-
1
-
-
0011756777
-
On some factors affecting the just-in-time production system output variability-a simulation study using Taguchi techniques
-
Abdul-Nour, G-, 1993, On some factors affecting the just-in-time production system output variability-a simulation study using Taguchi techniques. Computers and Industrial Engineering, 25 (1-4), 461-464.
-
(1993)
Computers and Industrial Engineering
, vol.25
, Issue.1-4
, pp. 461-464
-
-
Abdul-Nour, G.1
-
2
-
-
0026141525
-
A comparative study of US manufacturing firms at various stages of just-in-time implementation
-
Ahmed, N. U., Tunc, E. A. and Montagno, R. V., 1991, A comparative study of US manufacturing firms at various stages of just-in-time implementation. International Journal of Production Research, 29 (4), 787-802.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 787-802
-
-
Ahmed, N.U.1
Tunc, E.A.2
Montagno, R.V.3
-
3
-
-
0026820546
-
Maintenance policies in just-in-time manufacturing lines
-
Albino, V., Carella, G. and Okogbaa, O. G., 1992, Maintenance policies in just-in-time manufacturing lines. International Journal of Production Research, 30 (2), 369-382.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.2
, pp. 369-382
-
-
Albino, V.1
Carella, G.2
Okogbaa, O.G.3
-
4
-
-
0026153765
-
Determining the number of kanbans in a multi-product, multistage production system
-
Bard, J. F. and Golany, B., 1991, Determining the number of kanbans in a multi-product, multistage production system. International Journal of Production Research, 29 (5), 881-895.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.5
, pp. 881-895
-
-
Bard, J.F.1
Golany, B.2
-
6
-
-
84985774777
-
A decomposition approximation for periodic kanban-controlled flow shops
-
Berkley, B. J., 1992, A decomposition approximation for periodic kanban-controlled flow shops. Decision Sciences, 23, 291-311.
-
(1992)
Decision Sciences
, vol.23
, pp. 291-311
-
-
Berkley, B.J.1
-
7
-
-
0023330726
-
A Mathematical Programming Approach to a Deterministic Kanban System
-
Bitran, G. R. and Chang, L., 1987, A Mathematical Programming Approach to a Deterministic Kanban System. Management Science, 33 (4), 427-441.
-
(1987)
Management Science
, vol.33
, Issue.4
, pp. 427-441
-
-
Bitran, G.R.1
Chang, L.2
-
8
-
-
0016557614
-
The gamma distribution and inventory control
-
Bürgin, T. A., 1975, The gamma distribution and inventory control. Operational Research Quarterly, 23 (23), 507-525.
-
(1975)
Operational Research Quarterly
, vol.23
, Issue.23
, pp. 507-525
-
-
Bürgin, T.A.1
-
9
-
-
0025403734
-
Towards an Adaptive Kanban System
-
Chaudhury, A. and Whinston, A. B., 1990, Towards an Adaptive Kanban System. International Journal of Production Research, 28 (3), 437-458.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.3
, pp. 437-458
-
-
Chaudhury, A.1
Whinston, A.B.2
-
10
-
-
0038706152
-
Designing performance measurement systems for justin-time operations
-
Crawford, K. M. and Cox, J. P., 1990, Designing performance measurement systems for justin-time operations. International Journal of Production Research, 28 (1), 2025-2036.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 2025-2036
-
-
Crawford, K.M.1
Cox, J.P.2
-
11
-
-
0026237478
-
Narrowing the gap? Stock turns in the Japanese and Western car industries
-
Delbridge, R. and Oliver, N., 1991, Narrowing the gap? Stock turns in the Japanese and Western car industries. International Journal of Production Research, 29 (10), 2083-2095.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.10
, pp. 2083-2095
-
-
Delbridge, R.1
Oliver, N.2
-
12
-
-
0022673843
-
An examination of just-in-time management for the small manufacturer with an illustration
-
Finch, B. J. and Cox, J. F., 1991, An examination of just-in-time management for the small manufacturer with an illustration. International Journal of Production Research, 24 (2), 329-342.
-
(1991)
International Journal of Production Research
, vol.24
, Issue.2
, pp. 329-342
-
-
Finch, B.J.1
Cox, J.F.2
-
13
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S. D. P., Miltenburg, G. J. and Wijngaard, J., 1991, Embedding JIT into MRP. International Journal of Production Research, 29 (2), 329-341.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.2
, pp. 329-341
-
-
Flapper, S.D.P.1
Miltenburg, G.J.2
Wijngaard, J.3
-
14
-
-
0027684952
-
The determination of optima! number of kanbans in a just-in-time production system
-
Fukukawa, T. and Hong, S. C., 1993, The determination of optima! number of kanbans in a just-in-time production system. Computers in Industrial Engineering, 24 (4), 551-559.
-
(1993)
Computers in Industrial Engineering
, vol.24
, Issue.4
, pp. 551-559
-
-
Fukukawa, T.1
Hong, S.C.2
-
15
-
-
0026137976
-
The just-in-time philosophy: A literature review
-
Goliiar, D. Y. and Stamm, C. L., 1991, The just-in-time philosophy: a literature review. International Journal of Production Research, 29 (4), 657-676.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 657-676
-
-
Goliiar, D.Y.1
Stamm, C.L.2
-
16
-
-
0026869895
-
Economic manufacturing quantity in a just-in-time delivery system
-
Goliiar, D. Y. and Sarker, B. R., 1992, Economic manufacturing quantity in a just-in-time delivery system. International Journal of Production Research, 30 (5), 961-972.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.5
, pp. 961-972
-
-
Goliiar, D.Y.1
Sarker, B.R.2
-
17
-
-
0022246227
-
Cellular manufacturing; an overview and bibliography
-
Huang P. Y, and Houck, B. L. W., 1985, Cellular manufacturing; an overview and bibliography. Production and Inventory Management, 26, 83-93.
-
(1985)
Production and Inventory Management
, vol.26
, pp. 83-93
-
-
Huang, P.Y.1
Houck, B.L.W.2
-
18
-
-
84989486136
-
A simulation analysis of the Japanese justin-time technique (With kanbans) for multi-line, multi-stage production systems
-
Huang P. Y., Rees, L. P. and Taylor, R. W., 1983, A simulation analysis of the Japanese justin-time technique (with kanbans) for multi-line, multi-stage production systems. Decision Sciences, 14, 326-344.
-
(1983)
Decision Sciences
, vol.14
, pp. 326-344
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor, R.W.3
-
19
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
-
Hodgson, T. J. and Wang, D., 1991a, Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. International Journal of Production Research, 29 (6), 1279-1287.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1279-1287
-
-
Hodgson, T.J.1
Wang, D.2
-
20
-
-
0026187108
-
Optimal hybrid push/pull control strategies fora parallel multistage system: Part II
-
Hodgson, T. J. and Wang, D., 1991b. Optimal hybrid push/pull control strategies fora parallel multistage system: part II. International Journal of Production Research. 29 (7), 1453-1460.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1453-1460
-
-
Hodgson, T.J.1
Wang, D.2
-
21
-
-
0038029646
-
Lessons from Japanese production management
-
Im, J. H., 1989. Lessons from Japanese production management. Production and Inventory Management, 30, 25-29.
-
(1989)
Production and Inventory Management
, vol.30
, pp. 25-29
-
-
Im, J.H.1
-
22
-
-
3343023138
-
A just-in-time aggregate scheduling model
-
Cincinnati, Ohio, USA
-
Kabak, I. W. and Pourbabai, B., 1987, A just-in-time aggregate scheduling model. Proceedings of the 9th International Conference on Production Research, Cincinnati, Ohio, USA, pp. 889-895.
-
(1987)
Proceedings of the 9Th International Conference on Production Research
, pp. 889-895
-
-
Kabak, I.W.1
Pourbabai, B.2
-
23
-
-
84952179325
-
Design and Analysis of Pull Systems, a Method of MultiStage Production Control
-
Kimura, O. and Terada, H., 1981. Design and Analysis of Pull Systems, a Method of MultiStage Production Control. International Journal of Production Research, 19 (3), 241-253.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.3
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
24
-
-
0026746786
-
Describing processing time when simulating JIT environments
-
Krishnamurty, M., Swenseth, S. R. and Wilson, R. L., 1992, Describing processing time when simulating JIT environments. International Journal of Production Research, 30 (I), 1-11.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 1-11
-
-
Krishnamurty, M.1
Swenseth, S.R.2
Wilson, R.L.3
-
25
-
-
0025894459
-
A dynamic programming model for the kanban assignment problem in a multi-stage multi-period production system
-
Li, A. and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multi-stage multi-period production system. International Journal of Production Research, 29(1), 1-16.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.1
, pp. 1-16
-
-
Li, A.1
Co, H.C.2
-
26
-
-
0027675515
-
A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility
-
Linn, R. J. and Xie, X., 1993. A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility. International Journal of Production Research, 22 (10), 2355-2367.
-
(1993)
International Journal of Production Research
, vol.22
, Issue.10
, pp. 2355-2367
-
-
Linn, R.J.1
Xie, X.2
-
27
-
-
0026711394
-
Basic Concepts of JIT Modelling
-
Mejahi, O. and Wasserman, G. S., 1992, Basic Concepts of JIT Modelling. International Journal of Production Research, 30 (1), 141-149.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 141-149
-
-
Mejahi, O.1
Wasserman, G.S.2
-
28
-
-
0025897672
-
Designing and phasing in just-in-time production systems
-
Miltenburg, J. and Wijngaard, J., 1991, Designing and phasing in just-in-time production systems. International Journal of Production Research, 29(1), 115-131.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.1
, pp. 115-131
-
-
Miltenburg, J.1
Wijngaard, J.2
-
31
-
-
0026746786
-
Describing processing time when simulating JIT environment
-
MuRalidhar, K., Sweensëth, S. R. and Wilson, R. L., 1992, Describing processing time when simulating JIT environment. International Journal of Production Research, 30 (1), 1-11.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 1-11
-
-
Muralidhar, K.1
Sweensëth, S.R.2
Wilson, R.L.3
-
32
-
-
85010610736
-
The optimal operation planning of kanban to minimize the total operation cost
-
Cincinnati, Ohio
-
Myazaki, S., Ohta, H. and Nishiyama, N., 1987, The optimal operation planning of kanban to minimize the total operation cost. Proceedings of the 9llt International Conference on Production Research, Cincinnati, Ohio, pp. 903-909.
-
(1987)
Proceedings of the 9Llt International Conference on Production Research
, pp. 903-909
-
-
Myazaki, S.1
Ohta, H.2
Nishiyama, N.3
-
33
-
-
3342902247
-
Planning for just-in-time manufacturing
-
Cincinnati, Ohio
-
Nisanci, I. and Nicoll, A., 1987, Planning for just-in-time manufacturing. Proceedings of the 9th International Conference on Production Research, Cincinnati, Ohio, pp. 896-902.
-
(1987)
Proceedings of the 9Th International Conference on Production Research
, pp. 896-902
-
-
Nisanci, I.1
Nicoll, A.2
-
34
-
-
0003486518
-
-
(Pennsylvania, USA: Systems Modeling Co.)
-
Pecden, C. D., 1987, Introduction to SIM AN (Pennsylvania, USA: Systems Modeling Co.).
-
(1987)
Introduction to SIM AN
-
-
Pecden, C.D.1
-
35
-
-
0025262876
-
A mathematical programming approach for determining work centre lotsiz.Es in a just-in-time system with signal kanbans
-
Puilipoom, P. R., Rees, L. P., Taylor III, B. W., and Huang P. Y., 1986. A mathematical programming approach for determining work centre lotsiz.es in a just-in-time system with signal kanbans. International Journal of Production Research, 28 (1), 1-15.
-
(1986)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 1-15
-
-
Puilipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
Huang, P.Y.4
-
36
-
-
0023365980
-
Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time
-
Rees, L. P., Puilipoom, P. R., Taylor III, B. W., and Huang P. Y., 1987. Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time. HE Transactions, 19(12), 199-207.
-
(1987)
HE Transactions
, vol.19
, Issue.12
, pp. 199-207
-
-
Rees, L.P.1
Puilipoom, P.R.2
Taylor, B.W.3
Huang, P.Y.4
-
37
-
-
0023859422
-
The effect of imbalance in a just-in-time production system: A simulation study
-
Sarker, B. R, and Harris, R. D., 1988, The effect of imbalance in a just-in-time production system: a simulation study. International Journal of Production Research, 26 (1), 1-18.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.1
, pp. 1-18
-
-
Sarker, B.R.1
Harris, R.D.2
-
38
-
-
0024865074
-
Simulating a just-in-time production system
-
Sarker, B. R., 1989. Simulating a just-in-time production system. Computers and Industrial Engineering, 16(1), 127-137.
-
(1989)
Computers and Industrial Engineering
, vol.16
, Issue.1
, pp. 127-137
-
-
Sarker, B.R.1
-
39
-
-
3342935311
-
Service lime distributions and the performance of a pull system
-
Sarker, B. R., 1990, Service lime distributions and the performance of a pull system. Production Planning and Control.
-
(1990)
Production Planning and Control
-
-
Sarker, B.R.1
-
40
-
-
0024748621
-
The performance of push and pull systems: A simulation and comparative study
-
Sarker, B. R, and Fitzsimmons, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27 (1), 1715-1731.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.1
, pp. 1715-1731
-
-
Sarker, B.R.1
Fitzsimmons, J.A.2
-
42
-
-
0022111332
-
Just-in-time (JIT) with kanban manufacturing system simulation on a microcomputer
-
Schroer, B. J., Black, J. T. and Zhang, S. X., 1985, Just-in-time (JIT) with kanban manufacturing system simulation on a microcomputer. Simulation, 45, 52-70.
-
(1985)
Simulation
, vol.45
, pp. 52-70
-
-
Schroer, B.J.1
Black, J.T.2
Zhang, S.X.3
-
43
-
-
0028405569
-
A Pull Production System Modelling and Characteristics
-
Siha, S., 1994, A Pull Production System Modelling and Characteristics. International Journal of Production Research, 32 (4), 933-949.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 933-949
-
-
Siha, S.1
-
44
-
-
0017557653
-
Toyota production system and kanban system, materialization of just-in-time and respect for human system
-
Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., 1977, Toyota production system and kanban system, materialization of just-in-time and respect for human system. International Journal of Production Research, 15, 553-564.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
45
-
-
0002256871
-
A Review of Literature Relating to JIT
-
Sohal, A. S., Keller, A. Z. and Fouad, R. H., 1988, A Review of Literature Relating to JIT. International Journal of Operations and Production Management, 9, 15-25.
-
(1988)
International Journal of Operations and Production Management
, vol.9
, pp. 15-25
-
-
Sohal, A.S.1
Keller, A.Z.2
Fouad, R.H.3
-
46
-
-
0024731874
-
A review of the dual resource constrained system research
-
Treleven, M., 1989, A review of the dual resource constrained system research. HE Transactions, 21, 279-287.
-
(1989)
HE Transactions
, vol.21
, pp. 279-287
-
-
Treleven, M.1
-
47
-
-
0026624344
-
A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
-
Sumichrast, R. T., Russell, R. S. and Taylor III, B. W., 1992, A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. International Journal of Production Research, 30 (1), 199-214.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 199-214
-
-
Sumichrast, R.T.1
Russell, R.S.2
Taylor, B.W.3
-
48
-
-
3943049520
-
Determining the number of kanbans: A step toward non-stop production
-
Wang, H. and Wang, H. P., 1990, Determining the number of kanbans: a step toward non-stop production. International Journal of Production Research, 28 (11), 2101-2115.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.11
, pp. 2101-2115
-
-
Wang, H.1
Wang, H.P.2
-
50
-
-
0028529848
-
Towards a more economic production and just-in-time delivery system
-
Zhuang, L., 1994, Towards a more economic production and just-in-time delivery system. International Journal of Production Research, 36, 307-313.
-
(1994)
International Journal of Production Research
, vol.36
, pp. 307-313
-
-
Zhuang, L.1
|