메뉴 건너뛰기




Volumn 34, Issue 1, 1996, Pages 51-69

Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONTAINERS; COST EFFECTIVENESS; OPTIMIZATION; PRODUCTION; SCHEDULING;

EID: 0029734386     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904891     Document Type: Article
Times cited : (19)

References (21)
  • 1
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multiproduct, multistage production system
    • Bard, J. E., and Golany, B., 1991, Determining the number of kanbans in a multiproduct, multistage production system. International Journal of Production Research, 29 (5), 881.
    • (1991) International Journal of Production Research , vol.29 , Issue.5 , pp. 881
    • Bard, J.E.1    Golany, B.2
  • 2
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J., 1992, A review of the kanban production control research literature. Production and Operations Management, 1 (4), 393.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393
    • Berkley, B.J.1
  • 3
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in kanban systems
    • Berkley, B.J. 1993, Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 24 (1), 218.
    • (1993) Decision Sciences , vol.24 , Issue.1 , pp. 218
    • Berkley, B.J.1
  • 4
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban-controlled flow shop
    • Berkley, B. J., and Kiran, S., 1991, A simulation study of sequencing rules in a kanban-controlled flow shop. Decision Sciences. 22 (3), 559.
    • (1991) Decision Sciences , vol.22 , Issue.3 , pp. 559
    • Berkley, B.J.1    Kiran, S.2
  • 5
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran, R., and Chang, L., 1987, A mathematical programming approach to a deterministic kanban system. Management Science, 33, 427.
    • (1987) Management Science , vol.33 , pp. 427
    • Bitran, R.1    Chang, L.2
  • 6
    • 0000326705 scopus 로고
    • A dynamic programming approach to a lot size scheduling problem
    • Bomberger, E., 1966, A dynamic programming approach to a lot size scheduling problem. Management Science, 12, 778.
    • (1966) Management Science , vol.12 , pp. 778
    • Bomberger, E.1
  • 7
    • 0023345352 scopus 로고
    • Configuring a kanban system using a discrete optimization of multiple stochastic responses
    • Davis, W. J., and Stubjtz, S. J., 1987, Configuring a kanban system using a discrete optimization of multiple stochastic responses. International Journal of Production Research, 25 (5), 721.
    • (1987) International Journal of Production Research , vol.25 , Issue.5 , pp. 721
    • Davis, W.J.1    Stubjtz, S.J.2
  • 8
    • 0023420909 scopus 로고
    • The economic lot scheduling problem: Achieving feasiblity using time-varying lot sizes
    • Dobson, G., 1987, The economic lot scheduling problem: achieving feasiblity using time-varying lot sizes. Operations Research, 35 (5), 764.
    • (1987) Operations Research , vol.35 , Issue.5 , pp. 764
    • Dobson, G.1
  • 9
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • Elmaghraby, S. E., 1978, The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24, 587.
    • (1978) Management Science , vol.24 , pp. 587
    • Elmaghraby, S.E.1
  • 10
    • 0024607145 scopus 로고
    • A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system
    • Gupta, Y. P., and Gupta, M. C., 1989, A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system. International Journal of Production Research, 27 (2), 309.
    • (1989) International Journal of Production Research , vol.27 , Issue.2 , pp. 309
    • Gupta, Y.P.1    Gupta, M.C.2
  • 11
    • 0018724120 scopus 로고
    • An improved extended basic period procedure for solving the economic lot scheduling problem
    • Haessler, R. W., 1979, An improved extended basic period procedure for solving the economic lot scheduling problem. AIIE Transactions, 11, 336.
    • (1979) AIIE Transactions , vol.11 , pp. 336
    • Haessler, R.W.1
  • 12
    • 0004102424 scopus 로고
    • (Homewood, 1L: Dow Jones-Irwin)
    • Hall, R. W., 1983, Zero Inventories (Homewood, 1L: Dow Jones-Irwin).
    • (1983) Zero Inventories
    • Hall, R.W.1
  • 13
    • 0010908890 scopus 로고
    • Working paper QM8612, Graduate School of Management, University of Rochester, Rochester, NY, USA
    • Karmakar, U. S., 1986, Kanban systems. Working paper QM8612, Graduate School of Management, University of Rochester, Rochester, NY, USA.
    • (1986) Kanban Systems
    • Karmakar, U.S.1
  • 15
    • 0025894459 scopus 로고
    • A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
    • Li, A., and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29 (1), 1.
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 1
    • Li, A.1    Co, H.C.2
  • 16
    • 84985779120 scopus 로고
    • An appropriate solution to deterministic kanban systems
    • Moeeni, F., and Chang, Y., 1990, An appropriate solution to deterministic kanban systems. Decision Sciences, 21 (3), 596.
    • (1990) Decision Sciences , vol.21 , Issue.3 , pp. 596
    • Moeeni, F.1    Chang, Y.2
  • 17
    • 0003449926 scopus 로고
    • Norcross, GA: Industrial Engineering and Management Press)
    • Monden, Y., 1983, Toyota Production System (Norcross, GA: Industrial Engineering and Management Press).
    • (1983) Toyota Production System
    • Monden, Y.1
  • 18
    • 84985748301 scopus 로고
    • Solving the economic lot-scheduling problem using the method of prime subperiods
    • Philipoom, P. R., Rees, L. P., and Taylor, H. B. W., 1989, Solving the economic lot-scheduling problem using the method of prime subperiods. Decision Sciences, 20, 794.
    • (1989) Decision Sciences , vol.20 , pp. 794
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, H.B.W.3
  • 19
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
    • Philipoom, P. R., Rees, L. P., Taylor, H. B. W., and Huang, P. Y„ 1987, An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans. International Journal of Production Research, 25 (3), 457.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, H.B.W.3    Huang, P.Y.4
  • 20
    • 84985817984 scopus 로고
    • A joint-sizing rule for fixed labor-cost situations
    • Pinto, P. A., and Mabert, V. A., 1986, A joint-sizing rule for fixed labor-cost situations. Decision Sciences, 17, 139.
    • (1986) Decision Sciences , vol.17 , pp. 139
    • Pinto, P.A.1    Mabert, V.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.