1
-
-
0019067033
-
Linear programming solution to network compression
-
Perera S. Linear programming solution to network compression. ASCE J Constr Div. 106:1980;315-327.
-
(1980)
ASCE J Constr Div
, vol.106
, pp. 315-327
-
-
Perera, S.1
-
2
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch M., Möhring R.H., Radermacher F.J. Scheduling project networks with resource constraints and time windows. Ann Oper Res. 16:1988;201-240.
-
(1988)
Ann Oper Res
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.J.3
-
4
-
-
0003480493
-
-
Englewood Cliffs, NJ: Prentice Hall
-
Shtub A., Bard J., Globerson S. Project management: engineering, technology and implementations. 1994;Prentice Hall, Englewood Cliffs, NJ. p. 382-92.
-
(1994)
Project Management: Engineering, Technology and Implementations
, pp. 382-392
-
-
Shtub, A.1
Bard, J.2
Globerson, S.3
-
5
-
-
0029470313
-
Construction time-cost trade-off analysis using LP/IP hybrid method
-
Liu L., Burns S.A., Feng C.W. Construction time-cost trade-off analysis using LP/IP hybrid method. ASCE J Constr Eng Manage. 121:(4):1995;446-454.
-
(1995)
ASCE J Constr Eng Manage
, vol.121
, Issue.4
, pp. 446-454
-
-
Liu, L.1
Burns, S.A.2
Feng, C.W.3
-
6
-
-
7544221549
-
Decomposition of project networks
-
Parikh S.C., Jewell W.S. Decomposition of project networks. Manage Sci. 11:1965;444-459.
-
(1965)
Manage Sci
, vol.11
, pp. 444-459
-
-
Parikh, S.C.1
Jewell, W.S.2
-
7
-
-
0014928334
-
Network reduction and solution
-
Crowston W.B., Decision C.P.M. Network reduction and solution. Oper Res Quart. 21:(4):1970;435-452.
-
(1970)
Oper Res Quart
, vol.21
, Issue.4
, pp. 435-452
-
-
Crowston, W.B.1
Decision, C.P.M.2
-
8
-
-
0016566179
-
A dynamic programming solution to cost-time trade-off for CPM
-
Robinson D.R. A dynamic programming solution to cost-time trade-off for CPM. Manage Sci. 22:(2):1975;158-166.
-
(1975)
Manage Sci
, vol.22
, Issue.2
, pp. 158-166
-
-
Robinson, D.R.1
-
9
-
-
0017506038
-
Cost-time model for large CPM project networks
-
Panagiotakopoulos D. Cost-time model for large CPM project networks. ASCE J Constr Div. 103:1977;201-211.
-
(1977)
ASCE J Constr Div
, vol.103
, pp. 201-211
-
-
Panagiotakopoulos, D.1
-
12
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C.W., Liu L., Burns S.A. Using genetic algorithms to solve construction time-cost trade-off problems. ASCE J Comput Civil Eng. 11:(3):1997;184-189.
-
(1997)
ASCE J Comput Civil Eng
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
13
-
-
0032638332
-
Using machine learning and genetic algorithms to solve time-cost trade-off problems (MLGAS)
-
Li H., Cao J.N., Love P.E.D. Using machine learning and genetic algorithms to solve time-cost trade-off problems (MLGAS). ASCE J Constr Eng Manage. 125:(5):1999;347-353.
-
(1999)
ASCE J Constr Eng Manage
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.N.2
Love, P.E.D.3
-
14
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu S.S., Yang C.H. GA-based multicriteria optimal model for construction scheduling. J Constr Eng Manage. 125:(6):1999;420-427.
-
(1999)
J Constr Eng Manage
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.S.1
Yang, C.H.2
-
15
-
-
0002395681
-
Chance-constrained programming
-
Charnes A., Cooper W. Chance-constrained programming. Manage Sci. 6:1959;73-79.
-
(1959)
Manage Sci
, vol.6
, pp. 73-79
-
-
Charnes, A.1
Cooper, W.2
-
16
-
-
0021609393
-
Optimal probabilistic compression of PERT networks
-
Coskunoglu O. Optimal probabilistic compression of PERT networks. ASCE J Constr Eng Manage. 110:(4):1984;437-446.
-
(1984)
ASCE J Constr Eng Manage
, vol.110
, Issue.4
, pp. 437-446
-
-
Coskunoglu, O.1
-
17
-
-
0022099676
-
Bounding the project completion time distribution in PERT networks
-
Dodin B.N. Bounding the project completion time distribution in PERT networks. Oper Res. 33:1985;862-881.
-
(1985)
Oper Res
, vol.33
, pp. 862-881
-
-
Dodin, B.N.1
-
18
-
-
0022745027
-
Stochastic bounds on distributions of optimal value functions with applications to PERT, network flows and reliability
-
Weiss G. Stochastic bounds on distributions of optimal value functions with applications to PERT, network flows and reliability. Oper Res. 34:(4):1986;595-605.
-
(1986)
Oper Res
, vol.34
, Issue.4
, pp. 595-605
-
-
Weiss, G.1
-
19
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng C.W., Liu L., Burns S.A. Stochastic construction time-cost trade-off analysis. ASCE J Comput Civil Eng. 14:(2):2000;117-126.
-
(2000)
ASCE J Comput Civil Eng
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
20
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations
-
Elmaghraby S.E., Kamburowski J. The analysis of activity networks under generalized precedence relations. Manage Sci. 38:1992;1245-1263.
-
(1992)
Manage Sci
, vol.38
, pp. 1245-1263
-
-
Elmaghraby, S.E.1
Kamburowski, J.2
-
21
-
-
0000647152
-
Heuristics for the minimum project duration problem with minimal and maximal time lags under fixed resource constraints
-
Neumann K., Zhan J. Heuristics for the minimum project duration problem with minimal and maximal time lags under fixed resource constraints. J Intell Manuf. 6:1995;145-154.
-
(1995)
J Intell Manuf
, vol.6
, pp. 145-154
-
-
Neumann, K.1
Zhan, J.2
|