메뉴 건너뛰기




Volumn 38, Issue 9-10, 2008, Pages 965-977

Determining the parameters of dual-card kanban system: An integrated multicriteria and artificial neural network methodology

Author keywords

Artificial neural networks; Kanban; Multicriteria decision making; Simulation metamodeling

Indexed keywords

BACKPROPAGATION; COMPUTER NETWORKS; IMAGE CLASSIFICATION; LARGE SCALE SYSTEMS; PROBLEM SOLVING; STRUCTURAL OPTIMIZATION;

EID: 50849118845     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-007-1138-1     Document Type: Article
Times cited : (16)

References (40)
  • 1
    • 0033225131 scopus 로고    scopus 로고
    • An overview of design and operational issues of Kanban Systems
    • Akturk MS, Erhun F (1999) An overview of design and operational issues of Kanban Systems. Int J Prod Res 37:3859-3881
    • (1999) Int J Prod Res , vol.37 , pp. 3859-3881
    • Akturk, M.S.1    Erhun, F.2
  • 2
    • 0038137969 scopus 로고    scopus 로고
    • Scheduling in kanban-controlled flowshops to minimise the makespan of containers
    • Ramanan GV, Rajendran C (2003) Scheduling in kanban-controlled flowshops to minimise the makespan of containers. Int J Adv Manuf Technol 21:348-354
    • (2003) Int J Adv Manuf Technol , vol.21 , pp. 348-354
    • Ramanan, G.V.1    Rajendran, C.2
  • 4
    • 0242564208 scopus 로고    scopus 로고
    • A distributed evolutionary simulation optimisation approach for the configuration of multiproduct kanban systems
    • Paris JL, Pierreval H (2001) A distributed evolutionary simulation optimisation approach for the configuration of multiproduct kanban systems. Int J Comput Integr Manuf 14:421-430
    • (2001) Int J Comput Integr Manuf , vol.14 , pp. 421-430
    • Paris, J.L.1    Pierreval, H.2
  • 5
    • 0034692675 scopus 로고    scopus 로고
    • A neural network procedure for kanban allocation in JIT production control systems
    • Savsar M, Choueiki MH (2000) A neural network procedure for kanban allocation in JIT production control systems. Int J Prod Res 38:3247-3265
    • (2000) Int J Prod Res , vol.38 , pp. 3247-3265
    • Savsar, M.1    Choueiki, M.H.2
  • 9
    • 0028439455 scopus 로고
    • Production planning for a multi-item, multi-stage kanban system
    • Mitwasi MG, Askin RG (1994) Production planning for a multi-item, multi-stage kanban system. Int J Prod Res 32:1173-1195
    • (1994) Int J Prod Res , vol.32 , pp. 1173-1195
    • Mitwasi, M.G.1    Askin, R.G.2
  • 11
    • 84952179325 scopus 로고
    • Design and analysis of Pull System, a method of multi-stage production control
    • Kimura O, Terada H (1981), Design and analysis of Pull System, a method of multi-stage production control. Int J Prod Res 19:241-253
    • (1981) Int J Prod Res , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 12
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic Kanban System
    • Bitran GR, Chang L (1987) A mathematical programming approach to a deterministic Kanban System. Manag Sci 33:427-441
    • (1987) Manag Sci , vol.33 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 13
    • 0026153765 scopus 로고
    • Determining the number of Kanbans in a multiproduct, multistage production system
    • Bard JF, Golony B (1991) Determining the number of kanbans in a multiproduct, multistage production system. Int J Prod Res 29:881-895
    • (1991) Int J Prod Res , vol.29 , pp. 881-895
    • Bard, J.F.1    Golony, B.2
  • 14
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop
    • Philipoom PR, Rees LP, Taylor BW (1996) Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. Int J Prod Res 34:51-69
    • (1996) Int J Prod Res , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3
  • 15
    • 33748743619 scopus 로고    scopus 로고
    • A method to enhance volume flexibility in JIT production Control
    • 2
    • Husseini MS, O'brien C, Hosseini ST (2006) A method to enhance volume flexibility in JIT production Control. Int J Prod Econ 104(2):653-665
    • (2006) Int J Prod Econ , vol.104 , pp. 653-665
    • Husseini, M.S.1    O'Brien, C.2    Hosseini, S.T.3
  • 16
    • 32544454181 scopus 로고    scopus 로고
    • Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
    • Wang S, Sarker B (2006) Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy. Eur J Oper Res 172:179-200
    • (2006) Eur J Oper Res , vol.172 , pp. 179-200
    • Wang, S.1    Sarker, B.2
  • 17
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin RG, Mitwasi MG, Goldberg JB (1993) Determining the number of kanbans in multi-item just-in-time systems. IIE Transactions 25:89-97
    • (1993) IIE Transactions , vol.25 , pp. 89-97
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 18
    • 0031641970 scopus 로고    scopus 로고
    • Optimumum number of kanbans between two adjacent stations
    • Nori VS, Sarker BR (1998) Optimumum number of kanbans between two adjacent stations. Prod Plan Control 9:60-65
    • (1998) Prod Plan Control , vol.9 , pp. 60-65
    • Nori, V.S.1    Sarker, B.R.2
  • 19
    • 0035898986 scopus 로고    scopus 로고
    • An adaptive approach to controlling kanban systems
    • Tardif V, Maaseidvaag L(2001) An adaptive approach to controlling kanban systems. Eur J Oper Res 132:411-424
    • (2001) Eur J Oper Res , vol.132 , pp. 411-424
    • Tardif, V.1    Maaseidvaag, L.2
  • 20
    • 0024607145 scopus 로고
    • A system dynamics model for a multi-stage, multi-line dual-card JIT-Kanban system
    • Gupta YP, Gupta MC (1989), A system dynamics model for a multi-stage, multi-line dual-card JIT-Kanban system. Int J of Production Research 27:309-352
    • (1989) Int J of Production Research , vol.27 , pp. 309-352
    • Gupta, Y.P.1    Gupta, M.C.2
  • 21
    • 3342935311 scopus 로고
    • Service time distributions and the performance of a pull system
    • Sarker BR (1990) Service time distributions and the performance of a pull system. Prod Plan Control 3:155-165
    • (1990) Prod Plan Control , vol.3 , pp. 155-165
    • Sarker, B.R.1
  • 22
    • 0030269846 scopus 로고    scopus 로고
    • Effects of kanban withdrawal policies and other factors on the performance of JIT systems: A simulation study
    • Savsar M (1996), Effects of kanban withdrawal policies and other factors on the performance of JIT systems: a simulation study. Int J Prod Res 34:205-214
    • (1996) Int J Prod Res , vol.34 , pp. 205-214
    • Savsar, M.1
  • 23
    • 3543081615 scopus 로고    scopus 로고
    • Trade-off between maximizing throughput rate and minimizing system time in kanban systems
    • Andijani A (1997) Trade-off between maximizing throughput rate and minimizing system time in kanban systems. Int J Oper Prod Manage 17:429-445
    • (1997) Int J Oper Prod Manage , vol.17 , pp. 429-445
    • Andijani, A.1
  • 24
    • 0032681337 scopus 로고    scopus 로고
    • Determination of the optimal number of kanbans and kanban allocation in a FMS: A simulation based study
    • Sengupta S, Sharief S, Dutta P (1999) Determination of the optimal number of kanbans and kanban allocation in a FMS: a simulation based study. Prod Plan Control 10:439-447
    • (1999) Prod Plan Control , vol.10 , pp. 439-447
    • Sengupta, S.1    Sharief, S.2    Dutta, P.3
  • 25
    • 0036937189 scopus 로고    scopus 로고
    • Kanban optimization by simulation and evolution
    • Kochel P, Nielander U(2002) Kanban optimization by simulation and evolution. Prod Plan Control 13:725-734
    • (2002) Prod Plan Control , vol.13 , pp. 725-734
    • Kochel, P.1    Nielander, U.2
  • 26
    • 0042322869 scopus 로고    scopus 로고
    • Design of a two-card dynamic kanban system using a simulated annealing algorithm
    • Shahabudeen P, Krishnaiah, Narayanan MT (2003) Design of a two-card dynamic kanban system using a simulated annealing algorithm. Int J Adv Manuf Technol 21:754-759
    • (2003) Int J Adv Manuf Technol , vol.21 , pp. 754-759
    • Shahabudeen, P.1    Narayanan, M.T.2
  • 27
    • 0030194006 scopus 로고    scopus 로고
    • Determining the number of kanbans: A simulation metamodeling approach
    • Aytug H, Dogan CA, Bezmez G (1996) Determining the number of kanbans: A simulation metamodeling approach. Simulation 67:23-32
    • (1996) Simulation , vol.67 , pp. 23-32
    • Aytug, H.1    Dogan, C.A.2    Bezmez, G.3
  • 28
    • 0031284208 scopus 로고    scopus 로고
    • An example of simulation optimization using a neural network metamodel: Finding the optimum number of kanbans in manufacturing system
    • Hurrion RD (1997) An example of simulation optimization using a neural network metamodel: finding the optimum number of kanbans in manufacturing system. J Oper Res Soc 48:1105-1112
    • (1997) J Oper Res Soc , vol.48 , pp. 1105-1112
    • Hurrion, R.D.1
  • 29
    • 0004063090 scopus 로고    scopus 로고
    • Prentice-Hall N Jersey NY
    • Haykin S (1999) Neural Networks, Prentice-Hall, N. Jersey NY
    • (1999) Neural Networks
    • Haykin, S.1
  • 31
    • 0000646059 scopus 로고
    • Learning internal representations by error propagation
    • PDP Research Group
    • Rumelhart DE, McClelland J; PDP Research Group (1986) Learning internal representations by error propagation. Parallel Distributed Processing 1:318-362
    • (1986) Parallel Distributed Processing , vol.1 , pp. 318-362
    • Rumelhart, D.E.1
  • 32
    • 0037143042 scopus 로고    scopus 로고
    • Simulation metamodeling with neural networks: An experimental investigation
    • Sabuncuoglu I, Touhami S (2002) Simulation metamodeling with neural networks: an experimental investigation. Int J Prod Res 40:2483-2505
    • (2002) Int J Prod Res , vol.40 , pp. 2483-2505
    • Sabuncuoglu, I.1    Touhami, S.2
  • 35
    • 0032003280 scopus 로고    scopus 로고
    • Neural network as a simulation metamodel in economic analysis of risky projects
    • Badiru A, Siege D (1998) Neural network as a simulation metamodel in economic analysis of risky projects. Eur J Oper Res 105:130-142
    • (1998) Eur J Oper Res , vol.105 , pp. 130-142
    • Badiru, A.1    Siege, D.2
  • 36
    • 33745590728 scopus 로고    scopus 로고
    • A simulation based multi-criteria scheduling approach of dual resource constrained manufacturing systems with neural Networks, AI2005
    • Araz UO (2005) A simulation based multi-criteria scheduling approach of dual resource constrained manufacturing systems with neural Networks, AI2005. Lec Notes Artif Intell 3809:1047-1052
    • (2005) Lec Notes Artif Intell , vol.3809 , pp. 1047-1052
    • Araz, U.O.1
  • 38
    • 0000054991 scopus 로고    scopus 로고
    • Development and evaluation of five fuzzy multi-attribute decision making methods
    • Triantaphyllou E, Lin CT (1996) Development and evaluation of five fuzzy multi-attribute decision making methods. Int J Approx Reason 14:281-310
    • (1996) Int J Approx Reason , vol.14 , pp. 281-310
    • Triantaphyllou, E.1    Lin, C.T.2
  • 40
    • 0031103287 scopus 로고    scopus 로고
    • An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment
    • Gupta SM, Al-Turki AY (1997), An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment. Prod Plan Control 8:133-141
    • (1997) Prod Plan Control , vol.8 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, A.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.