메뉴 건너뛰기




Volumn 40, Issue 2, 2010, Pages 285-300

The analytic supporting tools for business reengineering with system integration design

Author keywords

Analysis and decision making tools; Business process reengineering (BPR); Cost effective predictive analysis; Quality function deployment (QFD)

Indexed keywords

0-1-INTEGER PROGRAMMING; ANALYTIC TOOLS; ASSURANCE REGION; BUSINESS PROCESS; BUSINESS PROCESS RE-ENGINEERING; BUSINESS PROCESS REENGINEERING (BPR); BUSINESS REENGINEERING; BUSINESS STRATEGY; CORRELATION ANALYSIS; CUSTOMER REQUIREMENTS; ILLUSTRATIVE EXAMPLES; INTEGRATED TOOLS; OPERATIONAL LEVEL; PARAMETRIC OPTIMIZATION; PERFORMANCE LEVEL; PREDICTIVE ANALYSIS; PROCESS REENGINEERING; RATIONAL ANALYSIS; STOCHASTIC SIMULATIONS; STRATEGIC GOALS; STRUCTURED APPROACH; SUPPORTING TOOL; SYSTEM INTEGRATION; SYSTEMATIC ANALYSIS;

EID: 77249084114     PISSN: 10834427     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCA.2009.2037019     Document Type: Article
Times cited : (9)

References (58)
  • 1
    • 0032044783 scopus 로고    scopus 로고
    • Economic view of CIM system architecture
    • Apr./May
    • Y. Chen, M. M. Tseng, and J. Yien, "Economic view of CIM system architecture," Prod. Plan. Control, vol.9, no.3, pp. 241-249, Apr./May 1998.
    • (1998) Prod. Plan. Control , vol.9 , Issue.3 , pp. 241-249
    • Chen, Y.1    Tseng, M.M.2    Yien, J.3
  • 2
    • 0005859155 scopus 로고    scopus 로고
    • Competence and impact of tools for BPR
    • Dec.
    • I. Im, O. A. E. Sawy, and A. Hars, "Competence and impact of tools for BPR," Inf. Manage., vol.36, no.6, pp. 301-311, Dec. 1999.
    • (1999) Inf. Manage. , vol.36 , Issue.6 , pp. 301-311
    • Im, I.1    Sawy, O.A.E.2    Hars, A.3
  • 5
    • 85008035398 scopus 로고    scopus 로고
    • Business process analysis and optimization: Beyond reengineering
    • Jan.
    • K. Vergidis, A. Tiwari, and B. Majeed, "Business process analysis and optimization: Beyond reengineering," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol.38, no.1, pp. 69-82, Jan. 2008.
    • (2008) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.38 , Issue.1 , pp. 69-82
    • Vergidis, K.1    Tiwari, A.2    Majeed, B.3
  • 6
    • 0035502036 scopus 로고    scopus 로고
    • Algorithmical approaches to business process design
    • Nov.
    • I. Hofacker, R. Vetschera, I. Hofacker, and R. Vetschera, "Algorithmical approaches to business process design," Comput. Oper. Res., vol.28, no.13, pp. 1253-1275, Nov. 2001.
    • (2001) Comput. Oper. Res. , vol.28 , Issue.13 , pp. 1253-1275
    • Hofacker, I.1    Vetschera, R.2    Hofacker, I.3    Vetschera, R.4
  • 7
    • 0002481047 scopus 로고
    • The new industrial engineering: Information technology and business process redesign
    • Jul.
    • T. H. Davenport and J. E. Short, "The new industrial engineering: Information technology and business process redesign," Sloan Manage. Rev., vol.31, no.4, pp. 11-27, Jul. 1990.
    • (1990) Sloan Manage. Rev. , vol.31 , Issue.4 , pp. 11-27
    • Davenport, T.H.1    Short, J.E.2
  • 8
    • 0012684686 scopus 로고
    • Business process reengineering: Building a comprehensive methodology
    • S. Guha, W. J. Kettinger, and J. T. C. Teng, "Business process reengineering: Building a comprehensive methodology," Inf. Syst. Manage., vol.10, no.3, pp. 13-22, 1993.
    • (1993) Inf. Syst. Manage. , vol.10 , Issue.3 , pp. 13-22
    • Guha, S.1    Kettinger, W.J.2    Teng, J.T.C.3
  • 9
    • 0042722340 scopus 로고    scopus 로고
    • Aligning BPR to strategy: A framework for analysis
    • Feb.
    • W. J. Kettinger and J. T. C. Teng, "Aligning BPR to strategy: A framework for analysis," Long Range Plan., vol.31, no.1, pp. 93-107, Feb. 1998.
    • (1998) Long Range Plan. , vol.31 , Issue.1 , pp. 93-107
    • Kettinger, W.J.1    Teng, J.T.C.2
  • 10
    • 0033225598 scopus 로고    scopus 로고
    • A methodology and tool environment for process analysis and reengineering
    • Nov.
    • S. Castano, V. D. Antonellis, and M. A. Melchiori, "A methodology and tool environment for process analysis and reengineering," Data Knowl. Eng., vol.31, no.3, pp. 253-278, Nov. 1999.
    • (1999) Data Knowl. Eng. , vol.31 , Issue.3 , pp. 253-278
    • Castano, S.1    Antonellis, V.D.2    Melchiori, M.A.3
  • 11
    • 0036497750 scopus 로고    scopus 로고
    • Supply chain reengineering using a core process analysis matrix and object-oriented simulation
    • Mar.
    • S. W. Changchien and H. Y. Shen, "Supply chain reengineering using a core process analysis matrix and object-oriented simulation," Inf. Manage., vol.39, no.5, pp. 345-358, Mar. 2002.
    • (2002) Inf. Manage. , vol.39 , Issue.5 , pp. 345-358
    • Changchien, S.W.1    Shen, H.Y.2
  • 12
    • 0034294619 scopus 로고    scopus 로고
    • A benchmarking method for business-process reengineering and improvement
    • Oct.
    • S. Talluri, "A benchmarking method for business-process reengineering and improvement," Int. J. Flexible Manuf. Syst., vol.12, no.4, pp. 291- 304, Oct. 2000.
    • (2000) Int. J. Flexible Manuf. Syst. , vol.12 , Issue.4 , pp. 291-304
    • Talluri, S.1
  • 13
    • 0031221489 scopus 로고    scopus 로고
    • A QFD based performance measurement tool
    • Sep.
    • H. Jagdev, P. Bradley, and O. Molloy, "A QFD based performance measurement tool," Comput. Ind., vol.33, no.2, pp. 357-366, Sep. 1997.
    • (1997) Comput. Ind. , vol.33 , Issue.2 , pp. 357-366
    • Jagdev, H.1    Bradley, P.2    Molloy, O.3
  • 14
    • 3943107533 scopus 로고    scopus 로고
    • Fuzzy cognitive maps in business analysis and performance-driven change
    • Aug.
    • G. Xirogiannis and M. Glykas, "Fuzzy cognitive maps in business analysis and performance-driven change," IEEE Trans. Eng. Manag., vol.51, no.3, pp. 334-351, Aug. 2004.
    • (2004) IEEE Trans. Eng. Manag. , vol.51 , Issue.3 , pp. 334-351
    • Xirogiannis, G.1    Glykas, M.2
  • 15
    • 0037118762 scopus 로고    scopus 로고
    • Business process reengineering for healthcare system using multicriteria mathematical programming
    • Jul.
    • N. K. Kwak and C. W. Lee, "Business process reengineering for healthcare system using multicriteria mathematical programming," Eur. J. Oper. Res., vol.140, no.2, pp. 447-458, Jul. 2002.
    • (2002) Eur. J. Oper. Res. , vol.140 , Issue.2 , pp. 447-458
    • Kwak, N.K.1    Lee, C.W.2
  • 16
    • 0036187893 scopus 로고    scopus 로고
    • A synergistic framework for evaluating business process improvements
    • Jan.
    • J. Sarkis and S. Talluri, "A synergistic framework for evaluating business process improvements," Int. J. Flexible Manuf. Syst., vol.14, no.1, pp. 53-71, Jan. 2002.
    • (2002) Int. J. Flexible Manuf. Syst. , vol.14 , Issue.1 , pp. 53-71
    • Sarkis, J.1    Talluri, S.2
  • 19
    • 77249166851 scopus 로고
    • Standard Publications. Gaithersburg MD Integration Definition for Function Modeling (IDEF0) NIST. [Online]. Available:
    • Federal Inf. Process. Standard Publications. Gaithersburg, MD, Integration Definition for Function Modeling (IDEF0), 1993. NIST. [Online]. Available: http://www.idef.com/idef0.html
    • (1993) Federal Inf.Process
  • 21
    • 65649138463 scopus 로고    scopus 로고
    • A generic P/T net model and framework for concurrent integrated design and planning of electromechanical assemblies
    • May
    • X. F. Zha, "A generic P/T net model and framework for concurrent integrated design and planning of electromechanical assemblies," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol.39, no.3, pp. 514-527, May 2009.
    • (2009) IEEE Trans. Syst., Man, Cybern. A, Syst. Humans , vol.39 , Issue.3 , pp. 514-527
    • Zha, X.F.1
  • 22
    • 0037149315 scopus 로고    scopus 로고
    • Designing performance analysis and IDEF0 for enterprise modeling in BPR
    • Mar.
    • S. H. Kim and K. J. Jang, "Designing performance analysis and IDEF0 for enterprise modeling in BPR," Int. J. Prod. Econ., vol.76, no.2, pp. 121- 131, Mar. 2002.
    • (2002) Int. J. Prod. Econ. , vol.76 , Issue.2 , pp. 121-131
    • Kim, S.H.1    Jang, K.J.2
  • 24
    • 33845771763 scopus 로고    scopus 로고
    • Building a holarchy using business process-oriented holonic (PrOH) modeling
    • Jan.
    • B. T. Clegg, "Building a holarchy using business process-oriented holonic (PrOH) modeling," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol.37, no.1, pp. 23-40, Jan. 2007.
    • (2007) IEEE Trans. Syst., Man, Cybern. A, Syst. Humans , vol.37 , Issue.1 , pp. 23-40
    • Clegg, B.T.1
  • 25
    • 0034501549 scopus 로고    scopus 로고
    • Re-engineering of the design process for concurrent engineering
    • Dec.
    • D. Tang, L. Zheng, Z. Li, D. Li, and S. Zhang, "Re-engineering of the design process for concurrent engineering," Comput. Ind. Eng., vol.38, no.4, pp. 479-491, Dec. 2000.
    • (2000) Comput. Ind. Eng. , vol.38 , Issue.4 , pp. 479-491
    • Tang, D.1    Zheng, L.2    Li, Z.3    Li, D.4    Zhang, S.5
  • 26
    • 0000082326 scopus 로고    scopus 로고
    • Business process reengineering: An approach for process mapping
    • Oct.
    • T. A. Aldowaisan and L. K. Gaafa, "Business process reengineering: An approach for process mapping," Omega-Int. J. Manage. Sci., vol.27, no.5, pp. 515-524, Oct. 1999.
    • (1999) Omega-Int. J. Manage. Sci. , vol.27 , Issue.5 , pp. 515-524
    • Aldowaisan, T.A.1    Gaafa, L.K.2
  • 27
    • 35648980567 scopus 로고    scopus 로고
    • Project-oriented resource assignment: From business process modeling to business process instantiation with operational performance consideration
    • Jan.
    • Y. Zhou and Y. Chen, "Project-oriented resource assignment: From business process modeling to business process instantiation with operational performance consideration," Int. J. Comput. Integr. Manuf., vol.21, no.1, pp. 97-110, Jan. 2008.
    • (2008) Int. J. Comput. Integr. Manuf. , vol.21 , Issue.1 , pp. 97-110
    • Zhou, Y.1    Chen, Y.2
  • 28
    • 0242721402 scopus 로고    scopus 로고
    • Project-oriented business process performance optimization
    • Man Cybern. Washington, DC, Oct.
    • Y. Zhou and Y. Chen, "Project-oriented business process performance optimization," in Proc. IEEE Int. Conf. Syst., Man Cybern., Washington, DC, Oct. 2003, vol.5, pp. 4079-4084.
    • (2003) Proc. IEEE Int. Conf. Syst. , vol.5 , pp. 4079-4084
    • Zhou, Y.1    Chen, Y.2
  • 29
    • 0036270860 scopus 로고    scopus 로고
    • Challenging the paradigm of the process enterprise: A case-study analysis of BPR implementation
    • Jun.
    • R. Silvestro and C. Westley, "Challenging the paradigm of the process enterprise: A case-study analysis of BPR implementation," Omega-Int. J. Manage. Sci., vol. 30, no. 3, pp. 215-225, Jun. 2002.
    • (2002) Omega-Int. J. Manage. Sci. , vol.30 , Issue.3 , pp. 215-225
    • Silvestro, R.1    Westley, C.2
  • 30
    • 0030153336 scopus 로고    scopus 로고
    • Developing strategic perspectives on business process reengineering: From process reconfiguration to organizational change
    • Jun.
    • J. T. C. Teng, V. Grover, and K. D. Fiedler, "Developing strategic perspectives on business process reengineering: From process reconfiguration to organizational change," Omega-Int. J. Manage. Sci., vol. 24, no. 3, pp. 271-294, Jun. 1996.
    • (1996) Omega-Int. J. Manage. Sci. , vol.24 , Issue.3 , pp. 271-294
    • Teng, J.T.C.1    Grover, V.2    Fiedler, K.D.3
  • 31
    • 0033640835 scopus 로고    scopus 로고
    • Business process reengineering of an air cargo handling process
    • Jan.
    • M. R. R. Khan, "Business process reengineering of an air cargo handling process," Int. J. Prod. Econ., vol.63, no.1, pp. 99-108, Jan. 2000.
    • (2000) Int. J. Prod. Econ. , vol.63 , Issue.1 , pp. 99-108
    • Khan, M.R.R.1
  • 32
    • 0002882741 scopus 로고    scopus 로고
    • The integration of activity based costing and enterprise modeling for reengineering purposes
    • Jun.
    • I. P. Tatsiopoulos and N. Panayiotou, "The integration of activity based costing and enterprise modeling for reengineering purposes," Int. J. Prod. Econ., vol.66, no.1, pp. 33-44, Jun. 2000.
    • (2000) Int. J. Prod. Econ. , vol.66 , Issue.1 , pp. 33-44
    • Tatsiopoulos, I.P.1    Panayiotou, N.2
  • 34
    • 0035501180 scopus 로고    scopus 로고
    • Process analysis and reengineering
    • Nov.
    • A. Zakarian and A. Kusiak, "Process analysis and reengineering," Comput. Ind. Eng., vol.41, no.2, pp. 135-150, Nov. 2001.
    • (2001) Comput. Ind. Eng. , vol.41 , Issue.2 , pp. 135-150
    • Zakarian, A.1    Kusiak, A.2
  • 35
    • 0036833004 scopus 로고    scopus 로고
    • A knowledgebased approach for business process reengineering, SHAMASH
    • Nov.
    • R. Aler, D. Borrajo, D. Camacho, and A. Sierra-Alonso, "A knowledgebased approach for business process reengineering, SHAMASH," Knowl. Based Syst., vol.15, no.8, pp. 473-483, Nov. 2002.
    • (2002) Knowl. Based Syst. , vol.15 , Issue.8 , pp. 473-483
    • Aler, R.1    Borrajo, D.2    Camacho, D.3    Sierra-Alonso, A.4
  • 36
    • 0033685766 scopus 로고    scopus 로고
    • Using multi-agent simulation and learning to design new business processes
    • May
    • F.-R. Lin and Y.-H. Pai, "Using multi-agent simulation and learning to design new business processes," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol.30, no.3, pp. 380-384, May 2000.
    • (2000) IEEE Trans. Syst., Man, Cybern. A, Syst. Humans , vol.30 , Issue.3 , pp. 380-384
    • Lin, F.-R.1    Pai, Y.-H.2
  • 37
    • 0037121486 scopus 로고    scopus 로고
    • Quality function deployment: A literature review
    • Dec.
    • L. K. Chan and M. L. Wu, "Quality function deployment: A literature review," Eur. J. Oper. Res., vol.143, no.3, pp. 463-497, Dec. 2002.
    • (2002) Eur. J. Oper. Res. , vol.143 , Issue.3 , pp. 463-497
    • Chan, L.K.1    Wu, M.L.2
  • 38
    • 10144234793 scopus 로고    scopus 로고
    • A systematic approach to quality function deployment with a full illustrative example
    • Apr.
    • L. K. Chan and M. L. Wu, "A systematic approach to quality function deployment with a full illustrative example," Omega-Int. J. Manage. Sci., vol.33, no.2, pp. 119-139, Apr. 2005.
    • (2005) Omega-Int. J. Manage. Sci. , vol.33 , Issue.2 , pp. 119-139
    • Chan, L.K.1    Wu, M.L.2
  • 39
    • 24144491350 scopus 로고    scopus 로고
    • An analytic model for locating facilities strategically
    • Jan.
    • F. Y. Partovi, "An analytic model for locating facilities strategically," Omega-Int. J. Manage. Sci., vol.34, no.1, pp. 41-55, Jan. 2006.
    • (2006) Omega-Int. J. Manage. Sci. , vol.34 , Issue.1 , pp. 41-55
    • Partovi, F.Y.1
  • 40
    • 0037117185 scopus 로고    scopus 로고
    • Quality function deployment for the good of soccer
    • Mar.
    • F. Y. Partovi and R. A. Corredoira, "Quality function deployment for the good of soccer," Eur. J. Oper. Res., vol.137, no.3, pp. 642-656, Mar. 2002.
    • (2002) Eur. J. Oper. Res. , vol.137 , Issue.3 , pp. 642-656
    • Partovi, F.Y.1    Corredoira, R.A.2
  • 41
    • 0037209876 scopus 로고    scopus 로고
    • Product planning in quality function deployment using a combined analytic network process and goal programming
    • Jan.
    • E. E. Karsak, S. Sozer, and S. E. Alptekin, "Product planning in quality function deployment using a combined analytic network process and goal programming," Comput. Ind. Eng., vol.44, no.1, pp. 171-190, Jan. 2002.
    • (2002) Comput. Ind. Eng. , vol.44 , Issue.1 , pp. 171-190
    • Karsak, E.E.1    Sozer, S.2    Alptekin, S.E.3
  • 42
    • 0032657060 scopus 로고    scopus 로고
    • House of quality: A fuzzy logicbased requirements analysis
    • Sep.
    • C. Temponi, J. Yen, and W. A. Tiao, "House of quality: A fuzzy logicbased requirements analysis," Eur. J. Oper. Res., vol.117, no.2, pp. 340- 354, Sep. 1999.
    • (1999) Eur. J. Oper. Res. , vol.117 , Issue.2 , pp. 340-354
    • Temponi, C.1    Yen, J.2    Tiao, W.A.3
  • 43
    • 0343168084 scopus 로고    scopus 로고
    • Fuzzy multicriteria models for quality function deployment
    • Mar.
    • K. J. Kim, H. Moskowitz, A. Dhingra, and G. Evans, "Fuzzy multicriteria models for quality function deployment," Eur. J. Oper. Res., vol.121, no.3, pp. 504-518, Mar. 2000.
    • (2000) Eur. J. Oper. Res. , vol.121 , Issue.3 , pp. 504-518
    • Kim, K.J.1    Moskowitz, H.2    Dhingra, A.3    Evan, G.4
  • 44
    • 0032182843 scopus 로고    scopus 로고
    • Fuzzy logic and optimization models for implementing QFD
    • Oct.
    • M. Zhou, "Fuzzy logic and optimization models for implementing QFD," Comput. Ind. Eng., vol. 35, no. 1/2, pp. 237-240, Oct. 1998.
    • (1998) Comput. Ind. Eng. , vol.35 , Issue.1-2 , pp. 237-240
    • Zhou, M.1
  • 45
    • 0142116136 scopus 로고    scopus 로고
    • A fuzzy model for exploiting quality function deployment
    • Sep.
    • L. H. Chen and M. C. Weng, "A fuzzy model for exploiting quality function deployment," Math. Comput. Model., vol.38, no.5, pp. 559- 570, Sep. 2003.
    • (2003) Math. Comput. Model. , vol.38 , Issue.5 , pp. 559-570
    • Chen, L.H.1    Weng, M.C.2
  • 46
    • 0032307578 scopus 로고    scopus 로고
    • Cost engineering with quality function deployment
    • Dec.
    • J. Bode and Y. K. R. Fung, "Cost engineering with quality function deployment," Comput. Ind. Eng., vol. 35, no. 3/4, pp. 587-590, Dec. 1998.
    • (1998) Comput. Ind. Eng. , vol.35 , Issue.3-4 , pp. 587-590
    • Bode, J.1    Fung, Y.K.R.2
  • 47
    • 0036722285 scopus 로고    scopus 로고
    • A new approach to quality function deployment planning with financial consideration
    • Sep.
    • J. Tang, R. Y. K. Fung, B. Xu, and D. Wang, "A new approach to quality function deployment planning with financial consideration," Comput. Oper. Res., vol.29, no.11, pp. 1447-1463, Sep. 2002.
    • (2002) Comput. Oper. Res. , vol.29 , Issue.11 , pp. 1447-1463
    • Tang, J.1    Fung, R.Y.K.2    Xu, B.3    Wang, D.4
  • 48
    • 0032179378 scopus 로고    scopus 로고
    • Determination of an optimal set of design requirements using house of quality
    • Oct.
    • T. Park and K. J. Kim, "Determination of an optimal set of design requirements using house of quality," J. Oper. Manag., vol.16, no.5, pp. 569- 581, Oct. 1998.
    • (1998) J. Oper. Manag. , vol.16 , Issue.5 , pp. 569-581
    • Park, T.1    Kim, K.J.2
  • 51
    • 17144458005 scopus 로고    scopus 로고
    • Toward improved benchmarking indicators
    • May
    • P. Tolosi and G. Lajtha, "Toward improved benchmarking indicators," Telecommun. Policy, vol.24, no.4, pp. 347-357, May 2000.
    • (2000) Telecommun. Policy , vol.24 , Issue.4 , pp. 347-357
    • Tolosi, P.1    Lajtha, G.2
  • 52
    • 0036465736 scopus 로고    scopus 로고
    • An integrated benchmarking approach to distribution center performance using DEA modeling
    • Feb.
    • A. Ross and C. Droge, "An integrated benchmarking approach to distribution center performance using DEA modeling," J. Oper. Manag., vol.20, no.1, pp. 19-32, Feb. 2002.
    • (2002) J. Oper. Manag. , vol.20 , Issue.1 , pp. 19-32
    • Ross, A.1    Droge, C.2
  • 53
    • 0035979626 scopus 로고    scopus 로고
    • Using data envelopment analysis to benchmark activities
    • Aug.
    • C. Homburg, "Using data envelopment analysis to benchmark activities," Int. J. Prod. Econ., vol.73, no.1, pp. 51-58, Aug. 2001.
    • (2001) Int. J. Prod. Econ. , vol.73 , Issue.1 , pp. 51-58
    • Homburg, C.1
  • 54
    • 0018032112 scopus 로고
    • Measuring the efficiency of decision-making units
    • Nov.
    • A. Charnes, W. W. Cooper, and E. Rhodes, "Measuring the efficiency of decision-making units," Eur. J. Oper. Res., vol.2, no.6, pp. 429-444, Nov. 1978.
    • (1978) Eur. J. Oper. Res. , vol.2 , Issue.6 , pp. 429-444
    • Charnes, A.1    Cooper, W.W.2    Rhodes, E.3
  • 55
    • 0021497874 scopus 로고
    • Some models for estimating technical and scale inefficiencies in data envelopment analysis
    • Sep.
    • R. D. Banker, A. Charnes, and W. W. Cooper, "Some models for estimating technical and scale inefficiencies in data envelopment analysis," Manage. Sci., vol.30, no.9, pp. 1078-1092, Sep. 1984.
    • (1984) Manage. Sci. , vol.30 , Issue.9 , pp. 1078-1092
    • Banker, R.D.1    Charnes, A.2    Cooper, W.W.3
  • 56
    • 0008092477 scopus 로고    scopus 로고
    • DEA/AR efficiency and profitability of 14 major oil companies in U.S. exploration and production
    • Apr.
    • R. G. Thompson, P. S. Dharmapala, L. J. Rothenberg, and R. M. Thrall, "DEA/AR efficiency and profitability of 14 major oil companies in U.S. exploration and production," Comput. Oper. Res., vol.23, no.4, pp. 357- 373, Apr. 1996.
    • (1996) Comput. Oper. Res. , vol.23 , Issue.4 , pp. 357-373
    • Thompson, R.G.1    Dharmapala, P.S.2    Rothenberg, L.J.3    Thrall, R.M.4
  • 57
    • 0034970362 scopus 로고    scopus 로고
    • Slack-adjusted DEA for time series analysis: Performance measurement of Japanese electric power generation industry in 1984-1993
    • Jan.
    • T. Sueyoshi and M. Goto, "Slack-adjusted DEA for time series analysis: Performance measurement of Japanese electric power generation industry in 1984-1993," Eur. J. Oper. Res., vol.133, no.2, pp. 232-259, Jan. 2001.
    • (2001) Eur. J. Oper. Res. , vol.133 , Issue.2 , pp. 232-259
    • Sueyoshi, T.1    Goto, M.2
  • 58
    • 0021458361 scopus 로고
    • Estimating most productive scale size using data envelopment analysis
    • Jul.
    • R. D. Banker, "Estimating most productive scale size using data envelopment analysis," Eur. J. Oper. Res., vol.17, no.1, pp. 35-44, Jul. 1984.
    • (1984) Eur. J. Oper. Res. , vol.17 , Issue.1 , pp. 35-44
    • Banker, R.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.