A heuristic algorithm for the n-job, m-machine sequencing problem
-
Campbell H.G., Dudck R.A., Smith M.L. A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science. 16:1970;B630-B637.
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudck, R.A.2
Smith, M.L.3
-
5
-
-
0017516618
-
An evaluation of flow-shop sequencing heuristics
-
Dannenbring D.G. An evaluation of flow-shop sequencing heuristics. Management Science. 23:1977;1174-1182.
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
6
-
-
0002811819
-
Cellular manufacturing becomes philosophy of management at component facility
-
Dumolien W.J., Santen W.P. Cellular manufacturing becomes philosophy of management at component facility. Industrial Engineering. 34:1983;72-76.
-
(1983)
Industrial Engineering
, vol.34
, pp. 72-76
-
-
Dumolien, W.J.1
Santen, W.P.2
-
10
-
-
0029264383
-
Flowshop sequencing with mean flowtime objective
-
Ho J.C. Flowshop sequencing with mean flowtime objective. European Journal of Operational Research. 81:1995;571-578.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 571-578
-
-
Ho, J.C.1
-
12
-
-
0000177367
-
Application of the branch-and-bound technique to some flowshop scheduling problems
-
Ignall E., Schrage L. Application of the branch-and-bound technique to some flowshop scheduling problems. Operations Research. 13:1965;400-412.
-
(1965)
Operations Research
, vol.13
, pp. 400-412
-
-
Ignall, E.1
Schrage, L.2
-
14
-
-
0003075019
-
Optimal two- And three-stage production schedules
-
Johnson S.M. Optimal two- and three-stage production schedules. Naval Research Logistics. 1:1954;61-68.
-
(1954)
Naval Research Logistics
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
19
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
Nawaz M., Enscore E.E. Jr, Ham I. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA. 11:1983;91-95.
-
(1983)
OMEGA
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore E.E., Jr.2
Ham, I.3
-
21
-
-
38249025037
-
Simulated annealing for permutation flow shop scheduling
-
Osman I.H., Potts C.N. Simulated annealing for permutation flow shop scheduling. OMEGA. 17:1989;551-557.
-
(1989)
OMEGA
, vol.17
, pp. 551-557
-
-
Osman, I.H.1
Potts, C.N.2
-
23
-
-
0027542699
-
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
-
Rajendran C. Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics. 29:1993;65-73.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 65-73
-
-
Rajendran, C.1
-
24
-
-
0001040519
-
A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria
-
Rajendran C. A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria. International Journal of Production Research. 32:1994;2541-2558.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2541-2558
-
-
Rajendran, C.1
-
25
-
-
0031234631
-
Heuristics for scheduling in a flowshop with setup, processing and removal times separated
-
Rajendran C., Ziegler H. Heuristics for scheduling in a flowshop with setup, processing and removal times separated. Production Planning and Control. 8:1997;568-576.
-
(1997)
Production Planning and Control
, vol.8
, pp. 568-576
-
-
Rajendran, C.1
Ziegler, H.2
-
26
-
-
0027814376
-
Scheduling in a cellular manufacturing system - A simulated annealing approach
-
Sridhar J., Rajendran C. Scheduling in a cellular manufacturing system - a simulated annealing approach. International Journal of Production Research. 31:1993;2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
28
-
-
0025700701
-
Some efficient heuristic methods for the flowshop sequencing problem
-
Taillard E. Some efficient heuristic methods for the flowshop sequencing problem. European Journal of Operational Research. 47:1990;65-79.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 65-79
-
-
Taillard, E.1
|