메뉴 건너뛰기




Volumn 34, Issue 10, 1996, Pages 2879-2899

Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; OPERATIONS RESEARCH; PERFORMANCE; PROCESS CONTROL; PROCESSING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; SIMULATION;

EID: 0030269846     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905064     Document Type: Article
Times cited : (32)

References (50)
  • 1
    • 0011756777 scopus 로고
    • On some factors affecting the just-in-time production system output variability-a simulation study using Taguchi techniques
    • Abdul-Nour, G-, 1993, On some factors affecting the just-in-time production system output variability-a simulation study using Taguchi techniques. Computers and Industrial Engineering, 25 (1-4), 461-464.
    • (1993) Computers and Industrial Engineering , vol.25 , Issue.1-4 , pp. 461-464
    • Abdul-Nour, G.1
  • 2
    • 0026141525 scopus 로고
    • A comparative study of US manufacturing firms at various stages of just-in-time implementation
    • Ahmed, N. U., Tunc, E. A. and Montagno, R. V., 1991, A comparative study of US manufacturing firms at various stages of just-in-time implementation. International Journal of Production Research, 29 (4), 787-802.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 787-802
    • Ahmed, N.U.1    Tunc, E.A.2    Montagno, R.V.3
  • 4
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multi-product, multistage production system
    • Bard, J. F. and Golany, B., 1991, Determining the number of kanbans in a multi-product, multistage production system. International Journal of Production Research, 29 (5), 881-895.
    • (1991) International Journal of Production Research , vol.29 , Issue.5 , pp. 881-895
    • Bard, J.F.1    Golany, B.2
  • 6
    • 84985774777 scopus 로고
    • A decomposition approximation for periodic kanban-controlled flow shops
    • Berkley, B. J., 1992, A decomposition approximation for periodic kanban-controlled flow shops. Decision Sciences, 23, 291-311.
    • (1992) Decision Sciences , vol.23 , pp. 291-311
    • Berkley, B.J.1
  • 7
    • 0023330726 scopus 로고
    • A Mathematical Programming Approach to a Deterministic Kanban System
    • Bitran, G. R. and Chang, L., 1987, A Mathematical Programming Approach to a Deterministic Kanban System. Management Science, 33 (4), 427-441.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 8
    • 0016557614 scopus 로고
    • The gamma distribution and inventory control
    • Bürgin, T. A., 1975, The gamma distribution and inventory control. Operational Research Quarterly, 23 (23), 507-525.
    • (1975) Operational Research Quarterly , vol.23 , Issue.23 , pp. 507-525
    • Bürgin, T.A.1
  • 10
    • 0038706152 scopus 로고
    • Designing performance measurement systems for justin-time operations
    • Crawford, K. M. and Cox, J. P., 1990, Designing performance measurement systems for justin-time operations. International Journal of Production Research, 28 (1), 2025-2036.
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 2025-2036
    • Crawford, K.M.1    Cox, J.P.2
  • 11
    • 0026237478 scopus 로고
    • Narrowing the gap? Stock turns in the Japanese and Western car industries
    • Delbridge, R. and Oliver, N., 1991, Narrowing the gap? Stock turns in the Japanese and Western car industries. International Journal of Production Research, 29 (10), 2083-2095.
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 2083-2095
    • Delbridge, R.1    Oliver, N.2
  • 12
    • 0022673843 scopus 로고
    • An examination of just-in-time management for the small manufacturer with an illustration
    • Finch, B. J. and Cox, J. F., 1991, An examination of just-in-time management for the small manufacturer with an illustration. International Journal of Production Research, 24 (2), 329-342.
    • (1991) International Journal of Production Research , vol.24 , Issue.2 , pp. 329-342
    • Finch, B.J.1    Cox, J.F.2
  • 14
    • 0027684952 scopus 로고
    • The determination of optima! number of kanbans in a just-in-time production system
    • Fukukawa, T. and Hong, S. C., 1993, The determination of optima! number of kanbans in a just-in-time production system. Computers in Industrial Engineering, 24 (4), 551-559.
    • (1993) Computers in Industrial Engineering , vol.24 , Issue.4 , pp. 551-559
    • Fukukawa, T.1    Hong, S.C.2
  • 16
    • 0026869895 scopus 로고
    • Economic manufacturing quantity in a just-in-time delivery system
    • Goliiar, D. Y. and Sarker, B. R., 1992, Economic manufacturing quantity in a just-in-time delivery system. International Journal of Production Research, 30 (5), 961-972.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 961-972
    • Goliiar, D.Y.1    Sarker, B.R.2
  • 18
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese justin-time technique (With kanbans) for multi-line, multi-stage production systems
    • Huang P. Y., Rees, L. P. and Taylor, R. W., 1983, A simulation analysis of the Japanese justin-time technique (with kanbans) for multi-line, multi-stage production systems. Decision Sciences, 14, 326-344.
    • (1983) Decision Sciences , vol.14 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor, R.W.3
  • 19
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
    • Hodgson, T. J. and Wang, D., 1991a, Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. International Journal of Production Research, 29 (6), 1279-1287.
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.2
  • 20
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies fora parallel multistage system: Part II
    • Hodgson, T. J. and Wang, D., 1991b. Optimal hybrid push/pull control strategies fora parallel multistage system: part II. International Journal of Production Research. 29 (7), 1453-1460.
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.2
  • 21
    • 0038029646 scopus 로고
    • Lessons from Japanese production management
    • Im, J. H., 1989. Lessons from Japanese production management. Production and Inventory Management, 30, 25-29.
    • (1989) Production and Inventory Management , vol.30 , pp. 25-29
    • Im, J.H.1
  • 23
    • 84952179325 scopus 로고
    • Design and Analysis of Pull Systems, a Method of MultiStage Production Control
    • Kimura, O. and Terada, H., 1981. Design and Analysis of Pull Systems, a Method of MultiStage Production Control. International Journal of Production Research, 19 (3), 241-253.
    • (1981) International Journal of Production Research , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 25
    • 0025894459 scopus 로고
    • A dynamic programming model for the kanban assignment problem in a multi-stage multi-period production system
    • Li, A. and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multi-stage multi-period production system. International Journal of Production Research, 29(1), 1-16.
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 1-16
    • Li, A.1    Co, H.C.2
  • 26
    • 0027675515 scopus 로고
    • A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility
    • Linn, R. J. and Xie, X., 1993. A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility. International Journal of Production Research, 22 (10), 2355-2367.
    • (1993) International Journal of Production Research , vol.22 , Issue.10 , pp. 2355-2367
    • Linn, R.J.1    Xie, X.2
  • 34
    • 0003486518 scopus 로고
    • (Pennsylvania, USA: Systems Modeling Co.)
    • Pecden, C. D., 1987, Introduction to SIM AN (Pennsylvania, USA: Systems Modeling Co.).
    • (1987) Introduction to SIM AN
    • Pecden, C.D.1
  • 35
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining work centre lotsiz.Es in a just-in-time system with signal kanbans
    • Puilipoom, P. R., Rees, L. P., Taylor III, B. W., and Huang P. Y., 1986. A mathematical programming approach for determining work centre lotsiz.es in a just-in-time system with signal kanbans. International Journal of Production Research, 28 (1), 1-15.
    • (1986) International Journal of Production Research , vol.28 , Issue.1 , pp. 1-15
    • Puilipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 36
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time
    • Rees, L. P., Puilipoom, P. R., Taylor III, B. W., and Huang P. Y., 1987. Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time. HE Transactions, 19(12), 199-207.
    • (1987) HE Transactions , vol.19 , Issue.12 , pp. 199-207
    • Rees, L.P.1    Puilipoom, P.R.2    Taylor, B.W.3    Huang, P.Y.4
  • 37
    • 0023859422 scopus 로고
    • The effect of imbalance in a just-in-time production system: A simulation study
    • Sarker, B. R, and Harris, R. D., 1988, The effect of imbalance in a just-in-time production system: a simulation study. International Journal of Production Research, 26 (1), 1-18.
    • (1988) International Journal of Production Research , vol.26 , Issue.1 , pp. 1-18
    • Sarker, B.R.1    Harris, R.D.2
  • 38
    • 0024865074 scopus 로고
    • Simulating a just-in-time production system
    • Sarker, B. R., 1989. Simulating a just-in-time production system. Computers and Industrial Engineering, 16(1), 127-137.
    • (1989) Computers and Industrial Engineering , vol.16 , Issue.1 , pp. 127-137
    • Sarker, B.R.1
  • 39
    • 3342935311 scopus 로고
    • Service lime distributions and the performance of a pull system
    • Sarker, B. R., 1990, Service lime distributions and the performance of a pull system. Production Planning and Control.
    • (1990) Production Planning and Control
    • Sarker, B.R.1
  • 40
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarker, B. R, and Fitzsimmons, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27 (1), 1715-1731.
    • (1989) International Journal of Production Research , vol.27 , Issue.1 , pp. 1715-1731
    • Sarker, B.R.1    Fitzsimmons, J.A.2
  • 42
    • 0022111332 scopus 로고
    • Just-in-time (JIT) with kanban manufacturing system simulation on a microcomputer
    • Schroer, B. J., Black, J. T. and Zhang, S. X., 1985, Just-in-time (JIT) with kanban manufacturing system simulation on a microcomputer. Simulation, 45, 52-70.
    • (1985) Simulation , vol.45 , pp. 52-70
    • Schroer, B.J.1    Black, J.T.2    Zhang, S.X.3
  • 43
    • 0028405569 scopus 로고
    • A Pull Production System Modelling and Characteristics
    • Siha, S., 1994, A Pull Production System Modelling and Characteristics. International Journal of Production Research, 32 (4), 933-949.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 933-949
    • Siha, S.1
  • 44
    • 0017557653 scopus 로고
    • Toyota production system and kanban system, materialization of just-in-time and respect for human system
    • Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., 1977, Toyota production system and kanban system, materialization of just-in-time and respect for human system. International Journal of Production Research, 15, 553-564.
    • (1977) International Journal of Production Research , vol.15 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 46
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M., 1989, A review of the dual resource constrained system research. HE Transactions, 21, 279-287.
    • (1989) HE Transactions , vol.21 , pp. 279-287
    • Treleven, M.1
  • 47
    • 0026624344 scopus 로고
    • A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
    • Sumichrast, R. T., Russell, R. S. and Taylor III, B. W., 1992, A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. International Journal of Production Research, 30 (1), 199-214.
    • (1992) International Journal of Production Research , vol.30 , Issue.1 , pp. 199-214
    • Sumichrast, R.T.1    Russell, R.S.2    Taylor, B.W.3
  • 48
    • 3943049520 scopus 로고
    • Determining the number of kanbans: A step toward non-stop production
    • Wang, H. and Wang, H. P., 1990, Determining the number of kanbans: a step toward non-stop production. International Journal of Production Research, 28 (11), 2101-2115.
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 2101-2115
    • Wang, H.1    Wang, H.P.2
  • 50
    • 0028529848 scopus 로고
    • Towards a more economic production and just-in-time delivery system
    • Zhuang, L., 1994, Towards a more economic production and just-in-time delivery system. International Journal of Production Research, 36, 307-313.
    • (1994) International Journal of Production Research , vol.36 , pp. 307-313
    • Zhuang, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.