메뉴 건너뛰기




Volumn 41, Issue 2, 2001, Pages 151-161

A new lower bound for the flow shop group scheduling problem

Author keywords

Multiple machine; Production scheduling; Sequencing

Indexed keywords

HEURISTIC METHODS; MACHINE SHOPS; PRODUCTION CONTROL; RANDOM PROCESSES;

EID: 0035501183     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(01)00049-3     Document Type: Article
Times cited : (45)

References (6)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.