
-
-
0035501183
-
A new lower bound for the flow shop group scheduling problem
-
Schaller J. A new lower bound for the flow shop group scheduling problem. Computers & Industrial Engineering 41 (2001) 151-161
-
(2001)
Computers & Industrial Engineering
, vol.41
, pp. 151-161
-
-
Schaller, J.1
-
24
-
-
0001117904
-
Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints
-
Sekiguchi Y. Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints. Journal of the Operations Research Society of Japan 26 (1983) 226-251
-
(1983)
Journal of the Operations Research Society of Japan
, vol.26
, pp. 226-251
-
-
Sekiguchi, Y.1
-
27
-
-
0027814376
-
Scheduling in a cellular manufacturing system: a simulated annealing approach
-
Sridhar J., and Rajendran C. Scheduling in a cellular manufacturing system: a simulated annealing approach. International Journal of Production Research 31 12 (1993) 2927-2945
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
28
-
-
0001751273
-
A genetic algorithm for family and job scheduling in a flow-line manufacturing cell
-
Sridhar J., and Rajendran C. A genetic algorithm for family and job scheduling in a flow-line manufacturing cell. Computers and Industrial Engineering 27 (1994) 469-472
-
(1994)
Computers and Industrial Engineering
, vol.27
, pp. 469-472
-
-
Sridhar, J.1
Rajendran, C.2
-
29
-
-
84989723711
-
A simulated annealing approach to scheduling a manufacturing cell
-
Vakharia A.J., and Chang Y.L. A simulated annealing approach to scheduling a manufacturing cell. Naval Research Logistics 37 (1990) 559-577
-
(1990)
Naval Research Logistics
, vol.37
, pp. 559-577
-
-
Vakharia, A.J.1
Chang, Y.L.2
-
30
-
-
0026896286
-
Two- and three-machine flow shop scheduling problems with equal sized transfer batches
-
Vickson R.G., and Alfredson B.E. Two- and three-machine flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research 30 (1992) 1551-1574
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1551-1574
-
-
Vickson, R.G.1
Alfredson, B.E.2
-
31
-
-
9644287019
-
Job and family scheduling of a flow-line manufacturing cell: a simulation study
-
Wemmerlov U., and Vakharia A.J. Job and family scheduling of a flow-line manufacturing cell: a simulation study. IIE Transactions 23 (1991) 383-393
-
(1991)
IIE Transactions
, vol.23
, pp. 383-393
-
-
Wemmerlov, U.1
Vakharia, A.J.2
|