메뉴 건너뛰기




Volumn 9, Issue 3, 1996, Pages 169-189

Overview of kanban systems

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0000262401     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/095119296131643     Document Type: Article
Times cited : (75)

References (98)
  • 2
    • 0000293722 scopus 로고
    • Notes: Installation vs. Echelon stock policies for multilevel inventory control
    • AxsAter, S., and ROSLING, D., 1993, Notes: installation vs. echelon stock policies for multilevel inventory control. Management Science, 39, 1274-1280.
    • (1993) Management Science , vol.39 , pp. 1274-1280
    • Axsater, S.1    Rosling, D.2
  • 3
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multi-product, multistage production system
    • BARD, J.F., and GOLANY, B., 1991, Determining the number of kanbans in a multi-product, multistage production system. International Journal of Production Research, 29, 881-895.
    • (1991) International Journal of Production Research , vol.29 , pp. 881-895
    • Bard, J.F.1    Golany, B.2
  • 4
    • 21544433687 scopus 로고
    • Working Paper, Department of Decision Sciences, School of Business Administration, University of Southern California, Los Angels, CA
    • BERKLEY, B.J., 1987, Stochastic kanban-controlled lines and tandem queues. Working Paper, Department of Decision Sciences, School of Business Administration, University of Southern California, Los Angels, CA.
    • (1987) Stochastic Kanban-Controlled Lines and Tandem Queues.
    • Berkley, B.J.1
  • 5
    • 0027813686 scopus 로고
    • Effect of buffer capacity and sequencing rules on single-card kanban system performance
    • BERKLEY, B.J., 1993, Effect of buffer capacity and sequencing rules on single-card kanban system performance. International Journal of Production Research, 31, 2875-2894.
    • (1993) International Journal of Production Research , vol.31 , pp. 2875-2894
    • Berkley, B.J.1
  • 6
    • 21544444027 scopus 로고
    • Working paper, No. 163585, Sloan School ofManagement, Massachusetts Institute of Technology, Cambridge, MA
    • BITRAN, G.R., and CHANG, L., 1985, An optimization approach to the kanban system. Working paper, No. 163585, Sloan School ofManagement, Massachusetts Institute of Technology, Cambridge, MA.
    • (1985) An Optimization Approach to the Kanban System.
    • Bitran, G.R.1    Chang, L.2
  • 7
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • BITRAN, G.R., and CHANG, L., 1987, A mathematical programming approach to a deterministic kanban system. Management Science, 33, 427-441.
    • (1987) Management Science , vol.33 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 8
    • 21544442494 scopus 로고
    • Design a kanban manufacturing system using the server network generator (SNG) CASE tool
    • and
    • BOUCHENTOUF-IDRISS, A., and ZEIDNER, L., 1991, Design a kanban manufacturing system using the server network generator (SNG) CASE tool. APL Quote QUAD, (21), 62-70.
    • (1991) APL Quote QUAD , Issue.21 , pp. 62-70
    • Bouchentouf-Idriss, A.1    Zeidner, L.2
  • 11
    • 33746011471 scopus 로고
    • Determining the number of kanbans and lot sizes in a generic kanban systems: A simulated annealing approach
    • CHANG, T.M., and YIH, Y., 1994b, Determining the number of kanbans and lot sizes in a generic kanban systems: a simulated annealing approach. International Journal of Production Research, 32, 1991-2004.
    • (1994) International Journal of Production Research , vol.32 , pp. 1991-2004
    • Chang, T.M.1    Yih, Y.2
  • 14
    • 0027681864 scopus 로고
    • Concavity of system throughput and information transfer in a PAC system
    • CHENG, D.W., 1993, Concavity of system throughput and information transfer in a PAC system. Operations Research Letters, 14, 143-146.
    • (1993) Operations Research Letters , vol.14 , pp. 143-146
    • Cheng, D.W.1
  • 16
    • 0023345352 scopus 로고
    • Configuring a kanban system using a discrete optimization of multiple stochastic responses
    • DAVIS, W.J., and STUBITZ, S.J., 1987, Configuring a kanban system using a discrete optimization of multiple stochastic responses. International Journal of Production Research, 25, 721-740.
    • (1987) International Journal of Production Research , vol.25 , pp. 721-740
    • Davis, W.J.1    Stubitz, S.J.2
  • 21
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • ELMAGHRABY, S.E., 1978, The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24, 587-598.
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 22
    • 0022673843 scopus 로고
    • An examination of just-intime management for the small manufacturing: With anillustration
    • FINCH, B.J., and cox, J.F., 1986, An examination of just-intime management for the small manufacturing: with anillustration. International Journal of Production Research, 24, 329-342.
    • (1986) International Journal of Production Research , vol.24 , pp. 329-342
    • Finch, B.J.1    Cox, J.F.2
  • 23
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric early and tardiness penalties
    • GAREY, M., TARJAN, R., and WILFONG, G., 1988, One-processor scheduling with symmetric early and tardiness penalties. Mathematics Operations Research, 13, 330-344.
    • (1988) Mathematics Operations Research , vol.13 , pp. 330-344
    • Garey, M.1    Tarjan, R.2    Wilfong, G.3
  • 25
    • 0026938171 scopus 로고
    • Comparing trigger and kanban control of flow-line manufacture
    • Graham, I., 1992, Comparing trigger and kanban control of flow-line manufacture. International Journal of Production Research, 30, 2351-2362.
    • (1992) International Journal of Production Research , vol.30 , pp. 2351-2362
    • Graham, I.1
  • 29
    • 0024607145 scopus 로고
    • A system dynamics model for a multi-stage-line dual-card JIT kanban system
    • GUPTA, Y.P., and Gupta, M.C., 1989b, A system dynamics model for a multi-stage-line dual-card JIT kanban system. International Journal of Production Research, 27, 309-352.
    • (1989) International Journal of Production Research , vol.27 , pp. 309-352
    • Gupta, Y.P.1    Gupta, M.C.2
  • 30
    • 21544474020 scopus 로고
    • An empirical examination of the characteristics of JIT manufacturers versus non-JIT manufacturers
    • Gupta, Y.P., Mangold, W.G., and Lonial, S.C., 1991, An empirical examination of the characteristics of JIT manufacturers versus non-JIT manufacturers. Manufacturing Review, 4, 78-86.
    • (1991) Manufacturing Review , vol.4 , pp. 78-86
    • Gupta, Y.P.1    Mangold, W.G.2    Lonial, S.C.3
  • 32
    • 0004102426 scopus 로고
    • (Dow-Jones-Irwin, Homewood, IL)
    • Hall, R.W., 1983, Zero Inventory (Dow-Jones-Irwin, Homewood, IL).
    • (1983) Zero Inventory
    • Hall, R.W.1
  • 35
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese JIT techniques (With kanban) for multiline, multistage production systems
    • HUANG, P.Y., REES, L.P., and TAYLOR III, B.W., 1983, A simulation analysis of the Japanese JIT techniques (with kanban) for multiline, multistage production systems. Decision Sciences, 14, 326-344.
    • (1983) Decision Sciences , vol.14 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor Iii, B.W.3
  • 36
    • 21544466330 scopus 로고
    • An example of CIM in Nippondenso Kota plant
    • ICHIHASHI, E., 1990, An example of CIM in Nippondenso Kota plant. System Control and Information, 34, 185-187.
    • (1990) System Control and Information , vol.34 , pp. 185-187
    • Ichihashi, E.1
  • 37
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • INMAN, R., and BULFIN, R., 1991, Sequencing JIT mixed-model assembly lines. Management Science, 37, 192-207.
    • (1991) Management Science , vol.37 , pp. 192-207
    • Inman, R.1    Bulfin, R.2
  • 38
    • 0003605408 scopus 로고
    • (Productivity Press, Stamfort, CT)
    • JAPANESE MANAGEMENT ASSOCIATION, 1986, Kanban: Just-intime at Toyota (Productivity Press, Stamfort, CT).
    • (1986) Kanban: Just-Intime at Toyota
  • 39
    • 84985818194 scopus 로고
    • Analysis and approximation of aJIT production line
    • JORDAN, S., 1988, Analysis and approximation of aJIT production line. Decision Sciences, 19, 672-681.
    • (1988) Decision Sciences , vol.19 , pp. 672-681
    • Jordan, S.1
  • 40
    • 38249015371 scopus 로고
    • Determination of optimal number of kanban using stochastic Petric Nets
    • JOTHISHANKAR, M.C., and WANG H.P., 1992, Determination of optimal number of kanban using stochastic Petric Nets. Journal of Manufacturing Systems, 11, 449-461.
    • (1992) Journal of Manufacturing Systems , vol.11 , pp. 449-461
    • Jothishankar, M.C.1    Wang, H.P.2
  • 43
    • 0022062163 scopus 로고
    • Just-in-time manufacturing system: A periodic pull system
    • KIM TAE-MOON, 1985, Just-in-time manufacturing system: a periodic pull system. International Journal of Production Research, 23, 553-562.
    • (1985) International Journal of Production Research , vol.23 , pp. 553-562
    • Kim, T.-M.1
  • 44
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multi-stage production control
    • KIMURA, O., and TERADA, H., 1981, Design and analysis of pull system, a method of multi-stage production control. International Journal of Production Research, 19, 241-253.
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 47
    • 21544470560 scopus 로고
    • A note on level schedules for mixed-model assembly lines in just-in-time production system
    • KUBIAK, W., and SETHI, S., 1989, A note on level schedules for mixed-model assembly lines in just-in-time production system. Management Science, 37, 901-904.
    • (1989) Management Science , vol.37 , pp. 901-904
    • Kubiak, W.1    Sethi, S.2
  • 48
    • 0025894459 scopus 로고
    • A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
    • LI, A., and CO, H.C., 1991, A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29, 1-16.
    • (1991) International Journal of Production Research , vol.29 , pp. 1-16
    • Li, A.1    Co, H.C.2
  • 50
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production system
    • MILTENBURG, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production system. Management Science, 32, 121-122.
    • (1989) Management Science , vol.32 , pp. 121-122
    • Miltenburg, J.1
  • 51
    • 0024731470 scopus 로고
    • Scheduling mixed-model, multilevel assembly lines in just-in-time production system
    • MILTENBURG, J., and SINNAMON, G., 1989, Scheduling mixed-model, multilevel assembly lines in just-in-time production system. International Journal of Production Research, 27, 1487-1510.
    • (1989) International Journal of Production Research , vol.27 , pp. 1487-1510
    • Miltenburg, J.1    Sinnamon, G.2
  • 52
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines
    • MITRA, D., and MITRANI, T., 1990, Analysis of a kanban discipline for cell coordination in production lines. Management Science, 36, 1548-1566.
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, T.2
  • 53
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines. II. Stochastic demands
    • MITRA, D., and MITRANI, I., 1991, Analysis of a kanban discipline for cell coordination in production lines. II. Stochastic demands. Operations Research, 39, 807-823.
    • (1991) Operations Research , vol.39 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 54
  • 55
    • 0003091893 scopus 로고
    • What makes the Toyota production system really tick
    • MONDEN, W., 1981a, What makes the Toyota production system really tick. Industrial Engineering, 13, 36-46.
    • (1981) Industrial Engineering , vol.13 , pp. 36-46
    • Monden, W.1
  • 56
    • 16744364386 scopus 로고
    • Adaptable kanban system helps Toyota maintain just-in-time production
    • MONDEN, Y., 1981b, Adaptable kanban system helps Toyota maintain just-in-time production. Industrial Engineering, 13 (5), 29-46.
    • (1981) Industrial Engineering , vol.13 , Issue.5 , pp. 29-46
    • Monden, Y.1
  • 58
    • 0346127622 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA)
    • MONDEN, Y., 1983b, Applying Just In Time (Industrial Engineering and Management Press, Norcross, GA).
    • (1983) Applying Just in Time
    • Monden, Y.1
  • 65
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
    • Philipoom, P.R., Rees, L.P., Taylor III B.W., and Huang, P.Y., 1987, An investigation of the factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans. International Journal of Production Research, 25, 457-472.
    • (1987) International Journal of Production Research , vol.25 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 67
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
    • REES, L.P., HUANG, P.Y., and TAYLOR III, B.W., 1989, A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. International Journal of Production Research, 27, 1427-1443.
    • (1989) International Journal of Production Research , vol.27 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 68
    • 0023365980 scopus 로고
    • Dynamically adjusting the kanbans in a just-intime production system using estimated values of lead time
    • REES, L.P., PHILIPOOM, P.R., TAYLOR III B.W., and HUANG, P.Y., 1987, Dynamically adjusting the kanbans in a just-intime production system using estimated values of lead time. IIE Transactions, 19, 199-137.
    • (1987) IIE Transactions , vol.19 , pp. 137-199
    • Rees, L.P.1    Philipoom, P.R.2    Taylor, B.W.3    Huang, P.Y.4
  • 69
    • 0024865074 scopus 로고
    • Simulation a just-in-time production system
    • SARKER, B.R., 1989, Simulation a just-in-time production system. Computers and Industrial Engineering, 16, 127-137.
    • (1989) Computers and Industrial Engineering , vol.16 , pp. 127-137
    • Sarker, B.R.1
  • 70
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • SARKER, B.R., and FITZSIMMONS, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27,1715-1731.
    • (1989) International Journal of Production Research , vol.27 , pp. 1715-1731
    • Sarker, B.R.1    Fitzsimmons, J.A.2
  • 71
    • 0023859422 scopus 로고
    • The effect of imbalance in a just-in-time production system: A simulation study
    • SARKER, B.R., and HARRIS, R.D., 1988, The effect of imbalance in a just-in-time production system: a simulation study. International Journal of Production Research, 26, 1-18.
    • (1988) International Journal of Production Research , vol.26 , pp. 1-18
    • Sarker, B.R.1    Harris, R.D.2
  • 73
    • 21544454853 scopus 로고
    • Inventory control in Japanese industry
    • Lee, S. M. and Schwendiman (eds) (Praeger Publishers, New York
    • SCHONBERGER, R.J., 1982b, Inventory control in Japanese industry. In Management by Japanese Systems, Lee, S. M. and Schwendiman (eds) (Praeger Publishers, New York).
    • (1982) Management by Japanese Systems
    • Schonberger, R.J.1
  • 74
    • 0020796417 scopus 로고
    • Application of single-card and dualcard kanban
    • SCHONBERGER, R.J., 1983, Application of single-card and dualcard kanban. Interfaces, 13, 56-67.
    • (1983) Interfaces , vol.13 , pp. 56-67
    • Schonberger, R.J.1
  • 79
    • 0028405569 scopus 로고
    • The pull production system: Modeling and characteristics
    • SIHA, S., 1994, The pull production system: modeling and characteristics. International Journal of Production Research, 32, 933-950.
    • (1994) International Journal of Production Research , vol.32 , pp. 933-950
    • Siha, S.1
  • 87
    • 0000996514 scopus 로고
    • Customer service in pull production systems
    • SPEARMAN, M.L., 1992, Customer service in pull production systems. Operations Research, 40, 948-958.
    • (1992) Operations Research , vol.40 , pp. 948-958
    • Spearman, M.L.1
  • 88
    • 0017557653 scopus 로고
    • Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system
    • Sugimore, y., Kusunoki, K., Cho, F., and Uchikawa U, 1977, Toyota production system and kanban system: materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15, 553-564.
    • (1977) International Journal of Production Research , vol.15 , pp. 553-564
    • Sugimore, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, U.4
  • 90
    • 0027696153 scopus 로고
    • Tructural properties and a heuristic for kanban-controlled serial lines
    • TAYUR, S.R., 1993, Structural properties and a heuristic for kanban-controlled serial lines. Management Science, 39, 1347-1368.
    • (1993) Management Science , vol.39 , pp. 1347-1368
    • Tayur, S.R.1
  • 91
    • 0025488637 scopus 로고
    • Modeling kanban-based demand-pull systems: A survey and critique
    • UZSOY, R., and MARTIN-VEGA, L.A., 1990, Modeling kanban-based demand-pull systems: a survey and critique. Manufacturing Review, 3, 155-160.
    • (1990) Manufacturing Review , vol.3 , pp. 155-160
    • Uzsoy, R.1    Martin-Vega, L.A.2
  • 92
    • 0024108248 scopus 로고
    • Increasing the production rate of a just-in-time production system with variable operations times
    • VILLEDA, R., DUDEK, R., and SMITH, M.L., 1988, Increasing the production rate of a just-in-time production system with variable operations times. International Journal of Production Research, 26, 1749-1768.
    • (1988) International Journal of Production Research , vol.26 , pp. 1749-1768
    • Villeda, R.1    Dudek, R.2    Smith, M.L.3
  • 93
    • 3943049520 scopus 로고
    • Determining the number of Kanbans: A step toward non-stock-production
    • WANG, H., and WANG, H.P., 1990, Determining the number of Kanbans: a step toward non-stock-production. International Journal of Production Research, 28, 2101-2115.
    • (1990) International Journal of Production Research , vol.28 , pp. 2101-2115
    • Wang, H.1    Wang, H.P.2
  • 94
    • 0028333240 scopus 로고
    • An optimal operation planning for the ® xed quantity withdrawal kanban system with variable lead times
    • YANAGAWA, Y., MIYAZAKI, S., and OHTA, H., 1994a, An optimal operation planning for the ® xed quantity withdrawal kanban system with variable lead times. International Journal of Production Economics, 33, 163-168.
    • (1994) International Journal of Production Economics , vol.33 , pp. 163-168
    • Yanagawa, Y.1    Miyazaki, S.2    Ohta, H.3
  • 95
    • 0041365053 scopus 로고
    • The optimal operation planning of a Kanban system with variable lead times
    • YANAGAWA, Y., MIYAZAKI, S., and OHTA, H., 1994b, The optimal operation planning of a Kanban system with variable lead times. Production Planning & Control, 5, 21-29.
    • (1994) Production Planning & Control , vol.5 , pp. 21-29
    • Yanagawa, Y.1    Miyazaki, S.2    Ohta, H.3
  • 96
    • 0001071723 scopus 로고
    • A kanban-based simulation study of a mixed model just-in-time manufacturing line
    • YAVUZ, I.H., and SATIR, A., 1995a, A kanban-based simulation study of a mixed model just-in-time manufacturing line. International Journal of Production Research, 33, 1027-1048.
    • (1995) International Journal of Production Research , vol.33 , pp. 1027-1048
    • Yavuz, I.H.1    Satir, A.2
  • 97
    • 0029345973 scopus 로고
    • Kanban-based operational planning and control: Simulation modeling
    • YAVUZ, I.H., and SATIR, A., 1995b, Kanban-based operational planning and control: simulation modeling. Production Planning & Control, 6, 331-344.
    • (1995) Production Planning & Control , vol.6 , pp. 331-344
    • Yavuz, I.H.1    Satir, A.2
  • 98
    • 0002144959 scopus 로고
    • Computing optimal lot sizes in the economic lot scheduling problem
    • ZIPKIN, P.H., 1991, Computing optimal lot sizes in the economic lot scheduling problem. Operations Research, 39, 56-63.
    • (1991) Operations Research , vol.39 , pp. 56-63
    • Zipkin, P.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.