메뉴 건너뛰기




Volumn 14, Issue 4, 2008, Pages 518-530

Flexibility approach in construction process engineering

Author keywords

Construction engineering; Construction process; Flexibility management; Planning and monitoring

Indexed keywords


EID: 57849101665     PISSN: 20294913     EISSN: 20294921     Source Type: Journal    
DOI: 10.3846/1392-8619.2008.14.518-530     Document Type: Conference Paper
Times cited : (18)

References (36)
  • 3
    • 0000259654 scopus 로고
    • General system theory: The skeleton of science
    • Boulding, K. 1956. General system theory: The skeleton of science, Management Science 2: 197-208.
    • (1956) Management Science , vol.2 , pp. 197-208
    • Boulding, K.1
  • 7
    • 0002759166 scopus 로고
    • Planning for strategic flexibility
    • Eppink, D. J. 1978. Planning for strategic flexibility, Long Range Planning 11: 9-15.
    • (1978) Long Range Planning , vol.11 , pp. 9-15
    • Eppink, D.J.1
  • 8
    • 84980248442 scopus 로고
    • Strategic flexibility for high technology manoeuvres: A conceptual framework
    • Evans, J. S. 1991. Strategic flexibility for high technology manoeuvres: a conceptual framework, Journal of Management Studies 28: 69-89.
    • (1991) Journal of Management Studies , vol.28 , pp. 69-89
    • Evans, J.S.1
  • 15
    • 34547350658 scopus 로고    scopus 로고
    • Possibilities of clients and contractor's disputes settlement at the pretrial stage
    • Keršulienė, V. 2007. Possibilities of clients and contractor's disputes settlement at the pretrial stage, Technological and Economic Development of Economy 13: 139-143.
    • (2007) Technological and Economic Development of Economy , vol.13 , pp. 139-143
    • Keršulienė, V.1
  • 16
    • 0037258437 scopus 로고    scopus 로고
    • The measurement of environmental performance. An application of Ashby's Law
    • Lewis, G. J.; Stewart, N. 2003. The measurement of environmental performance. An application of Ashby's Law, System Research and Behavioral Science 20: 31-52.
    • (2003) System Research and Behavioral Science , vol.20 , pp. 31-52
    • Lewis, G.J.1    Stewart, N.2
  • 18
    • 85015763679 scopus 로고    scopus 로고
    • Mandelbaum, M. 1978. Flexibility in decision-making: An exploration and unification. PhD thesis, Dept. of Industrial Engineering, University Toronto, Canada. Cited in De Toni, A.; Tonchia, S. 1998. Manufacturing flexibility: a literature review, International Journal on Production Research 36: 1587-1617.
    • Mandelbaum, M. 1978. Flexibility in decision-making: An exploration and unification. PhD thesis, Dept. of Industrial Engineering, University Toronto, Canada. Cited in De Toni, A.; Tonchia, S. 1998. Manufacturing flexibility: a literature review, International Journal on Production Research 36: 1587-1617.
  • 20
    • 33846314372 scopus 로고    scopus 로고
    • Decision-making in flexible mine production system design using real options
    • Mayer, Z. and Kazakidis, V. 2007. Decision-making in flexible mine production system design using real options, Journal of Construction Engineering and Management 133: 169-180.
    • (2007) Journal of Construction Engineering and Management , vol.133 , pp. 169-180
    • Mayer, Z.1    Kazakidis, V.2
  • 24
    • 57849134042 scopus 로고
    • Organizations and management - directions, conceptions, points of view
    • Kozminski, K, Piotrowski, W, red, PWN, Warsaw [in Polish
    • Piotrowski, W. 1995. Organizations and management - directions, conceptions, points of view, in Kozminski, K.; Piotrowski, W. (red.). Management. Theory and Practice. PWN, Warsaw [in Polish].
    • (1995) Management. Theory and Practice
    • Piotrowski, W.1
  • 25
    • 57849158946 scopus 로고
    • Einsatz flexibler Fertigungssysteme in der Betonindustrie
    • Reichelt, U. 1987. Einsatz flexibler Fertigungssysteme in der Betonindustrie, Betontechnik 8: 75-77.
    • (1987) Betontechnik , vol.8 , pp. 75-77
    • Reichelt, U.1
  • 26
    • 85015750303 scopus 로고    scopus 로고
    • Stabryla, A. 2005. Analiza elastyczności systemu jako instrument programowania zmian i rozwoju [System flexibility analysis as a tool for changes and development programming], in Rokita, J.; Grudzewski, W (red.). Elastyczność organizacji. GWSH, Katowice [in Polish].
    • Stabryla, A. 2005. Analiza elastyczności systemu jako instrument programowania zmian i rozwoju [System flexibility analysis as a tool for changes and development programming], in Rokita, J.; Grudzewski, W (red.). Elastyczność organizacji. GWSH, Katowice [in Polish].
  • 28
    • 36549000241 scopus 로고    scopus 로고
    • Post-mortem analysis on the analysis and evaluation of risks in construction project management
    • Schieg, M. 2007. Post-mortem analysis on the analysis and evaluation of risks in construction project management, Journal of Business Economics and Management 8(2): 145-153.
    • (2007) Journal of Business Economics and Management , vol.8 , Issue.2 , pp. 145-153
    • Schieg, M.1
  • 30
    • 34548230481 scopus 로고    scopus 로고
    • Application of a qualitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction
    • Ustinovichius, L.; Zavadskas, E. K.; Podvezko, V. 2007. Application of a qualitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction, Control and Cybernetics 36(1): 251-268.
    • (2007) Control and Cybernetics , vol.36 , Issue.1 , pp. 251-268
    • Ustinovichius, L.1    Zavadskas, E.K.2    Podvezko, V.3
  • 31
    • 33749601255 scopus 로고    scopus 로고
    • Verbal analysis of risk elements in construction contracts, in CDVE 2006, Lecture Notes in Computer
    • Ustinovichius, L.; Zavadskas, E. K.; Migilinskas, D.; Malewska, A.; Nowak, P.; Minasowicz, A. 2006a. Verbal analysis of risk elements in construction contracts, in CDVE 2006, Lecture Notes in Computer Science 4101: 295-302.
    • (2006) Science , vol.4101 , pp. 295-302
    • Ustinovichius, L.1    Zavadskas, E.K.2    Migilinskas, D.3    Malewska, A.4    Nowak, P.5    Minasowicz, A.6
  • 32
    • 33845536976 scopus 로고    scopus 로고
    • A method of determining risk zones of investment in real estate
    • Ustinovichius, L.; Podvezko, V.; Ginevičius, R. 2006b. A method of determining risk zones of investment in real estate, Control and Cybernetics 35(2): 471-486.
    • (2006) Control and Cybernetics , vol.35 , Issue.2 , pp. 471-486
    • Ustinovichius, L.1    Podvezko, V.2    Ginevičius, R.3
  • 33
    • 0003528687 scopus 로고    scopus 로고
    • Building the Flexible Firm
    • Oxford University Press, Oxford
    • Volberda, H. 1999. Building the Flexible Firm. How to remain competitive, Oxford University Press, Oxford.
    • (1999) How to remain competitive
    • Volberda, H.1
  • 34
    • 84986079134 scopus 로고    scopus 로고
    • Flexible problem solving in construction projects on the National Museum of Australia project
    • Walker, D. H. T. and Loosemore, M. 2003. Flexible problem solving in construction projects on the National Museum of Australia project, Team Performance Management: An International Journal 9: 5-15.
    • (2003) Team Performance Management: An International Journal , vol.9 , pp. 5-15
    • Walker, D.H.T.1    Loosemore, M.2
  • 35
    • 0036140889 scopus 로고    scopus 로고
    • Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies
    • Walker, D. H. T. and Shen, Y. J. 2002. Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies, Construction Management and Economics 20: 31-44.
    • (2002) Construction Management and Economics , vol.20 , pp. 31-44
    • Walker, D.H.T.1    Shen, Y.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.