메뉴 건너뛰기




Volumn 34, Issue 9, 2002, Pages 803-811

Satisfying due-dates in large multi-factory supply chains

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CALCULATIONS; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; ITERATIVE METHODS; JOB ANALYSIS; MANUFACTURE; MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING;

EID: 0036722537     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1015500822105     Document Type: Article
Times cited : (34)

References (19)
  • 5
    • 0003968859 scopus 로고
    • Heuristic sequencing of single and multiple component jobs
    • Unpublished Ph.D. dissertation, Department of Industrial Management, MIT, Cambridge, MA
    • (1965)
    • Carroll, D.C.1
  • 16
    • 4243960396 scopus 로고    scopus 로고
    • Scheduling on identical parallel machines to minimize maximum lateness
    • Unpublished Masters thesis, Department of Industrial Engineering, North Carolina State University, Raleigh, NC 27695, USA
    • (1999)
    • Pinnow, A.D.1
  • 17
    • 0009695927 scopus 로고    scopus 로고
    • Simultaneous plant and supply chain scheduling
    • Unpublished Ph.D. dissertation, Department of Industrial Engineering, North Carolina State University, Raleigh, NC 27695, USA
    • (2000)
    • Thoney, K.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.