Volumn 130, Issue 3, 2004, Pages 307-314

Flexible model for time/cost tradeoff problem

Author keywords

Computer programming; Construction management; Costs; Critical path method; Models; Project management; Time factors

Indexed keywords

CONSTRUCTION MANAGEMENT; CRITICAL PATH METHOD; INTEGER PROGRAMMING MODELS; TIME FACTORS;

EID: 13944265628     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:3(307)     Document Type: Article
Times cited : (51)

References (17)
  • 1
    • 0040687741 scopus 로고
    • Dynamic programming for project cost-time curves
    • Butcher, W. S. (1967). "Dynamic programming for project cost-time curves." J. Constr. Div., Am. Soc. Civ. Eng., 93, 59-73.
    • (1967) J. Constr. Div., Am. Soc. Civ. Eng. , vol.93 , pp. 59-73
    • Butcher, W.S.1
  • 2
    • 0014928334 scopus 로고
    • Decision CPM: Network reduction and solution
    • Crowston, W. (1970). "Decision CPM: Network reduction and solution." Oper. Res. Q., 21, 435-452.
    • (1970) Oper. Res. Q. , vol.21 , pp. 435-452
    • Crowston, W.1
  • 3
    • 0001267414 scopus 로고
    • Decision CPM: A method for simultaneous planning, scheduling, and control of projects
    • Crowston, W., and Thompson, G. L. (1967). "Decision CPM: A method for simultaneous planning, scheduling, and control of projects." Oper. Res., 15, 407-426.
    • (1967) Oper. Res. , vol.15 , pp. 407-426
    • Crowston, W.1    Thompson, G.L.2
  • 4
    • 0029632618 scopus 로고
    • The discrete time-cost tradeoff problem revisited
    • De, P., Dunne, E. J., Gosh, J. B., and Wells, C. E. (1995). "The discrete time-cost tradeoff problem revisited." Eur. J. Oper. Res., 81, 225-238.
    • (1995) Eur. J. Oper. Res. , vol.81 , pp. 225-238
    • De, P.1    Dunne, E.J.2    Gosh, J.B.3    Wells, C.E.4
  • 5
    • 0031102411 scopus 로고    scopus 로고
    • Complexity of the discrete time/cost tradeoff problem for project networks
    • De, P., Dunne, E. J., Gosh, J. B., and Wells, C. E. (1997). "Complexity of the discrete time/cost tradeoff problem for project networks." Oper. Res., 45, 302-306.
    • (1997) Oper. Res. , vol.45 , pp. 302-306
    • De, P.1    Dunne, E.J.2    Gosh, J.B.3    Wells, C.E.4
  • 6
    • 13944252676 scopus 로고    scopus 로고
    • New computational results on the discrete time/cost tradeoff problem in project networks
    • Dept. of Applied Economics, Katholieke Univ. Leuven, Naamsestraat 69, Leuven, Belgium
    • Demeulemeester, E., De Reyck, B., Foubert, B., Herroelen, W., and Vanhoucke, M. (1998). "New computational results on the discrete time/cost tradeoff problem in project networks." Working Paper, Dept. of Applied Economics, Katholieke Univ. Leuven, Naamsestraat 69, Leuven, Belgium.
    • (1998) Working Paper
    • Demeulemeester, E.1    De Reyck, B.2    Foubert, B.3    Herroelen, W.4    Vanhoucke, M.5
  • 7
  • 8
    • 0000302371 scopus 로고
    • A note on "A simple CPM time-cost tradeoff algorithm"
    • Goyal, S. K. (1975). A note on "A simple CPM time-cost tradeoff algorithm." Manage. Sci., 21, 6.
    • (1975) Manage. Sci. , vol.21 , pp. 6
    • Goyal, S.K.1
  • 9
    • 0005764899 scopus 로고
    • An implicit enumeration algorithm for the time-cost tradeoff problem in project network analysis
    • Harvey, R. T., and Paterson, J. H. (1979). "An implicit enumeration algorithm for the time-cost tradeoff problem in project network analysis." Found. Control Eng., 4, 107-117.
    • (1979) Found. Control Eng. , vol.4 , pp. 107-117
    • Harvey, R.T.1    Paterson, J.H.2
  • 10
    • 0018444440 scopus 로고
    • A dynamic programming algorithm for decision CPM networks
    • Hindelang, T. J., and Muth, J. F. (1979). "A dynamic programming algorithm for Decision CPM networks." Oper. Res., 27, 225-241.
    • (1979) Oper. Res. , vol.27 , pp. 225-241
    • Hindelang, T.J.1    Muth, J.F.2
  • 11
    • 0029470313 scopus 로고
    • Construction time-cost trade-off analysis using LP/IP hybrid method
    • Liu, L., Burns, S. A., and Feng, C.-W. (1995). "Construction time-cost trade-off analysis using LP/IP hybrid method." J. Constr. Eng. Manage., 121(4), 446-454.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 446-454
    • Liu, L.1    Burns, S.A.2    Feng, C.-W.3
  • 12
  • 13
    • 0017506038 scopus 로고
    • Cost-time model for large CPM project networks
    • Panagiotakopoulos, D. (1977a). "Cost-time model for large CPM project networks." J. Constr. Div., Am. Soc. Civ. Eng., 103(2), 201-211.
    • (1977) J. Constr. Div., Am. Soc. Civ. Eng. , vol.103 , Issue.2 , pp. 201-211
    • Panagiotakopoulos, D.1
  • 14
    • 0346149435 scopus 로고
    • A CPM time-cost computational algorithm for arbitrary activity cost functions
    • Panagiotakopoulos, D. (1977b). "A CPM time-cost computational algorithm for arbitrary activity cost functions." INFOR, 15, 183-195.
    • (1977) INFOR , vol.15 , pp. 183-195
    • Panagiotakopoulos, D.1
  • 15
    • 0019067033 scopus 로고
    • Linear programming solution to network compression
    • Perera, S. (1980). "Linear programming solution to network compression." J. Constr. Div., Am. Soc. Civ. Eng., 106(3), 315-326.
    • (1980) J. Constr. Div., Am. Soc. Civ. Eng. , vol.106 , Issue.3 , pp. 315-326
    • Perera, S.1
  • 16
    • 0016566179 scopus 로고
    • A dynamic programming solution to cost-time tradeoff for CPM
    • Robinson, D. R. (1975). "A dynamic programming solution to cost-time tradeoff for CPM." Manage. Sci., 22, 158-166.
    • (1975) Manage. Sci. , vol.22 , pp. 158-166
    • Robinson, D.R.1
  • 17
    • 19244376018 scopus 로고
    • A simple CPM time-cost tradeoff algorithm
    • Siemens, N. (1971). "A simple CPM time-cost tradeoff algorithm." Manage. Sci., 17(6), B354-B363.
    • (1971) Manage. Sci. , vol.17 , Issue.6
    • Siemens, N.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.