메뉴 건너뛰기




Volumn 35, Issue 1, 2003, Pages 29-48

Simulation-based shop floor control: Formal model, model generation and control interface

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER CONTROL SYSTEMS; COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; INTERFACES (COMPUTER); REAL TIME SYSTEMS;

EID: 0037236081     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170304428     Document Type: Article
Times cited : (62)

References (38)
  • 1
    • 0032040777 scopus 로고    scopus 로고
    • A framework and a simulation generator for kanban-controlled manufacturing systems
    • Aytug, H. and Dogan, C. (1998) A framework and a simulation generator for kanban-controlled manufacturing systems. Computers and Industrial Engineering, 34(2), 337-350.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2 , pp. 337-350
    • Aytug, H.1    Dogan, C.2
  • 2
    • 0012501361 scopus 로고
    • Databases and artificial intelligence: Enabling technologies for simulation modeling
    • Swain, J., Goldsmen, D., Wilson, J. and Grain, R. (eds), IEEE, Piscataway, NJ
    • Centeno, M. and Standridge, C. (1992) Databases and artificial intelligence: enabling technologies for simulation modeling. In: Proceedings of the 1992 Winter Simulation Conference, Swain, J., Goldsmen, D., Wilson, J. and Grain, R. (eds), IEEE, Piscataway, NJ, pp. 181-189.
    • (1992) Proceedings of the 1992 Winter Simulation Conference , pp. 181-189
    • Centeno, M.1    Standridge, C.2
  • 3
    • 0002267303 scopus 로고    scopus 로고
    • A Petri-net and entity-relationship diagram-based object-oriented design method for manufacturing systems control
    • Chen, K. and Lu, S. (1997) A Petri-net and entity-relationship diagram-based object-oriented design method for manufacturing systems control. International Journal of Computer Integrated Manufacturing, 10(1-4), 17-28.
    • (1997) International Journal of Computer Integrated Manufacturing , vol.10 , Issue.1-4 , pp. 17-28
    • Chen, K.1    Lu, S.2
  • 4
    • 0002622363 scopus 로고
    • Intelligent workstation controller for computer-integrated manufacturing: Problems and models
    • Cho, H. and Wysk, R. (1995) Intelligent workstation controller for computer-integrated manufacturing: problems and models. Journal of Manufacturing Systems, 14(4), 252-263.
    • (1995) Journal of Manufacturing Systems , vol.14 , Issue.4 , pp. 252-263
    • Cho, H.1    Wysk, R.2
  • 8
    • 0029543165 scopus 로고
    • Simulation as a planning and scheduling tool for flexible manufacturing systems
    • IEEE, Piscataway, NJ
    • Drake, G.R., Smith, J.S. and Peters, B.A. (1995) Simulation as a planning and scheduling tool for flexible manufacturing systems, in Proceedings of the 1995 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 805-812.
    • (1995) Proceedings of the 1995 Winter Simulation Conference , pp. 805-812
    • Drake, G.R.1    Smith, J.S.2    Peters, B.A.3
  • 9
    • 0023345653 scopus 로고
    • An expert manufacturing simulation system
    • Ford, D. and Schroer, B. (1987) An expert manufacturing simulation system. Simulation, 48(5), 193-200.
    • (1987) Simulation , vol.48 , Issue.5 , pp. 193-200
    • Ford, D.1    Schroer, B.2
  • 11
    • 84976839296 scopus 로고
    • English as a very high level language for simulation programming
    • Heidorn, G.E. (1974) English as a very high level language for simulation programming. SIGPLAN Notices, 9, 91-100.
    • (1974) SIGPLAN Notices , vol.9 , pp. 91-100
    • Heidorn, G.E.1
  • 13
    • 0026954528 scopus 로고
    • Specification, modeling and control of a flexible manufacturing cell
    • Huang, H.P. and Chang, P.C. (1992) Specification, modeling and control of a flexible manufacturing cell. International Journal of Production Research, 30(11), 2512-2543.
    • (1992) International Journal of Production Research , vol.30 , Issue.11 , pp. 2512-2543
    • Huang, H.P.1    Chang, P.C.2
  • 16
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling in a flexible manufacturing system
    • Kim, M. and Kim, Y. (1994) Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13(2), 85-93.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.1    Kim, Y.2
  • 18
    • 0026365483 scopus 로고
    • Real-time control of a manufacturing cell using knowledge-based simulation
    • IEEE, Piscataway, NJ
    • Manivannan, S. and Banks, J. (1991) Real-time control of a manufacturing cell using knowledge-based simulation, in Proceedings of the 1991 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 251-260.
    • (1991) Proceedings of the 1991 Winter Simulation Conference , pp. 251-260
    • Manivannan, S.1    Banks, J.2
  • 19
    • 0021390510 scopus 로고
    • The application of program generator software and its extensions to discrete-event simulation modeling
    • Mathewson, S.C. (1984) The application of program generator software and its extensions to discrete-event simulation modeling. IIE Transactions, 16, 3-18.
    • (1984) IIE Transactions , vol.16 , pp. 3-18
    • Mathewson, S.C.1
  • 20
    • 0002312694 scopus 로고
    • Real-time simulation for decision support in continuous flow manufacturing systems
    • IEEE, Piscataway, NJ
    • McConnell, P.G. and Medeiros, D.J. (1992) Real-time simulation for decision support in continuous flow manufacturing systems, in Proceedings of the 1992 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 936-944.
    • (1992) Proceedings of the 1992 Winter Simulation Conference , pp. 936-944
    • McConnell, P.G.1    Medeiros, D.J.2
  • 22
    • 0023978617 scopus 로고
    • Knowledge-based simulation model specification
    • Murray, K. and Sheppard, S. (1988) Knowledge-based simulation model specification. Simulation, 50(3), 112-119.
    • (1988) Simulation , vol.50 , Issue.3 , pp. 112-119
    • Murray, K.1    Sheppard, S.2
  • 23
    • 0003231564 scopus 로고
    • Programming by questionnaire: How to construct a program generator
    • IBM Corporation, Los Angeles, CA
    • Oldfather, P.M., Ginsberg, A.S. and Markowitz, H.M. (1966) Programming by questionnaire: how to construct a program generator. Rand report, RM-5129-PR, IBM Corporation, Los Angeles, CA.
    • (1966) Rand Report , vol.RM-5129-PR
    • Oldfather, P.M.1    Ginsberg, A.S.2    Markowitz, H.M.3
  • 25
    • 0012595504 scopus 로고
    • The role of simulation in operational planning and control of flexible manufacturing cells
    • IEEE, Piscataway, NJ
    • Rahimifard, S. and Newman, S.T. (1995) The role of simulation in operational planning and control of flexible manufacturing cells, in Proceedings of the 1995 Winter Simulation Conference, IEEE, Piscataway, NJ, pp. 936-944.
    • (1995) Proceedings of the 1995 Winter Simulation Conference , pp. 936-944
    • Rahimifard, S.1    Newman, S.T.2
  • 26
    • 0037896378 scopus 로고    scopus 로고
    • Using simulation as a proxy for a real shop floor and data collection system
    • NIST, Gaithersburg MD 20899
    • Riddick, F. (1998) Using simulation as a proxy for a real shop floor and data collection system. NIST report NISTIR 6173, NIST, Gaithersburg MD 20899.
    • (1998) NIST Report , vol.NISTIR 6173
    • Riddick, F.1
  • 28
    • 0012500363 scopus 로고
    • Message-based part state graphs (MPSG) for shop control
    • Working Paper Series, Pennsylvania State University, University Park, PA
    • Smith, J. and Joshi, S. (1993) Message-based part state graphs (MPSG) for shop control. Industrial and Manufacturing Engineering, Working Paper Series, Pennsylvania State University, University Park, PA.
    • (1993) Industrial and Manufacturing Engineering
    • Smith, J.1    Joshi, S.2
  • 31
    • 0035396337 scopus 로고    scopus 로고
    • Component-based simulation modeling from neutral component libraries
    • Son, Y., Jones, A. and Wysk, R. (2001) Component-based simulation modeling from neutral component libraries. Computers and Industrial Engineering, 45(3), 291-308.
    • (2001) Computers and Industrial Engineering , vol.45 , Issue.3 , pp. 291-308
    • Son, Y.1    Jones, A.2    Wysk, R.3
  • 33
    • 0039896159 scopus 로고    scopus 로고
    • Resource modeling for the integration of the manufacturing enterprise
    • Steele, J., Son, Y. and Wysk, R. (2001) Resource modeling for the integration of the manufacturing enterprise. Journal of Manufacturing Systems, 19(6), 407-427.
    • (2001) Journal of Manufacturing Systems , vol.19 , Issue.6 , pp. 407-427
    • Steele, J.1    Son, Y.2    Wysk, R.3
  • 34
    • 0002646636 scopus 로고
    • Expanding simulation beyond planning and design
    • Thomson, M.B. (1994) Expanding simulation beyond planning and design. Industrial Engineering, 26(10), 65-67.
    • (1994) Industrial Engineering , vol.26 , Issue.10 , pp. 65-67
    • Thomson, M.B.1
  • 35
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, D. and Wysk, R.A. (1989) An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27(9), 1603-1623.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, D.1    Wysk, R.A.2
  • 36
    • 0012551953 scopus 로고
    • Rapid prototyping of shop floor control systems for computer integrated manufacturing
    • Department of Industrial and Manufacturing Engineering, Pennsylvania State University, University Park, PA
    • Wysk, R., Joshi, S.B. and Pegden, C.D. (1992) Rapid prototyping of shop floor control systems for computer integrated manufacturing. ARPA project 8881, Department of Industrial and Manufacturing Engineering, Pennsylvania State University, University Park, PA.
    • (1992) ARPA Project , vol.8881
    • Wysk, R.1    Joshi, S.B.2    Pegden, C.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.