메뉴 건너뛰기




Volumn 32, Issue 10, 2000, Pages 921-929

Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER ARCHITECTURE; DECISION THEORY; HIERARCHICAL SYSTEMS; HIGH LEVEL LANGUAGES; INVENTORY CONTROL; OBJECT ORIENTED PROGRAMMING; REAL TIME SYSTEMS; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0034288107     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170008967450     Document Type: Article
Times cited : (15)

References (19)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E., and Zawack, D., (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391–401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 4
    • 0029328164 scopus 로고
    • Continuous flow models for batch manufacturing a basis for a hierarchical approach
    • Brandimarte, P., Ukovich, W., and Villa, A., (1995) Continuous flow models for batch manufacturing a basis for a hierarchical approach. International Journal of Production Research, 33, 1635–1660.
    • (1995) International Journal of Production Research , vol.33 , pp. 1635-1660
    • Brandimarte, P.1    Ukovich, W.2    Villa, A.3
  • 7
    • 0030574803 scopus 로고    scopus 로고
    • Modeling setup times, process batches and transfer batches using activity network logic
    • Demeulemeester, E. L., and Herroelen, W. S., (1996) Modeling setup times, process batches and transfer batches using activity network logic. European Journal of Operational Research, 89, 355–365.
    • (1996) European Journal of Operational Research , vol.89 , pp. 355-365
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 9
    • 0030121742 scopus 로고    scopus 로고
    • Extending the shifting bottleneck procedure to real-life applications
    • Ivens, P., and Lambrecht, M., (1996) Extending the shifting bottleneck procedure to real-life applications. European Journal of Operational Research, 90, 252–268.
    • (1996) European Journal of Operational Research , vol.90 , pp. 252-268
    • Ivens, P.1    Lambrecht, M.2
  • 10
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V. J., Wu, S. D., and Storer, R. H., (1994) Robustness measures and robust scheduling for job shops. IIE Transactions, 16, 32–43.
    • (1994) IIE Transactions , vol.16 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 13
  • 17
    • 33746103842 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • Pinedo, M., and Singer, M., (1999) A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Research Logistics, 90, 252–268.
    • (1999) Naval Research Logistics , vol.90 , pp. 252-268
    • Pinedo, M.1    Singer, M.2
  • 18
    • 0031483922 scopus 로고    scopus 로고
    • On the design and development of object-oriented scheduling systems
    • Pinedo, M., and Yen, B. P. -C., (1997) On the design and development of object-oriented scheduling systems. Annals of Operations Research, 70, 359–378.
    • (1997) Annals of Operations Research , vol.70 , pp. 359-378
    • Pinedo, M.1    Yen, B.P.C.2
  • 19
    • 0000580617 scopus 로고
    • A price-directed approach to real-time scheduling of manufacturing operations
    • Roundy, R. O., Maxwell, W. L., Herer, Y. T., Tayur, S. R., and Getzler, A. W., (1991) A price-directed approach to real-time scheduling of manufacturing operations. IIE Transaction, 23, 149–160.
    • (1991) IIE Transaction , vol.23 , pp. 149-160
    • Roundy, R.O.1    Maxwell, W.L.2    Herer, Y.T.3    Tayur, S.R.4    Getzler, A.W.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.