Volumn 132, Issue 5, 2006, Pages 465-472

Fast-track urban freeway rehabilitation with 55-H weekend closures: I-710 long beach case study

Author keywords

Asphalt pavements; Construction management; Fast track construction; Highway construction; Monitoring; Productivity; Reconstruction; Rehabilitation

Indexed keywords

CONSTRUCTION MANAGEMENT; FAST TRACK CONSTRUCTION; HIGHWAY CONSTRUCTION; PAVEMENT LIFE EXPECTANCY;

EID: 33646188948     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:5(465)     Document Type: Article
Times cited : (15)

References (8)
  • 1
    • 0004023304 scopus 로고    scopus 로고
    • California Department of Transportation (Caltrans). (Transportation Programming, Caltrans, Sacramento, Calif., (June 10, 2003)
    • California Department of Transportation (Caltrans). (1998). Ten-year state highway system rehabilitation plan 1998-99 through 2007-08. Maintenance and Transportation Programming, Caltrans, Sacramento, Calif., 〈 http://www.dot.ca.gov/hq/transprog/reports/tnyrplan.pdf 〉 (June 10, 2003).
    • (1998) Ten-year State Highway System Rehabilitation Plan 1998-99 Through 2007-08
  • 2
    • 84858867701 scopus 로고    scopus 로고
    • California Department of Transportation (Caltrans). Caltrans, Sacramento, Calif., (July 28, 2003)
    • California Department of Transportation (Caltrans). (2003). Long Beach Freeway (I-710) pavement rehabilitation, project overview fact sheet, Caltrans, Sacramento, Calif., 〈 http://cms.longbeach.gov/pw/content/traffic_trans/ 710projectdescription.htm 〉 (July 28, 2003).
    • (2003) Long Beach Freeway (I-710) Pavement Rehabilitation, Project Overview Fact Sheet
  • 4
    • 15944379640 scopus 로고    scopus 로고
    • A computer simulation model: Construction analysis for highway rehabilitation strategies
    • Lee, E. B., and Ibbs, C. W. (2005). " A computer simulation model: Construction analysis for highway rehabilitation strategies.. " J. Constr. Eng. Manage., 131 (4), 449-458.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 449-458
    • Lee, E.B.1    Ibbs, C.W.2
  • 5
    • 15944414569 scopus 로고    scopus 로고
    • Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis
    • Lee, E. B., Ibbs, C. W., and Thomas, D. (2005). " Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis.. " J. Infrastruct. Syst., 11 (4), 250-257.
    • (2005) J. Infrastruct. Syst. , vol.11 , Issue.4 , pp. 250-257
    • Lee, E.B.1    Ibbs, C.W.2    Thomas, D.3
  • 6
    • 29144479768 scopus 로고    scopus 로고
    • TM-UCB-PRC-2004-1, Pavement Research Center, Univ. of California at Berkeley, Berkeley, Calif. (submitted to the California Department of Transportation).
    • Lee, E. B., Mun, J. H., and Harvey, J. T. (2004). " Impact of urban freeway rehabilitation on network traffic: Measurement and simulation study.. " Technical Rep. No. TM-UCB-PRC-2004-1, Pavement Research Center, Univ. of California at Berkeley, Berkeley, Calif. (submitted to the California Department of Transportation).
    • (2004) Impact of Urban Freeway Rehabilitation on Network Traffic: Measurement and Simulation Study
    • Lee, E.B.1    Mun, J.H.2    Harvey, J.T.3
  • 7
    • 0012656277 scopus 로고    scopus 로고
    • Case study of urban concrete pavement rehabilitation on Interstate 10
    • Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2002). " Case study of urban concrete pavement rehabilitation on Interstate 10.. " J. Constr. Eng. Manage., 128 (1), 49-56.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 49-56
    • Lee, E.B.1    Roesler, J.R.2    Harvey, J.T.3    Ibbs, C.W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.