Criticality in resource-constrained networks
-
Bowers, J. A. (1995). "Criticality in resource-constrained networks." J. Oper. Res. Soc. 46(1), 80-91.
-
(1995)
J. Oper. Res. Soc.
, vol.46
, Issue.1
, pp. 80-91
-
-
Bowers, J.A.1
-
3
-
-
0034228552
-
Multiple schedules and measures of resource-constrained float
-
Bowers, J. A. (2000). "Multiple schedules and measures of resource-constrained float." J. Oper. Res. Soc., 51(7), 855-862.
-
(2000)
J. Oper. Res. Soc.
, vol.51
, Issue.7
, pp. 855-862
-
-
Bowers, J.A.1
-
4
-
-
0004278233
-
-
McGraw-Hill, New York
-
Callahan, M. T., Quackenbush, D. G., and Rowings, J. E. (1992). Construction project scheduling, McGraw-Hill, New York.
-
(1992)
Construction Project Scheduling
-
-
Callahan, M.T.1
Quackenbush, D.G.2
Rowings, J.E.3
-
5
-
-
0026381930
-
Total float traded as commodity
-
de la Garza, J. M., Vorster, M. C., and Parvin, C. M. (1991). "Total float traded as commodity." J. Constr. Eng. Manage., 117(4), 716-727.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.4
, pp. 716-727
-
-
De La Garza, J.M.1
Vorster, M.C.2
Parvin, C.M.3
-
6
-
-
0026223051
-
The development of the construction engineer: Past progress and future problems
-
Fondahl, J. W. (1991). "The development of the construction engineer: Past progress and future problems." J. Constr. Eng. Manage., 117(3), 380-392.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.3
, pp. 380-392
-
-
Fondahl, J.W.1
-
7
-
-
0028732872
-
The effect of resource constraints on project schedules
-
DCL
-
Just, M. R., and Murphy, J. P. (1994). "The effect of resource constraints on project schedules." AACE Trans., DCL.2.1-6.
-
(1994)
AACE Trans.
-
-
Just, M.R.1
Murphy, J.P.2
-
8
-
-
0002866635
-
The critical-path method: Resource planning and scheduling
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Kelley, J. E., Jr. (1963). "The critical-path method: Resource planning and scheduling." Industrial scheduling, Prentice-Hall, Englewood Cliffs, N.J., 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley Jr., J.E.1
-
10
-
-
13944280651
-
Resource-activity critical-path method for construction planning
-
Lu, M., and Li, H. (2003). "Resource-activity critical-path method for construction planning." J. Constr. Eng. Manage. 129(4), 412-420.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 412-420
-
-
Lu, M.1
Li, H.2
-
11
-
-
0019615177
-
Fencing a bar chart
-
Melin, J. W., and Whiteaker, B. (1981). "Fencing a bar chart." J. Constr. Div., Am. Soc. Civ. Eng., 107(3), 497-507.
-
(1981)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.107
, Issue.3
, pp. 497-507
-
-
Melin, J.W.1
Whiteaker, B.2
-
12
-
-
0003906653
-
-
Van Nostrand Reinhold, New York
-
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Project management with CPM, PERT, and precedence diagramming, 3rd ed., Van Nostrand Reinhold, New York.
-
(1983)
Project Management with CPM, PERT, and Precedence Diagramming, 3rd Ed.
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.W.3
-
13
-
-
0042436456
-
Network based planning techniques: A critical review of published developments
-
Pergamon, New York
-
Ritchie, E. (1985). "Network based planning techniques: A critical review of published developments." Further developments in operational research, Pergamon, New York.
-
(1985)
Further Developments in Operational Research
-
-
Ritchie, E.1
-
14
-
-
1642353550
-
-
Aspen Law & Business, New York
-
Wickwire, J. M., Driscoll, T. J., and Hurlbut, S. B. (2001). Construction scheduling: Preparation, liability, and claims, 2001 cumulative supplement, Aspen Law & Business, New York.
-
(2001)
Construction Scheduling: Preparation, Liability, and Claims, 2001 Cumulative Supplement
-
-
Wickwire, J.M.1
Driscoll, T.J.2
Hurlbut, S.B.3
-
15
-
-
0001303226
-
Some properties of schedules for large projects with limited resources
-
Wiest, J. D. (1964). "Some properties of schedules for large projects with limited resources." Oper. Res., 12, 395-418.
-
(1964)
Oper. Res.
, vol.12
, pp. 395-418
-
-
Wiest, J.D.1
-
16
-
-
38249030739
-
Identifying the critical sequence in a resource constrained project
-
Woodworth, B. M., and Shanahan, S. (1988). "Identifying the critical sequence in a resource constrained project." Int. J. Proj. Manage. 6(2), 89-96.
-
(1988)
Int. J. Proj. Manage.
, vol.6
, Issue.2
, pp. 89-96
-
-
Woodworth, B.M.1
Shanahan, S.2
|