-
1
-
-
0002436324
-
MRP, JIT, OPT, FMS: Making sense of production operations systems
-
Aggarwal, S. C., 1985, MRP, JIT, OPT, FMS: Making sense of production operations systems, Harvard Business Review, 63, 8- 16.
-
(1985)
Harvard Business Review
, vol.63
-
-
Aggarwal, S.C.1
-
2
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S. D., Miltenburg, G. J. and Wijngaard, J., 1991, Embedding JIT into MRP. InternationalJournal of Production Research, 29(2), 329-341.
-
(1991)
Internationaljournal of Production Research
, vol.29
, Issue.2
, pp. 329-341
-
-
Flapper, S.D.1
Miltenburg, G.J.2
Wijngaard, J.3
-
3
-
-
0004193453
-
-
2nd edn, (Cincinnati, OH: South-Western Publishing)
-
Fogarty, D. W., Blackstone, T. R. and Blackstone, J. H., 1991, Production and Inventory Management, 2nd edn, (Cincinnati, OH: South-Western Publishing).
-
(1991)
Production and Inventory Management
-
-
Fogarty, D.W.1
Blackstone, T.R.2
Blackstone, J.H.3
-
4
-
-
0002675248
-
MRP, Kanban or OPT: What’s best?
-
January- February
-
Fox, R. E., 1982, MRP, Kanban or OPT: what’s best? Inventories and Production, January- February.
-
(1982)
Inventories and Production
-
-
Fox, R.E.1
-
5
-
-
0000372287
-
An Analysis and Discussion of the Optimized Production Technology Software and Its u se
-
Fry, T. D., Cox, J. F. and Blackstone, J. H., An Analysis and Discussion of the Optimized Production Technology Software and Its u se. Production and Operations Management, 1(2), 229-242.
-
Production and Operations Management
, vol.1
, Issue.2
, pp. 229-242
-
-
Fry, T.D.1
Cox, J.F.2
Blackstone, J.H.3
-
6
-
-
0019544056
-
Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
-
Gershwin, S. B., and Berman, O., 1981, Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers. IIE Transactions, 13(1), 2-11.
-
(1981)
IIE Transactions
, vol.13
, Issue.1
, pp. 2-11
-
-
Gershwin, S.B.1
Berman, O.2
-
8
-
-
0024607567
-
A framework for quantitative comparison of production control concepts
-
Grunwald, H., Striekwold, P. E. and Weeda, P. J., 1989, A framework for quantitative comparison of production control concepts. International Journal of Production Research, 27(2), 281-292.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.2
, pp. 281-292
-
-
Grunwald, H.1
Striekwold, P.E.2
Weeda, P.J.3
-
9
-
-
0004102424
-
-
Homewood, IL: Dow Jones-Irwin)
-
Hall, R. W., 1983, Zero Inventories, (Homewood, IL: Dow Jones-Irwin).
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
10
-
-
0020822392
-
The OPT scheduling system: A review of a new production scheduling system
-
Jacobs, F. R., 1983, The OPT scheduling system: a review of a new production scheduling system. Production and Inventory Management, 24(3), 47-51.
-
(1983)
Production and Inventory Management
, vol.24
, Issue.3
, pp. 47-51
-
-
Jacobs, F.R.1
-
11
-
-
84909778354
-
OPT uncovered: Many production planning and scheduling concepts can be applied with or without the software
-
October
-
Jacobs, F. R., 1984, OPT uncovered: many production planning and scheduling concepts can be applied with or without the software. Industrial Engineering, October, 89-95.
-
(1984)
Industrial Engineering
, pp. 89-95
-
-
Jacobs, F.R.1
-
13
-
-
0026205378
-
Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques
-
Lockamy, A. and Cox, J. F., Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques. International Journal of Production Research, 29(8), 1661 - 1672.
-
International Journal of Production Research
, vol.29
, Issue.8
-
-
Lockamy, A.1
Cox, J.F.2
-
14
-
-
0023568653
-
Variance of the number of units produced on a transfer line with buffer inventories during a period of length T
-
Miltenburg, G. J., 1987, Variance of the number of units produced on a transfer line with buffer inventories during a period of length T. Naval Research Logistics, 34, 811-822.
-
(1987)
Naval Research Logistics
, vol.34
, pp. 811-822
-
-
Miltenburg, G.J.1
-
15
-
-
0027850506
-
On the equivalence of JIT and MRP as technologies for reducing wastes in manufacturing
-
Miltenburg, G. J., 1993, On the equivalence of JIT and MRP as technologies for reducing wastes in manufacturing. Naval Research Logistics, 40, 905-924.
-
(1993)
Naval Research Logistics
, vol.40
, pp. 905-924
-
-
Miltenburg, G.J.1
-
16
-
-
0024731470
-
Scheduling mixed-model, multi-level just-in-time production systems
-
Miltenburg, G. J. and Sinnamon, G., 1989, Scheduling mixed-model, multi-level just-in-time production systems. InternationalJournal of Production Research, 27(9), 1487-1509.
-
(1989)
Internationaljournal of Production Research
, vol.27
, Issue.9
, pp. 1487-1509
-
-
Miltenburg, G.J.1
Sinnamon, G.2
-
17
-
-
0003449926
-
-
2nd Edn, (Atlanta, GA: Industrial Engineering and Management Press
-
Monden, Y., 1993, Toyota Production System, 2nd Edn, (Atlanta, GA: Industrial Engineering and Management Press) 1993.
-
(1993)
Toyota Production System
, pp. 1993
-
-
Monden, Y.1
-
18
-
-
0010843780
-
Push, pull and squeeze shop floor control with computer simulation
-
Ramsay, M. L., Brown, S. and Tabibzadeh, K., 1990, Push, pull and squeeze shop floor control with computer simulation. Industrial Engineering, 22(2), 39-45.
-
(1990)
Industrial Engineering
, vol.22
, Issue.2
, pp. 39-45
-
-
Ramsay, M.L.1
Brown, S.2
Tabibzadeh, K.3
-
19
-
-
0009058971
-
Materials Requirements Planning and Theory of Constraints: Can They Coexist? A Case Study
-
Reimer, G., 1991, Materials Requirements Planning and Theory of Constraints: Can They Coexist? A Case Study. Production and Inventory Management Journal, Q4, 48-52.
-
(1991)
Production and Inventory Management Journal
, vol.Q4
, pp. 48-52
-
-
Reimer, G.1
-
21
-
-
0029328163
-
Optimum production technology (OPT) and the theory of constraints (TOC): Analysis and genealogy
-
Spencer, M. S. and Cox, J. F., 1995, Optimum production technology (OPT) and the theory of constraints (TOC): analysis and genealogy. International Journal of Production Research, 33(6), 1495-1504.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.6
, pp. 1495-1504
-
-
Spencer, M.S.1
Cox, J.F.2
-
22
-
-
0022736152
-
Using MRP for optimized schedules (Emulating OPT)
-
Swann, D., 1986, Using MRP for optimized schedules (emulating OPT). Production and Inventory Management, Q2, 30-37.
-
(1986)
Production and Inventory Management
, vol.Q2
, pp. 30-37
-
-
Swann, D.1
-
24
-
-
0003929853
-
-
3rd edn, (Homewood, IL: Irwin)
-
Vollmann, T. E., Berry, W. L. and Whybark, D. C., 1992, Manufacturing Planning and Control Systems, 3rd edn, (Homewood, IL: Irwin).
-
(1992)
Manufacturing Planning and Control Systems
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
|