메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 653-665

A method to enhance volume flexibility in JIT production control

Author keywords

Flexible Kanban; Just in time; Production control; Strategic flexibility; Volume flexibility

Indexed keywords

COSTS; INDUSTRIAL ECONOMICS; INTEGER PROGRAMMING; MARKETING; OPTIMIZATION; STRATEGIC PLANNING;

EID: 33748743619     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.05.025     Document Type: Article
Times cited : (26)

References (34)
  • 1
    • 0242333198 scopus 로고    scopus 로고
    • Interaction of design and operational parameters in periodic review kanban systems
    • Akturk S., and Turkcan A. Interaction of design and operational parameters in periodic review kanban systems. International Journal of Production Research 41 14 (2003) 3315-3338
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3315-3338
    • Akturk, S.1    Turkcan, A.2
  • 2
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin R.G., Mitwasi M.G., and Goldberg J.B. Determining the number of kanbans in multi-item just-in-time systems. IIE Transactions 25 1 (1993) 89-98
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 89-98
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 4
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley B.J. A review of the kanban production control research literature. Production and Operations Management 1 4 (1992) 393-411
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic Kanban system
    • Bitran G., and Chang L. A mathematical programming approach to a deterministic Kanban system. Management Science 33 4 (1987) 427-441
    • (1987) Management Science , vol.33 , Issue.4 , pp. 427-441
    • Bitran, G.1    Chang, L.2
  • 6
    • 0002344815 scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • Chaturvedi M., and Golhar D.Y. Simulation modelling and analysis of a JIT production system. Production Planning and Control 3 1 (1992) 81-92
    • (1992) Production Planning and Control , vol.3 , Issue.1 , pp. 81-92
    • Chaturvedi, M.1    Golhar, D.Y.2
  • 7
    • 84952069559 scopus 로고
    • Some implementation experiences with just-in-time manufacturing
    • Cheng T.C.E., and Musaphir H. Some implementation experiences with just-in-time manufacturing. Production Planning and Control 4 2 (1993) 181-192
    • (1993) Production Planning and Control , vol.4 , Issue.2 , pp. 181-192
    • Cheng, T.C.E.1    Musaphir, H.2
  • 8
    • 0039338851 scopus 로고
    • Achieving rigid flexibility: Factory focus for 1990s
    • Collins R.S., and Schmenner R. Achieving rigid flexibility: Factory focus for 1990s. European Management Journal 11 4 (1993) 443-447
    • (1993) European Management Journal , vol.11 , Issue.4 , pp. 443-447
    • Collins, R.S.1    Schmenner, R.2
  • 9
    • 0034250796 scopus 로고    scopus 로고
    • Toward a taxonomy of manufacturing flexibility dimensions
    • D'Souza D.E., and Williams F.P. Toward a taxonomy of manufacturing flexibility dimensions. Journal of Operations Management 18 (2000) 577-593
    • (2000) Journal of Operations Management , vol.18 , pp. 577-593
    • D'Souza, D.E.1    Williams, F.P.2
  • 10
    • 0242333198 scopus 로고    scopus 로고
    • Interaction of design and operational parameters in periodic review kanban systems
    • Erhun F., Aktürk M.S., and Turkcan A. Interaction of design and operational parameters in periodic review kanban systems. International Journal of Production Research 41 14 (2003) 3315-3338
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3315-3338
    • Erhun, F.1    Aktürk, M.S.2    Turkcan, A.3
  • 11
    • 33748751515 scopus 로고    scopus 로고
    • Framinan, J.M., González, P.L., Ruiz-Usano R., 2005. Dynamic card controlling in a Conwip system. International Journal of Production Economics. Available online 29 January 20050, in press.
  • 12
    • 0027580682 scopus 로고
    • Manufacturing flexibility: A strategic perspective
    • Gerwin D. Manufacturing flexibility: A strategic perspective. Management Science 39 4 (1993) 395-408
    • (1993) Management Science , vol.39 , Issue.4 , pp. 395-408
    • Gerwin, D.1
  • 15
    • 0031124846 scopus 로고    scopus 로고
    • JIT manufacturing: The evolution to an implementation model founded in current practice
    • Hallihan A., Sackett P., and Williams G.M. JIT manufacturing: The evolution to an implementation model founded in current practice. International Journal of Production Research 35 4 (1997) 901-920
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 901-920
    • Hallihan, A.1    Sackett, P.2    Williams, G.M.3
  • 16
    • 0034691895 scopus 로고    scopus 로고
    • Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops-Part 1
    • Hemamalini B., and Chandrasekharan R. Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops-Part 1. International Journal of Production Research 38 11 (2000) 2529-2548
    • (2000) International Journal of Production Research , vol.38 , Issue.11 , pp. 2529-2548
    • Hemamalini, B.1    Chandrasekharan, R.2
  • 17
    • 0034691907 scopus 로고    scopus 로고
    • Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops-Part 2
    • Hemamalini B., and Chandrasekharan R. Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops-Part 2. International Journal of Production Research 38 11 (2000) 2549-2572
    • (2000) International Journal of Production Research , vol.38 , Issue.11 , pp. 2549-2572
    • Hemamalini, B.1    Chandrasekharan, R.2
  • 18
    • 0345146716 scopus 로고
    • Just-in-time manufacturing systems: A literature review
    • Keller A.Z., and Kazazi A. Just-in-time manufacturing systems: A literature review. Industrial Management and Data Systems 93 7 (1993) 1-32
    • (1993) Industrial Management and Data Systems , vol.93 , Issue.7 , pp. 1-32
    • Keller, A.Z.1    Kazazi, A.2
  • 19
    • 0029544330 scopus 로고    scopus 로고
    • Liberopoulos, G., Dallery, Y., 1995. On the optimization of a single-stage generalized Kanban control system in manufacturing. Proceeding of the INRIA/IEEE Symposium on emerging technologies and factory Automation, Paris, France, October 10-13, pp. 437-444.
  • 20
    • 0012406164 scopus 로고    scopus 로고
    • Kanban setting through artificial intelligence: A comparative study of artificial neural networks and decision trees
    • Markham I.S., Mathieu R.G., and Wray B.A. Kanban setting through artificial intelligence: A comparative study of artificial neural networks and decision trees. Integrated Manufacturing Systems 11 4 (2000) 239-246
    • (2000) Integrated Manufacturing Systems , vol.11 , Issue.4 , pp. 239-246
    • Markham, I.S.1    Mathieu, R.G.2    Wray, B.A.3
  • 23
    • 84951548178 scopus 로고
    • Making manufacturing flexibility operational-part 1: a framework
    • Nilsson C.H., and Nordahl H. Making manufacturing flexibility operational-part 1: a framework. Integrated Manufacturing Systems 6 1 (1995) 5-11
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.1 , pp. 5-11
    • Nilsson, C.H.1    Nordahl, H.2
  • 24
    • 29144444501 scopus 로고
    • 'Making manufacturing flexibility operational-part 2: distinctions and an example
    • Nilsson C.H., and Nordahl H. 'Making manufacturing flexibility operational-part 2: distinctions and an example. Integrated Manufacturing Systems 6 2 (1995) 4-10
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.2 , pp. 4-10
    • Nilsson, C.H.1    Nordahl, H.2
  • 25
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of kanbans, container sizes and the final-assembly sequence of products in a just-in-time shop
    • Philipoom P.R., Rees P., and Taylor III B.W. Simultaneously determining the number of kanbans, container sizes and the final-assembly sequence of products in a just-in-time shop. International Journal of Production Research 34 (1996) 51-69
    • (1996) International Journal of Production Research , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, P.2    Taylor III, B.W.3
  • 26
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
    • Rees L.P., Philipoom P.R., Taylor B.W., and Huang P.Y. Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime. IIE Transactions 19 (1987) 199-207
    • (1987) IIE Transactions , vol.19 , pp. 199-207
    • Rees, L.P.1    Philipoom, P.R.2    Taylor, B.W.3    Huang, P.Y.4
  • 27
    • 0035283562 scopus 로고    scopus 로고
    • An international comparison of the effect of manufacturing strategy-implementation gap on business performance
    • Rho B., Park K., and Yu Y. An international comparison of the effect of manufacturing strategy-implementation gap on business performance. International Journal of Production Research 70 (2001) 89-97
    • (2001) International Journal of Production Research , vol.70 , pp. 89-97
    • Rho, B.1    Park, K.2    Yu, Y.3
  • 28
    • 3543053535 scopus 로고    scopus 로고
    • Simulation analysis of maintenance policies in just-in-time production Systems
    • Savsar M. Simulation analysis of maintenance policies in just-in-time production Systems. International Journal of Operations and Production Management 17 3 (1997) 256-266
    • (1997) International Journal of Operations and Production Management , vol.17 , Issue.3 , pp. 256-266
    • Savsar, M.1
  • 31
    • 3543080533 scopus 로고    scopus 로고
    • Manufacturing paradigms versus strategic approaches: A misleading contrast
    • Spina G. Manufacturing paradigms versus strategic approaches: A misleading contrast. International Journal of Operations & Production Management 18 8 (1998) 684-709
    • (1998) International Journal of Operations & Production Management , vol.18 , Issue.8 , pp. 684-709
    • Spina, G.1
  • 33
    • 3943049520 scopus 로고
    • Determining the number of Kanbans: A step towards non-stock-production
    • Wang I., and Wang T. Determining the number of Kanbans: A step towards non-stock-production. International Journal of Production Research 28 11 (1990) 2101-2115
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 2101-2115
    • Wang, I.1    Wang, T.2
  • 34
    • 0032156511 scopus 로고    scopus 로고
    • Customer-order-driven production: An economical concept for responding to demand uncertainty?
    • Zäpfel G. Customer-order-driven production: An economical concept for responding to demand uncertainty?. International Journal of Production Economics 56-57 (1998) 699-709
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 699-709
    • Zäpfel, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.