메뉴 건너뛰기




Volumn 11, Issue 2, 2004, Pages 151-160

Design and development of a prototype distributed simulation for evaluation of supply chains

Author keywords

Distributed simulation; IDEF; Simulation; Supply chain

Indexed keywords

COMPUTER AIDED SOFTWARE ENGINEERING; COMPUTER SIMULATION; COMPUTER SIMULATION LANGUAGES; COMPUTER SOFTWARE REUSABILITY; DISTRIBUTED COMPUTER SYSTEMS; FINITE AUTOMATA; INTERFACES (COMPUTER); INTERNET; PERFORMANCE; TIME AND MOTION STUDY;

EID: 3142733812     PISSN: 10724761     EISSN: 1943670X     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (25)

References (7)
  • 2
    • 0002661275 scopus 로고
    • Activity-based systems: Measuring the costs of resource usage
    • September
    • Cooper, R., and Kaplan, R. S. (1992). Activity-based systems: measuring the costs of resource usage. Accounting Horizons, September, pp. 1-13.
    • (1992) Accounting Horizons , pp. 1-13
    • Cooper, R.1    Kaplan, R.S.2
  • 3
    • 0000726609 scopus 로고    scopus 로고
    • Time management in the high level architecture
    • Fujimoto, R. M. (1998). Time management in the High Level Architecture. Simulation, 76:6, pp. 388-400.
    • (1998) Simulation , vol.76 , Issue.6 , pp. 388-400
    • Fujimoto, R.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.