메뉴 건너뛰기




Volumn 24, Issue 4, 2009, Pages 308-317

The criteria describing the need for highway reconstruction based on the theory of traffic flows and repay time

Author keywords

Capital investments; Cost; Highway; Reconstruction; Repay time; Speed; Traffic flow; Traffic intensity; Transport; Transport expenses; Vehicle

Indexed keywords

COSTS; IMAGE RECONSTRUCTION; INVESTMENTS; POLLUTION CONTROL; SPEED; TRANSPORTATION; VEHICLES;

EID: 73949114579     PISSN: 16484142     EISSN: 16483480     Source Type: Journal    
DOI: 10.3846/1648-4142.2009.24.308-317     Document Type: Article
Times cited : (26)

References (64)
  • 1
    • 41549149122 scopus 로고    scopus 로고
    • A new delay parameter dependent on variable analysis periods at signalized intersections. Part 1: Model development
    • doi:10.3846/1648-4142.2008.23.31-36
    • Akgüngör, A. P. 2008a. A new delay parameter dependent on variable analysis periods at signalized intersections. Part 1: Model development, Transport 23(1): 31-36. doi:10.3846/1648-4142.2008.23.31-36
    • (2008) Transport , vol.23 , Issue.1 , pp. 31-36
    • Akgüngör, A.P.1
  • 2
    • 46349097802 scopus 로고    scopus 로고
    • A new delay parameter dependent on variable analysis periods at signalized intersections. Part 2: Validation and application
    • doi:10.3846/1648-4142.2008.23.91-94
    • Akgüngör, A. P. 2008b. A new delay parameter dependent on variable analysis periods at signalized intersections. Part 2: Validation and application, Transport 23(2): 91-94. doi:10.3846/1648-4142.2008.23.91-94
    • (2008) Transport , vol.23 , Issue.2 , pp. 91-94
    • Akgüngör, A.P.1
  • 3
    • 0026268170 scopus 로고
    • Alternative financing techniques in funding major highway reconstruction projects
    • Allen, M. T.; Floyd, C. F. 1991. Alternative Financing Techniques in Funding Major Highway Reconstruction Projects, Transportation Quarterly 45(3): 357-368.
    • (1991) Transportation Quarterly , vol.45 , Issue.3 , pp. 357-368
    • Allen, M.T.1    Floyd, C.F.2
  • 5
    • 36048962049 scopus 로고    scopus 로고
    • Valuing attributes of enhanced traffic information: An experience in Kolkata
    • Basu, D.; Maitra, B. 2007. Valuing attributes of enhanced traffic information: an experience in Kolkata, Transport 22(3): 164-173.
    • (2007) Transport , vol.22 , Issue.3 , pp. 164-173
    • Basu, D.1    Maitra, B.2
  • 6
    • 41549135176 scopus 로고    scopus 로고
    • Interdependence of noise and traffic flow
    • doi:10.3846/1648-4142.2008.23.67-72
    • Bazaras, J.; Jablonskytė, J.; Jotautienė, E. 2008. Interdependence of noise and traffic flow, Transport 23(1): 67-72. doi:10.3846/1648-4142.2008.23.67-72
    • (2008) Transport , vol.23 , Issue.1 , pp. 67-72
    • Bazaras, J.1    Jablonskyte, J.2    Jotautiene, E.3
  • 7
    • 37849039868 scopus 로고    scopus 로고
    • The "green wave" mode production on the two-lane highways during the construction works time period
    • Berezhnoy, A.; Grakovsky, A.; Nesterov, A. 2007. The "green wave" mode production on the two-lane highways during the construction works time period, Transport 22(4): 263-268.
    • (2007) Transport , vol.22 , Issue.4 , pp. 263-268
    • Berezhnoy, A.1    Grakovsky, A.2    Nesterov, A.3
  • 8
    • 33845534156 scopus 로고    scopus 로고
    • The MOORA method and its application to privatization in a transition economy
    • Brauers, W. K.; Zavadskas, E. K. 2006. The MOORA method and its application to privatization in a transition economy, Control and Cybernetics 35(2): 445-469.
    • (2006) Control and Cybernetics , vol.35 , Issue.2 , pp. 445-469
    • Brauers, W.K.1    Zavadskas, E.K.2
  • 9
    • 70949104994 scopus 로고    scopus 로고
    • Robustness of the multiobjective MOORA method with a test for the facilities sector
    • doi:10.3846/1392-8619.2009.15.352-375
    • Brauers, W. K.; Zavadskas, E. K. 2009. Robustness of the multiobjective MOORA method with a test for the facilities sector, Technological and Economic Development of Economy 15(2): 352-375. doi:10.3846/1392-8619.2009.15.352-375
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.2 , pp. 352-375
    • Brauers, W.K.1    Zavadskas, E.K.2
  • 10
    • 53349156737 scopus 로고    scopus 로고
    • Multi-objective decision-making for road design
    • doi:10.3846/1648-4142.2008.23.183-193
    • Brauers, W. K. M.; Zavadskas, E. K.; Peldschus, F.; Turskis, Z. 2008a. Multi-objective decision-making for road design, Transport 23(3): 183-193. doi:10.3846/1648-4142.2008.23.183-193
    • (2008) Transport , vol.23 , Issue.3 , pp. 183-193
    • Brauers, W.K.M.1    Zavadskas, E.K.2    Peldschus, F.3    Turskis, Z.4
  • 11
    • 70350634865 scopus 로고    scopus 로고
    • Multi-objective contractor's ranking by applying the MOORA method
    • doi:10.3846/1611-1699.2008.9.245-255
    • Brauers, W. K. M.; Zavadskas, E. K.; Turskis, Z.; Vilutienė, T. 2008b. Multi-objective contractor's ranking by applying the MOORA method, Journal of Business Economics and Management 9(4): 245-255. doi:10.3846/1611- 1699.2008.9.245-255
    • (2008) Journal of Business Economics and Management , vol.9 , Issue.4 , pp. 245-255
    • Brauers, W.K.M.1    Zavadskas, E.K.2    Turskis, Z.3    Vilutiene, T.4
  • 12
    • 70349494484 scopus 로고    scopus 로고
    • New methodology for sustainable development towards sustainable transportation system
    • doi:10.3846/1392-8619.2009.15.5-9
    • Burinskienė, M. 2009. New methodology for sustainable development towards sustainable transportation system, Technological and Economic Development of Economy 15(1): 5-9. doi:10.3846/1392-8619.2009.15.5-9
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.1 , pp. 5-9
    • Burinskiene, M.1
  • 14
    • 63649155116 scopus 로고    scopus 로고
    • Future insights, scenarios and expert method application in sustainable territorial planning
    • doi:10.3846/1392-8619.2009.15.10-25
    • Burinskienė, M.; Rudzkienė, V. 2009. Future insights, scenarios and expert method application in sustainable territorial planning, Technological and Economic Development of Economy 15(1): 10-25. doi:10.3846/1392-8619.2009.15.10-25
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.1 , pp. 10-25
    • Burinskiene, M.1    Rudzkiene, V.2
  • 16
    • 36148988823 scopus 로고    scopus 로고
    • Establishing highway horizontal alignment to maximize design consistency
    • DOI 10.1139/L07-043
    • Easa, S. M.; Mehmood, A. 2007. Establishing highway horizontal alignment to maximize design consistency, Canadian Journal of Civil Engineering 34(9): 1159-1168. doi:10.1139/L07-043 (Pubitemid 350111501)
    • (2007) Canadian Journal of Civil Engineering , vol.34 , Issue.9 , pp. 1159-1168
    • Easa, S.M.1    Mehmood, A.2
  • 17
    • 0036717579 scopus 로고    scopus 로고
    • Optimal vertical alignment analysis for highway design
    • DOI 10.1061/(ASCE)0733-947X(2002)128:5(395)
    • Fwa, T. F.; Chan, W. T.; Sim, Y. P. 2002. Optimal vertical alignment analysis for highway design, Journal of Transportation Engineering 128(5): 395-402. doi:10.1061/(ASCE)0733-947X(2002)128:5(395) (Pubitemid 35016365)
    • (2002) Journal of Transportation Engineering , vol.128 , Issue.5 , pp. 395-402
    • Fwa, T.F.1    Chan, W.T.2    Sim, Y.P.3
  • 20
    • 41549143905 scopus 로고    scopus 로고
    • Predicting capacities of runways serving new large aircraft
    • doi:10.3846/1648-4142.2008.23.44-50
    • Gopalakrishnan, K. 2008. Predicting capacities of runways serving new large aircraft, Transport 23(1): 44-50. doi:10.3846/1648-4142.2008.23.44-50
    • (2008) Transport , vol.23 , Issue.1 , pp. 44-50
    • Gopalakrishnan, K.1
  • 22
    • 0027678704 scopus 로고
    • Monitoring and evaluating highway reconstruction strategies
    • Higgins, T. J. 1993. Monitoring and Evaluating Highway Reconstruction Strategies, Transportation Quarterly 47(4): 525-544.
    • (1993) Transportation Quarterly , vol.47 , Issue.4 , pp. 525-544
    • Higgins, T.J.1
  • 23
    • 34547623916 scopus 로고    scopus 로고
    • Condition-triggered maintenance for mine haul roads with reconstructed-vehicle response to haul road defects
    • Hugo, D.; Heyns, S. P.; Thompson, R. J.; Visser, A. T. 2007. Condition-triggered maintenance for mine haul roads with reconstructed-vehicle response to haul road defects, Transportation Research Record 1989(2): 254-260.
    • (2007) Transportation Research Record , vol.1989 , Issue.2 , pp. 254-260
    • Hugo, D.1    Heyns, S.P.2    Thompson, R.J.3    Visser, A.T.4
  • 24
    • 36048938345 scopus 로고    scopus 로고
    • Automobile transport system analysis and ranking in Lithuanian administrative regions
    • Jakimavičius, M.; Burinskienė, M. 2007. Automobile transport system analysis and ranking in Lithuanian administrative regions, Transport 22(3): 214-220.
    • (2007) Transport , vol.22 , Issue.3 , pp. 214-220
    • Jakimavičius, M.1    Burinskiene, M.2
  • 25
    • 70349489259 scopus 로고    scopus 로고
    • A GIS and multi-criteria- based analysis and ranking of transportation zones of Vilnius city
    • doi:10.3846/1392-8619.2009.15.39-48
    • Jakimavičius, M.; Burinskienė, M. 2009. A GIS and multi-criteria- based analysis and ranking of transportation zones of Vilnius city, Technological and Economic Development of Economy 15(1): 39-48. doi:10.3846/1392-8619.2009.15.39-48
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.1 , pp. 39-48
    • Jakimavičius, M.1    Burinskiene, M.2
  • 26
    • 36049045664 scopus 로고    scopus 로고
    • Determination of traffic flow parameters in different traffic flow interaction cases
    • Junevičius, R.; Bogdevičius, M. 2007. Determination of traffic flow parameters in different traffic flow interaction cases, Transport 22(3): 236-239.
    • (2007) Transport , vol.22 , Issue.3 , pp. 236-239
    • Junevičius, R.1    Bogdevičius, M.2
  • 28
    • 64049106411 scopus 로고    scopus 로고
    • Implementation of experimental research in road traffic: Theory and practice
    • doi:10.3846/1822-427X.2008.3.101-108
    • Kapski, D.; Leonovich, I., Ratkevičiūtė, K.; Miškinis, D. 2008. Implementation of experimental research in road traffic: theory and practice, The Baltic Journal of Road and Bridge Engineering 3(2): 101-108. doi:10.3846/1822-427X.2008.3.101-108
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.2 , pp. 101-108
    • Kapski, D.1    Leonovich, I.2    Ratkevičiute, K.3    Miškinis, D.4
  • 29
    • 41549119503 scopus 로고    scopus 로고
    • Traffic control elements influence on accidents, mobility and the environment
    • doi:10.3846/1648-4142.2008.23.55-58
    • Kinderytė-Poškienė, J.; Sokolovskij, E. 2008. Traffic control elements influence on accidents, mobility and the environment, Transport 23(1): 55-58. doi:10.3846/1648-4142.2008.23.55-58
    • (2008) Transport , vol.23 , Issue.1 , pp. 55-58
    • Kinderyte-Poškiene, J.1    Sokolovskij, E.2
  • 30
    • 33644911181 scopus 로고    scopus 로고
    • Safety and accessibility effects of code modifications and traffic calming of an arterial road
    • doi:10.1016/j.aap.2005.11.002
    • Leden, L.; Wikstrom, P. E.; Garder, P.; Rosander, P. 2006. Safety and accessibility effects of code modifications and traffic calming of an arterial road, Accident Analysis and Prevention 38(3): 455-461. doi:10.1016/j.aap.2005. 11.002
    • (2006) Accident Analysis and Prevention , vol.38 , Issue.3 , pp. 455-461
    • Leden, L.1    Wikstrom, P.E.2    Garder, P.3    Rosander, P.4
  • 31
    • 33846291058 scopus 로고    scopus 로고
    • State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience
    • DOI 10.1061/(ASCE)0733-9364(2007)133:2(105)
    • Lee, E.-B; Thomas, D. K. 2007. State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience, Journal of Construction Engineering and Management 133(2): 105-113. doi:10.1061/(ASCE) 0733-9364(2007)133:2(105) (Pubitemid 46121719)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.2 , pp. 105-113
    • Lee, E.-B.1    Thomas, D.K.2
  • 32
    • 33646188948 scopus 로고    scopus 로고
    • Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study
    • doi:10.1061/(ASCE)0733-9364(2006)132:5(465)
    • Lee, E.-B.; Lee, H.; Harvey, J. T. 2006. Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study, Journal of Construction Engineering and Management 132(5):465-472. doi:10.1061/(ASCE) 0733-9364(2006)132:5(465)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.5 , pp. 465-472
    • Lee, E.-B.1    Lee, H.2    Harvey, J.T.3
  • 33
    • 26444443557 scopus 로고    scopus 로고
    • Planning urban highway reconstruction with traffic demand affected by construction schedule
    • DOI 10.1061/(ASCE)0733-947X(2005)131:10(752)
    • Lee, E.-B.; Thomas, D.; Bloomberg, L. 2005. Planning urban highway reconstruction with traffic demand affected by construction schedule, Journal of Transportation Engineering 131(10): 752-761. doi:10.1061/(ASCE)0733-947X(2005) 131:10(752) (Pubitemid 41419811)
    • (2005) Journal of Transportation Engineering , vol.131 , Issue.10 , pp. 752-761
    • Lee, E.-B.1    Thomas, D.2    Bloomberg, L.3
  • 34
    • 84966363547 scopus 로고    scopus 로고
    • Pavement preventive maintenance for highway based on cost-benefit analysis
    • Li, Z. 2007. Pavement preventive maintenance for highway based on cost-benefit analysis, Journal of Highway and Transportation Research and Development 24(12): 19-23.
    • (2007) Journal of Highway and Transportation Research and Development , vol.24 , Issue.12 , pp. 19-23
    • Li, Z.1
  • 35
    • 70349229860 scopus 로고    scopus 로고
    • Condition assessment of road equipment - State-of-the-art
    • doi:10.3846/1822-427X.2008.3.84-92
    • Lundkvist, S.-O.; Isacsson, U. 2008. Condition assessment of road equipment - state-of-the-art, The Baltic Journal of Road and Bridge Engineering 3(2): 84-92. doi:10.3846/1822-427X.2008.3.84-92
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.2 , pp. 84-92
    • Lundkvist, S.-O.1    Isacsson, U.2
  • 38
    • 58049100183 scopus 로고    scopus 로고
    • Flexibility approach in the runway pavement using FLEMANCO method
    • doi:10.3846/1648-4142.2008.23.341-350
    • Paslawski, J. 2008a. Flexibility approach in the runway pavement using FLEMANCO method, Transport 23(4): 341- 350. doi:10.3846/1648-4142.2008.23.341- 350
    • (2008) Transport , vol.23 , Issue.4 , pp. 341-350
    • Paslawski, J.1
  • 39
    • 57849101665 scopus 로고    scopus 로고
    • Flexibility approach in construction process engineering
    • doi:10.3846/1392- 8619.2008.14.518-530
    • Paslawski, J. 2008b. Flexibility approach in construction process engineering, Technological and Economic Development of Economy 14(4): 518-530. doi:10.3846/1392- 8619.2008.14.518-530
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.4 , pp. 518-530
    • Paslawski, J.1
  • 40
    • 70349558214 scopus 로고    scopus 로고
    • Flexibility in highway noise management
    • doi:10.3846/1648-4142.2009.24.66-75
    • Paslawski, J. 2009. Flexibility in highway noise management, Transport 24(1): 66-75. doi:10.3846/1648-4142.2009.24.66-75
    • (2009) Transport , vol.24 , Issue.1 , pp. 66-75
    • Paslawski, J.1
  • 41
    • 66049092508 scopus 로고    scopus 로고
    • Investigation into a long-term interlayer bonding of asphalt pavements
    • doi:10.3846/1822-427X.2008.3.65-70
    • Raab, C.; Partl, M. N. 2008. Investigation into a long-term interlayer bonding of asphalt pavements, The Baltic Journal of Road and Bridge Engineering 3(2): 65-70. doi:10.3846/1822-427X.2008.3.65-70
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.2 , pp. 65-70
    • Raab, C.1    Partl, M.N.2
  • 42
    • 67949115839 scopus 로고    scopus 로고
    • Manufacturing technologies and dynamics of hot-mix asphalt mixture production
    • doi:10.3846/1392-3730.2009.15.169-179
    • Sivilevičius, H.; Šukevičius, Š. 2009. Manufacturing technologies and dynamics of hot-mix asphalt mixture production, Journal of Civil Engineering and Management 15(2): 169- 179. doi:10.3846/1392-3730.2009.15.169-179
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.2 , pp. 169-179
    • Sivilevičius, H.1    Šukevičius, Š.2
  • 43
    • 54049127691 scopus 로고    scopus 로고
    • Dynamics of vehicle loads on the asphalt pavement of European roads which cross Lithuania
    • Sivilevičius, H.; Šukevičius, Š. 2007. Dynamics of vehicle loads on the asphalt pavement of European roads which cross Lithuania, The Baltic Journal of Road and Bridge Engineering 2(4): 147-154.
    • (2007) The Baltic Journal of Road and Bridge Engineering , vol.2 , Issue.4 , pp. 147-154
    • Sivilevičius, H.1    Šukevičius, Š.2
  • 44
    • 44249086141 scopus 로고    scopus 로고
    • Stochastic simulation of the influence of variation of mineral material grading and dose weight on the homogeneity of hot-mix asphalt
    • DOI 10.1016/j.conbuildmat.2007.07.001, PII S0950061807001791
    • Sivilevičius, H.; Vislavičius, K. 2008. Stochastic simulation of the influence of variation of mineral material grading and dose weight on the homogeneity of hot-mix asphalt, Construction and Building Materials 22(9): 2007-2014. doi:10.1016/j.conbuildmat.2007.07.001 (Pubitemid 351726430)
    • (2008) Construction and Building Materials , vol.22 , Issue.9 , pp. 2007-2014
    • Sivilevicius, H.1    Vislavicius, K.2
  • 45
    • 54049133740 scopus 로고    scopus 로고
    • Quality attributes and complex assessment methodology of the asphalt mixing plant
    • doi:10.3846/1822-427X.2008.3.161-166
    • Sivilevičius, H.; Zavadskas, E. K.; Turskis, Z. 2008. Quality attributes and complex assessment methodology of the asphalt mixing plant, The Baltic Journal of Road and Bridge Engineering 3(3): 161-166. doi:10.3846/1822-427X.2008.3.161-166
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.3 , pp. 161-166
    • Sivilevičius, H.1    Zavadskas, E.K.2    Turskis, Z.3
  • 46
    • 34250615127 scopus 로고    scopus 로고
    • Technique for definition of break size of road covering on the bridge
    • Sužiedelytė-Visockienė, J. 2007. Technique for definition of break size of road covering on the bridge, Transport 22(2): 122-125.
    • (2007) Transport , vol.22 , Issue.2 , pp. 122-125
    • Sužiedelyte-Visockiene, J.1
  • 47
    • 58049097829 scopus 로고    scopus 로고
    • Multiple-criteria decision support system in highway infrastructure management
    • doi:10.3846/1648-4142.2008.23.299-305
    • Šelih, J.; Kne, A.; Srdić, A.; Žura, M. 2008. Multiple-criteria decision support system in highway infrastructure management, Transport 23(4): 299-305. doi:10.3846/1648-4142.2008.23.299-305
    • (2008) Transport , vol.23 , Issue.4 , pp. 299-305
    • Šelih, J.1    Kne, A.2    Srdić, A.3    Žura, M.4
  • 48
    • 70349559489 scopus 로고    scopus 로고
    • The impact of road parameters and the surrounding area on traffic accidents
    • doi:10.3846/1648-4142.2009.24.42-47
    • Šliupas, T. 2009. The impact of road parameters and the surrounding area on traffic accidents, Transport 24(1): 42-47. doi:10.3846/1648-4142.2009.24.42-47
    • (2009) Transport , vol.24 , Issue.1 , pp. 42-47
    • Šliupas, T.1
  • 49
    • 71149116192 scopus 로고    scopus 로고
    • Calculation of welfare effects of road pricing on a large scale road network
    • doi:10.3846/1392-8619.2009.15.102-121
    • Tampère, C.; Stada, J.; Immers, B. 2009. Calculation of welfare effects of road pricing on a large scale road network, Technological and Economic Development of Economy 15(1): 102-121. doi:10.3846/1392-8619.2009.15. 102-121
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.1 , pp. 102-121
    • Tampère, C.1    Stada, J.2    Immers, B.3
  • 50
    • 36049009029 scopus 로고    scopus 로고
    • Linear optimization model of urban areas' operating efficiency
    • Tanczos, K.; Torok, A. 2007. Linear optimization model of urban areas' operating efficiency, Transport 22(3): 225-228.
    • (2007) Transport , vol.22 , Issue.3 , pp. 225-228
    • Tanczos, K.1    Torok, A.2
  • 53
    • 33947729873 scopus 로고    scopus 로고
    • 3D reconstruction of road surfaces using an integrated multi-sensory approach
    • DOI 10.1016/j.optlaseng.2006.12.007, PII S0143816606002077
    • Yu, S.-J.; Sukumar, S. R.; Koschan, A. F.; Page, D. L.; Abidi, M. A. 2007. 3D reconstruction of road surfaces using an integrated multi-sensory approach, Optics and Lasers in Engineering 45(7): 808-818. doi:10.1016/j. optlaseng.2006.12.007 (Pubitemid 46505032)
    • (2007) Optics and Lasers in Engineering , vol.45 , Issue.7 , pp. 808-818
    • Yu, S.J.1    Sukumar, S.R.2    Koschan, A.F.3    Page, D.L.4    Abidi, M.A.5
  • 54
    • 70449473459 scopus 로고    scopus 로고
    • Methods and models of research in construction project engineering
    • doi:10.3846/1611-1699.2008.9.240-243
    • Zavadskas, E. K. 2008. Methods and models of research in construction project engineering, Journal of Business Economics and Management 9(3): 240-243. doi:10.3846/1611-1699.2008.9.240-243
    • (2008) Journal of Business Economics and Management , vol.9 , Issue.3 , pp. 240-243
    • Zavadskas, E.K.1
  • 56
    • 54149111585 scopus 로고    scopus 로고
    • Multi-attribute decision- making methods for assessment of quality in bridges and road construction: State-of-the-art surveys
    • doi:10.3846/1822-427X.2008.3.152-160
    • Zavadskas, E. K.; Liias, R.; Turskis, Z. 2008. Multi-attribute decision- making methods for assessment of quality in bridges and road construction: state-of-the-art surveys, The Baltic Journal of Road and Bridge Engineering 3(3): 152-160. doi:10.3846/1822-427X.2008.3.152-160
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.3 , pp. 152-160
    • Zavadskas, E.K.1    Liias, R.2    Turskis, Z.3
  • 57
    • 33847343859 scopus 로고    scopus 로고
    • Interface condition influence on prediction for flexible pavement live
    • Ziari, H.; Khabiri, M. M. 2007. Interface condition influence on prediction for flexible pavement live, Journal of Civil Engineering and Management 13(1): 71-76.
    • (2007) Journal of Civil Engineering and Management , vol.13 , Issue.1 , pp. 71-76
    • Ziari, H.1    Khabiri, M.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.