메뉴 건너뛰기




Volumn 102, Issue 1, 2006, Pages 66-86

Sequence-dependent group scheduling problems in flexible flow shops

Author keywords

Flexible flow shops; Heuristics; Sequence dependent group scheduling; Split plot design

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; INDUSTRIAL APPLICATIONS; PRODUCTION ENGINEERING; STATISTICAL METHODS;

EID: 33644858890     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.02.006     Document Type: Article
Times cited : (93)

References (44)
  • 3
    • 0002844386 scopus 로고
    • Scheduling the production of components at a common facility
    • K.R. Baker Scheduling the production of components at a common facility IIE Transactions 20 1988 32 35
    • (1988) IIE Transactions , vol.20 , pp. 32-35
    • Baker, K.R.1
  • 5
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n job, m machine sequencing problem
    • H.G. Campbell, R.A. Dudek, and M.L. Smith A heuristic algorithm for the n job, m machine sequencing problem Management Science 16 1970 B630 B637
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 8
    • 0022865373 scopus 로고
    • Future paths for integer programming and links to artificial intelligence
    • F. Glover Future paths for integer programming and links to artificial intelligence Journal of Computers and Operations Research 13 1986 533 549
    • (1986) Journal of Computers and Operations Research , vol.13 , pp. 533-549
    • Glover, F.1
  • 11
    • 0002703574 scopus 로고
    • Tabu-search: A tutorial
    • F. Glover Tabu-search: a tutorial Interfaces 20 1990 74 94
    • (1990) Interfaces , vol.20 , pp. 74-94
    • Glover, F.1
  • 12
    • 0002311638 scopus 로고
    • Approximate schedules for the two-machine flowshop with sequence dependent setup times
    • J.N.D. Gupta, and W.P. Darrow Approximate schedules for the two-machine flowshop with sequence dependent setup times Indian Journal of Management and Systems 1 1985 6 11
    • (1985) Indian Journal of Management and Systems , vol.1 , pp. 6-11
    • Gupta, J.N.D.1    Darrow, W.P.2
  • 15
    • 0024714857 scopus 로고
    • Group technology in US manufacturing industry: A survey of current practices
    • N.K. Hyer, and U. Wemmerlov Group technology in US manufacturing industry: A survey of current practices International Journal of Production Research 27 1989 1287 1304
    • (1989) International Journal of Production Research , vol.27 , pp. 1287-1304
    • Hyer, N.K.1    Wemmerlov, U.2
  • 20
    • 0033743240 scopus 로고    scopus 로고
    • Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design
    • R. Logendran, and V. Sirikrai Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design Journal of the Operational Research Society 51 2000 609 624
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 609-624
    • Logendran, R.1    Sirikrai, V.2
  • 21
    • 0031103522 scopus 로고    scopus 로고
    • Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
    • R. Logendran, and A. Sonthinen Tabu search-based approach for scheduling job-shop type flexible manufacturing systems Journal of the Operational Research Society 48 1997 264 277
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 264-277
    • Logendran, R.1    Sonthinen, A.2
  • 22
    • 1642328443 scopus 로고    scopus 로고
    • Unrelated parallel machine scheduling with job splitting
    • R. Logendran, and F. Subur Unrelated parallel machine scheduling with job splitting IIE Transactions 36 4 2004 359 372
    • (2004) IIE Transactions , vol.36 , Issue.4 , pp. 359-372
    • Logendran, R.1    Subur, F.2
  • 26
    • 84960650840 scopus 로고
    • Group production scheduling for minimum total tardiness: Part i
    • N. Nakamura, T. Yoshida, and K. Hitomi Group production scheduling for minimum total tardiness: Part I AIIE Transactions 10 1978 157 162
    • (1978) AIIE Transactions , vol.10 , pp. 157-162
    • Nakamura, N.1    Yoshida, T.2    Hitomi, K.3
  • 32
    • 0242333827 scopus 로고    scopus 로고
    • Heuristics for scheduling sequence dependent set-up jobs in flow line cells
    • V. Reddy, and T.T. Narendran Heuristics for scheduling sequence dependent set-up jobs in flow line cells International Journal of Production Research 41 1 2003 193 206
    • (2003) International Journal of Production Research , vol.41 , Issue.1 , pp. 193-206
    • Reddy, V.1    Narendran, T.T.2
  • 33
    • 0002434711 scopus 로고
    • A solution to a special case of flow shop scheduling problems
    • S.E. Elmaghraby Springer Berlin
    • M.S. Salvador A solution to a special case of flow shop scheduling problems S.E. Elmaghraby Symposium on the Theory of Scheduling and its Applications 1973 Springer Berlin 83 91
    • (1973) Symposium on the Theory of Scheduling and Its Applications , pp. 83-91
    • Salvador, M.S.1
  • 34
    • 0004298908 scopus 로고    scopus 로고
    • SAS Institute Inc., Cary, North Carolina, USA
    • SAS Release 8.2, 1999-2001, SAS Institute Inc., Cary, North Carolina, USA.
    • (1999) SAS Release 8.2
  • 36
    • 84877027692 scopus 로고
    • Scheduling flexible flow lines with no in-process buffers
    • T.J. Sawik Scheduling flexible flow lines with no in-process buffers International Journal of Production Research 33 5 1995 1357 1367
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1357-1367
    • Sawik, T.J.1
  • 37
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • T.J. Sawik Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers Mathematical and Computer Modeling 31 2000 39 52
    • (2000) Mathematical and Computer Modeling , vol.31 , pp. 39-52
    • Sawik, T.J.1
  • 38
    • 0037200415 scopus 로고    scopus 로고
    • An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers
    • T.J. Sawik An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers Mathematical and Computer Modeling 36 2002 461 471
    • (2002) Mathematical and Computer Modeling , vol.36 , pp. 461-471
    • Sawik, T.J.1
  • 40
    • 0024769054 scopus 로고
    • Scheduling algorithm for flexible flowshops: Worst and average case performance
    • C. Sriskandarajah, and S.P. Sethi Scheduling algorithm for flexible flowshops: Worst and average case performance European Journal of Operational Research 43 1989 143 160
    • (1989) European Journal of Operational Research , vol.43 , pp. 143-160
    • Sriskandarajah, C.1    Sethi, S.P.2
  • 41
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • D.R. Sule Sequencing n jobs on two machines with setup, processing and removal times separated Naval Research Logistics Quarterly 29 1982 517 519
    • (1982) Naval Research Logistics Quarterly , vol.29 , pp. 517-519
    • Sule, D.R.1
  • 43
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • S. Webster, and K.R. Baker Scheduling groups of jobs on a single machine Operations Research 43 1995 692 703
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 44
    • 0024016313 scopus 로고    scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • R. Wittrock An adaptable scheduling algorithm for flexible flow lines Operations Research 36 3 1998 445 453
    • (1998) Operations Research , vol.36 , Issue.3 , pp. 445-453
    • Wittrock, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.