-
1
-
-
0141505244
-
-
McGraw-Hill Book Company, Sydney
-
Bartol, K.; Martin, D.; Tein, M.; Matthews, G. 1996. Management a pacific rim focus. McGraw-Hill Book Company, Sydney.
-
(1996)
Management a pacific rim focus
-
-
Bartol, K.1
Martin, D.2
Tein, M.3
Matthews, G.4
-
3
-
-
0000259654
-
General system theory: The skeleton of science
-
Boulding, K. 1956. General system theory: The skeleton of science, Management Science 2: 197-208.
-
(1956)
Management Science
, vol.2
, pp. 197-208
-
-
Boulding, K.1
-
7
-
-
0002759166
-
Planning for strategic flexibility
-
Eppink, D. J. 1978. Planning for strategic flexibility, Long Range Planning 11: 9-15.
-
(1978)
Long Range Planning
, vol.11
, pp. 9-15
-
-
Eppink, D.J.1
-
8
-
-
84980248442
-
Strategic flexibility for high technology manoeuvres: A conceptual framework
-
Evans, J. S. 1991. Strategic flexibility for high technology manoeuvres: a conceptual framework, Journal of Management Studies 28: 69-89.
-
(1991)
Journal of Management Studies
, vol.28
, pp. 69-89
-
-
Evans, J.S.1
-
11
-
-
15944418637
-
Embodying product and process flexibility to cope with chalenging projest deliveries
-
Gil, N.; Tommelein, I. D.; Stout A. and Garrett, T. 2005. Embodying product and process flexibility to cope with chalenging projest deliveries, Journal of Construction Engineering and Management 131: 439-448.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, pp. 439-448
-
-
Gil, N.1
Tommelein, I.D.2
Stout, A.3
Garrett, T.4
-
15
-
-
34547350658
-
Possibilities of clients and contractor's disputes settlement at the pretrial stage
-
Keršulienė, V. 2007. Possibilities of clients and contractor's disputes settlement at the pretrial stage, Technological and Economic Development of Economy 13: 139-143.
-
(2007)
Technological and Economic Development of Economy
, vol.13
, pp. 139-143
-
-
Keršulienė, V.1
-
16
-
-
0037258437
-
The measurement of environmental performance. An application of Ashby's Law
-
Lewis, G. J.; Stewart, N. 2003. The measurement of environmental performance. An application of Ashby's Law, System Research and Behavioral Science 20: 31-52.
-
(2003)
System Research and Behavioral Science
, vol.20
, pp. 31-52
-
-
Lewis, G.J.1
Stewart, N.2
-
18
-
-
85015763679
-
-
Mandelbaum, M. 1978. Flexibility in decision-making: An exploration and unification. PhD thesis, Dept. of Industrial Engineering, University Toronto, Canada. Cited in De Toni, A.; Tonchia, S. 1998. Manufacturing flexibility: a literature review, International Journal on Production Research 36: 1587-1617.
-
Mandelbaum, M. 1978. Flexibility in decision-making: An exploration and unification. PhD thesis, Dept. of Industrial Engineering, University Toronto, Canada. Cited in De Toni, A.; Tonchia, S. 1998. Manufacturing flexibility: a literature review, International Journal on Production Research 36: 1587-1617.
-
-
-
-
20
-
-
33846314372
-
Decision-making in flexible mine production system design using real options
-
Mayer, Z. and Kazakidis, V. 2007. Decision-making in flexible mine production system design using real options, Journal of Construction Engineering and Management 133: 169-180.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, pp. 169-180
-
-
Mayer, Z.1
Kazakidis, V.2
-
24
-
-
57849134042
-
Organizations and management - directions, conceptions, points of view
-
Kozminski, K, Piotrowski, W, red, PWN, Warsaw [in Polish
-
Piotrowski, W. 1995. Organizations and management - directions, conceptions, points of view, in Kozminski, K.; Piotrowski, W. (red.). Management. Theory and Practice. PWN, Warsaw [in Polish].
-
(1995)
Management. Theory and Practice
-
-
Piotrowski, W.1
-
25
-
-
57849158946
-
Einsatz flexibler Fertigungssysteme in der Betonindustrie
-
Reichelt, U. 1987. Einsatz flexibler Fertigungssysteme in der Betonindustrie, Betontechnik 8: 75-77.
-
(1987)
Betontechnik
, vol.8
, pp. 75-77
-
-
Reichelt, U.1
-
26
-
-
85015750303
-
-
Stabryla, A. 2005. Analiza elastyczności systemu jako instrument programowania zmian i rozwoju [System flexibility analysis as a tool for changes and development programming], in Rokita, J.; Grudzewski, W (red.). Elastyczność organizacji. GWSH, Katowice [in Polish].
-
Stabryla, A. 2005. Analiza elastyczności systemu jako instrument programowania zmian i rozwoju [System flexibility analysis as a tool for changes and development programming], in Rokita, J.; Grudzewski, W (red.). Elastyczność organizacji. GWSH, Katowice [in Polish].
-
-
-
-
27
-
-
53349176786
-
Multi-attribute analysis of investments risk alternatives in contruction
-
Shevchenko, G.; Ustinovichius, L.; Andruškevičius, A. 2008. Multi-attribute analysis of investments risk alternatives in contruction, Technological and Economic Development of Economy 14(3): 428-443.
-
(2008)
Technological and Economic Development of Economy
, vol.14
, Issue.3
, pp. 428-443
-
-
Shevchenko, G.1
Ustinovichius, L.2
Andruškevičius, A.3
-
28
-
-
36549000241
-
Post-mortem analysis on the analysis and evaluation of risks in construction project management
-
Schieg, M. 2007. Post-mortem analysis on the analysis and evaluation of risks in construction project management, Journal of Business Economics and Management 8(2): 145-153.
-
(2007)
Journal of Business Economics and Management
, vol.8
, Issue.2
, pp. 145-153
-
-
Schieg, M.1
-
30
-
-
34548230481
-
Application of a qualitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction
-
Ustinovichius, L.; Zavadskas, E. K.; Podvezko, V. 2007. Application of a qualitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction, Control and Cybernetics 36(1): 251-268.
-
(2007)
Control and Cybernetics
, vol.36
, Issue.1
, pp. 251-268
-
-
Ustinovichius, L.1
Zavadskas, E.K.2
Podvezko, V.3
-
31
-
-
33749601255
-
Verbal analysis of risk elements in construction contracts, in CDVE 2006, Lecture Notes in Computer
-
Ustinovichius, L.; Zavadskas, E. K.; Migilinskas, D.; Malewska, A.; Nowak, P.; Minasowicz, A. 2006a. Verbal analysis of risk elements in construction contracts, in CDVE 2006, Lecture Notes in Computer Science 4101: 295-302.
-
(2006)
Science
, vol.4101
, pp. 295-302
-
-
Ustinovichius, L.1
Zavadskas, E.K.2
Migilinskas, D.3
Malewska, A.4
Nowak, P.5
Minasowicz, A.6
-
32
-
-
33845536976
-
A method of determining risk zones of investment in real estate
-
Ustinovichius, L.; Podvezko, V.; Ginevičius, R. 2006b. A method of determining risk zones of investment in real estate, Control and Cybernetics 35(2): 471-486.
-
(2006)
Control and Cybernetics
, vol.35
, Issue.2
, pp. 471-486
-
-
Ustinovichius, L.1
Podvezko, V.2
Ginevičius, R.3
-
33
-
-
0003528687
-
Building the Flexible Firm
-
Oxford University Press, Oxford
-
Volberda, H. 1999. Building the Flexible Firm. How to remain competitive, Oxford University Press, Oxford.
-
(1999)
How to remain competitive
-
-
Volberda, H.1
-
34
-
-
84986079134
-
Flexible problem solving in construction projects on the National Museum of Australia project
-
Walker, D. H. T. and Loosemore, M. 2003. Flexible problem solving in construction projects on the National Museum of Australia project, Team Performance Management: An International Journal 9: 5-15.
-
(2003)
Team Performance Management: An International Journal
, vol.9
, pp. 5-15
-
-
Walker, D.H.T.1
Loosemore, M.2
-
35
-
-
0036140889
-
Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies
-
Walker, D. H. T. and Shen, Y. J. 2002. Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies, Construction Management and Economics 20: 31-44.
-
(2002)
Construction Management and Economics
, vol.20
, pp. 31-44
-
-
Walker, D.H.T.1
Shen, Y.J.2
-
36
-
-
57849118192
-
Contractor selection of construction in a competitive environment
-
Zavadskas, E. K.; Turskis, Z.; Tamošaitienė, J. 2008. Contractor selection of construction in a competitive environment, Journal of Business Economics and Management 9(3): 181-187.
-
(2008)
Journal of Business Economics and Management
, vol.9
, Issue.3
, pp. 181-187
-
-
Zavadskas, E.K.1
Turskis, Z.2
Tamošaitienė, J.3
|