|
Volumn 38, Issue 4, 2000, Pages 479-491
|
Re-engineering of the design process for concurrent engineering
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
CONCURRENT ENGINEERING;
PROCESS ENGINEERING;
PRODUCT DESIGN;
PRODUCT DEVELOPMENT;
PRODUCTION CONTROL;
REENGINEERING;
SCHEDULING;
DESIGN STRUCTURE MATRIX;
COMPUTER INTEGRATED MANUFACTURING;
|
EID: 0034501549
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/S0360-8352(00)00059-0 Document Type: Article |
Times cited : (110)
|
References (14)
|