-
3
-
-
0024736520
-
On the complexity of scheduling with batch setups
-
C.L. Monma, and C.S. Potts On the complexity of scheduling with batch setups Operations Research 37 1989 798 804
-
(1989)
Operations Research
, vol.37
, pp. 798-804
-
-
Monma, C.L.1
Potts, C.S.2
-
4
-
-
0027660382
-
Analysis of heuristics for preemptive parallel machine scheduling with batch setup times
-
C.L. Monma, and C.S. Potts Analysis of heuristics for preemptive parallel machine scheduling with batch setup times Operations Research 41 1993 981 993
-
(1993)
Operations Research
, vol.41
, pp. 981-993
-
-
Monma, C.L.1
Potts, C.S.2
-
5
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
C.N. Potts, and L.N. Van Wassenhove Integrating scheduling with batching and lot-sizing a review of algorithms and complexity Journal of the Operational Research Society 43 1992 395 406
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
7
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A, Gupta JND, Aldowaisan T. A review of scheduling research involving setup considerations. Omega 1999; 219-39.
-
(1999)
Omega
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
10
-
-
0013419890
-
Designing GT cells enhanced by group scheduling: Key to flexible manufacturing system
-
St. Louis, MO
-
Al-Qattan I. Designing GT cells enhanced by group scheduling: key to flexible manufacturing system. Proceedings of the IIE Integrated Systems Conference, St. Louis, MO. 1988. p. 25-30.
-
(1988)
Proceedings of the IIE Integrated Systems Conference
, pp. 25-30
-
-
Al-Qattan, I.1
-
13
-
-
84960650840
-
Group production scheduling for minimum total tardiness: Part I
-
N. Nakamura, T. Yoshida, and K. Hitomi Group production scheduling for minimum total tardiness part I AIIE Transactions 10 1978 157 162
-
(1978)
AIIE Transactions
, vol.10
, pp. 157-162
-
-
Nakamura, N.1
Yoshida, T.2
Hitomi, K.3
-
15
-
-
0002844386
-
Scheduling the production of components at a common facility
-
K.R. Baker Scheduling the production of components at a common facility IIE Transactions 20 1988 32 35
-
(1988)
IIE Transactions
, vol.20
, pp. 32-35
-
-
Baker, K.R.1
-
16
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
S. Webster, and K.R. Baker Scheduling groups of jobs on a single machine Operations Research 43 1995 692 703
-
(1995)
Operations Research
, vol.43
, pp. 692-703
-
-
Webster, S.1
Baker, K.R.2
-
17
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
D.R. Sule Sequencing n jobs on two machines with setup, processing and removal times separated Naval Research Logistics Quarterly 29 1982 517 519
-
(1982)
Naval Research Logistics Quarterly
, vol.29
, pp. 517-519
-
-
Sule, D.R.1
-
19
-
-
0002311638
-
Approximate schedules for the two-machine flowshop with sequence dependent setup times
-
J.N.D. Gupta, and W.P. Darrow Approximate schedules for the two-machine flowshop with sequence dependent setup times Indian Journal of Management and Systems 1 1985 6 11
-
(1985)
Indian Journal of Management and Systems
, vol.1
, pp. 6-11
-
-
Gupta, J.N.D.1
Darrow, W.P.2
-
24
-
-
0003075019
-
Optimal two- and three-stage production schedules with set-up times included
-
S.M. Johnson Optimal two- and three-stage production schedules with set-up times included Naval Research Logistics Quarterly 1 1954 61 68
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
25
-
-
0003408279
-
-
Wiley Chichester, UK
-
E.L. Lawler, J.K. Lenstra, A.H. Kan, G. Rinnooy, and D.B. Shmoys The traveling salesman problem: a guided tour of combinatorial optimization 1985 Wiley Chichester, UK
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
-
-
Lawler, E.L.1
Lenstra, J.K.2
Kan, A.H.3
Rinnooy, G.4
Shmoys, D.B.5
-
26
-
-
0001345505
-
Some new branching and bounding criteria for the asymmetric traveling salesman problem
-
G. Carpento, and P. Toth Some new branching and bounding criteria for the asymmetric traveling salesman problem Management Science 26 1980 736 743
-
(1980)
Management Science
, vol.26
, pp. 736-743
-
-
Carpento, G.1
Toth, P.2
-
27
-
-
0002703574
-
Tabu-search: A tutorial
-
F. Glover Tabu-search a tutorial Interfaces 20 1990 79 94
-
(1990)
Interfaces
, vol.20
, pp. 79-94
-
-
Glover, F.1
-
28
-
-
0031103522
-
Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
-
R. Logendran, and A. Sonthinen Tabu search-based approach for scheduling job-shop type flexible manufacturing systems Journal of the Operational Research Society 48 1997 264 277
-
(1997)
Journal of the Operational Research Society
, vol.48
, pp. 264-277
-
-
Logendran, R.1
Sonthinen, A.2
-
29
-
-
1642328443
-
Unrelated parallel machine scheduling with job splitting
-
R. Logendran, and F. Subur Unrelated parallel machine scheduling with job splitting IIE Transactions 36 4 2004 359 372
-
(2004)
IIE Transactions
, vol.36
, Issue.4
, pp. 359-372
-
-
Logendran, R.1
Subur, F.2
-
30
-
-
0035521426
-
Generating experimental data for the generalized assignment problem
-
N.G. Hall, and M.E. Posner Generating experimental data for the generalized assignment problem Operations Research 49 6 2001 854 865
-
(2001)
Operations Research
, vol.49
, Issue.6
, pp. 854-865
-
-
Hall, N.G.1
Posner, M.E.2
-
32
-
-
0004298908
-
-
SAS Institute Inc., Cary, North Carolina, USA
-
SAS Release 8.2, 1999-2001, SAS Institute Inc., Cary, North Carolina, USA.
-
(1999)
SAS Release 8.2
-
-
-
33
-
-
21444461317
-
-
ILOG CPLEX, 2001-2002, Release 8.1, Paris, France
-
ILOG CPLEX, 2001-2002, Release 8.1, Paris, France.
-
-
-
|