메뉴 건너뛰기




Volumn 48, Issue 2, 2005, Pages 357-362

Flow shop vs. permutation shop with time delays

Author keywords

Flow shop; Makespan; Permutation schedules

Indexed keywords

COMPUTATIONAL METHODS; MATHEMATICAL MODELS; PROBLEM SOLVING; PROCESS ENGINEERING; SCHEDULING; THEOREM PROVING;

EID: 14044252063     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2005.01.019     Document Type: Article
Times cited : (16)

References (6)
  • 1
    • 0030235028 scopus 로고    scopus 로고
    • Shop problems with two machines and time lags
    • M. Dell'Amico Shop problems with two machines and time lags Operation Research 44 1996 777 787
    • (1996) Operation Research , vol.44 , pp. 777-787
    • Dell'Amico, M.1
  • 2
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • S.M. Johnson Optimal two- and three-stage production schedules with setup times included Naval Research Logistics Quarterly 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.