-
3
-
-
0001774018
-
What flexible workers can do
-
Alster, N. (1989). "What flexible workers can do." Fortune, 199(4) 62-66.
-
(1989)
Fortune
, vol.199
, Issue.4
, pp. 62-66
-
-
Alster, N.1
-
4
-
-
84985853243
-
Implicit optimal and heuristic labor staffing in a multiobjective, multilocation environment
-
Bechtold, S. E. (1988). "Implicit optimal and heuristic labor staffing in a multiobjective, multilocation environment." Decision Sci., 19(2).
-
(1988)
Decision Sci.
, vol.19
, Issue.2
-
-
Bechtold, S.E.1
-
6
-
-
0003730982
-
-
Scientific, South San Francisco
-
Brooke, A., Kendrick, D., and Meeraus, A. (1992). GAMS: a user's guide, release 2.25, Scientific, South San Francisco.
-
(1992)
GAMS: A User's Guide, Release 2.25
-
-
Brooke, A.1
Kendrick, D.2
Meeraus, A.3
-
7
-
-
0030354599
-
Staffing a multi-skilled workforce with varying levels of productivity: An analysis of cross-training policies
-
Decision Sciences Institute, Orlando, Fla.
-
Brusco, M., and Johns, T. (1996). "Staffing a multi-skilled workforce with varying levels of productivity: an analysis of cross-training policies." Proc., 27th Annual Meeting of the Decision Sciences Institute, Decision Sciences Institute, Orlando, Fla.
-
(1996)
Proc., 27th Annual Meeting of the Decision Sciences Institute
-
-
Brusco, M.1
Johns, T.2
-
8
-
-
0032207685
-
Multiskilled labor utilization strategies in construction
-
Burleson, R. C., Hans, C. T., Tucker, R. L., and Stanley, A. (1998). "Multiskilled labor utilization strategies in construction," J. Constr. Eng. Manage., 124(6), 480-489.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 480-489
-
-
Burleson, R.C.1
Hans, C.T.2
Tucker, R.L.3
Stanley, A.4
-
11
-
-
0032656506
-
Cross-utilization of workers whose capabilities differ
-
Campbell, G. (1999). "Cross-utilization of workers whose capabilities differ." Manage. Sci., 45(5), 722-732.
-
(1999)
Manage. Sci.
, vol.45
, Issue.5
, pp. 722-732
-
-
Campbell, G.1
-
13
-
-
0001696167
-
Multiskilling, technical change, and the Japanese firm
-
Carmichael, H. L., and MacLeod, W. B. (1993). "Multiskilling, technical change, and the Japanese firm." Econom. J., 142-160.
-
(1993)
Econom. J.
, pp. 142-160
-
-
Carmichael, H.L.1
MacLeod, W.B.2
-
14
-
-
0027079581
-
Labor productivity impact of varying crew levels
-
Cass, D. (1992). "Labor productivity impact of varying crew levels." AACE Transactions, 1, C2.1-C2.9.
-
(1992)
AACE Transactions
, vol.1
-
-
Cass, D.1
-
16
-
-
13944259041
-
Flexibility and integration at the workplace
-
Cross, M. (1989). "Flexibility and integration at the workplace." Insights in Human Resource Management, 27(4), 43-47.
-
(1989)
Insights in Human Resource Management
, vol.27
, Issue.4
, pp. 43-47
-
-
Cross, M.1
-
18
-
-
3242682784
-
Multi-skilled teams replace old work systems
-
Denton, K. D. (1992). "Multi-skilled teams replace old work systems." HR Magazine, 37(9), 48-56.
-
(1992)
HR Magazine
, vol.37
, Issue.9
, pp. 48-56
-
-
Denton, K.D.1
-
20
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
21
-
-
0029727089
-
New approach for optimization of overall construction schedule
-
Li, S. (1996). "New approach for optimization of overall construction schedule." J. Constr. Eng. Manage., 122(1), 7-13.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 7-13
-
-
Li, S.1
-
22
-
-
0003594790
-
Maintaining skilled construction workers
-
Construction Industry Institute, Minneapolis
-
Liska, R. (1998). "Maintaining skilled construction workers." Material from Construction Industry Institute 1998 Conf., Construction Industry Institute, Minneapolis.
-
(1998)
Material from Construction Industry Institute 1998 Conf.
-
-
Liska, R.1
-
23
-
-
0023365047
-
Motivational impact of work crews
-
Maloney, W. F., and McFillen, J. J. (1987). "Motivational impact of work crews." J. Constr. Eng. Manage., 113(2), 208-221.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.2
, pp. 208-221
-
-
Maloney, W.F.1
McFillen, J.J.2
-
26
-
-
0003574098
-
-
MS thesis, Univ. of Texas at Austin, Austin, Tex.
-
Stanley, A. (1997). "Benefits, impediments, and limitations to multiskilling in construction." MS thesis, Univ. of Texas at Austin, Austin, Tex.
-
(1997)
Benefits, Impediments, and Limitations to Multiskilling in Construction
-
-
Stanley, A.1
-
27
-
-
0026220131
-
Labor productivity and work sampling: The bottom line
-
Thomas, H. R. (1991). "Labor productivity and work sampling: the bottom line." J. Constr. Eng. Manage., 117(3), 423-444.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.3
, pp. 423-444
-
-
Thomas, H.R.1
-
28
-
-
0025694102
-
Modeling construction labor productivity
-
Thomas, H. R., et al. (1990). "Modeling construction labor productivity." J. Constr. Eng. Manage., 116(4), 705-726.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 705-726
-
-
Thomas, H.R.1
-
29
-
-
13944284549
-
Optimum performance through multi-skill maintenance
-
March/April
-
Williamson, R. M. (1992). "Optimum performance through multi-skill maintenance." AIPE Facilities, March/April.
-
(1992)
AIPE Facilities
-
-
Williamson, R.M.1
|