메뉴 건너뛰기




Volumn 15, Issue 12, 1999, Pages 914-932

Analysis of group-scheduling heuristics in a manufacturing cell

Author keywords

[No Author keywords available]

Indexed keywords

CELLULAR MANUFACTURING; COMPUTER SIMULATION; GROUP TECHNOLOGY; HEURISTIC METHODS; QUEUEING THEORY; SCHEDULING;

EID: 0033329118     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s001700050149     Document Type: Article
Times cited : (23)

References (38)
  • 1
    • 0010309897 scopus 로고
    • Group scheduling and order releasing: Review and foundations for research
    • Farzad Mahmoody and Kavin J. Dooly, "Group scheduling and order releasing: Review and foundations for research", Production Planning and Control, 3(1), pp. 70-78, 1992.
    • (1992) Production Planning and Control , vol.3 , Issue.1 , pp. 70-78
    • Mahmoody, F.1    Dooly, K.J.2
  • 2
    • 0021581990 scopus 로고
    • It's time to 'CELL' your factory
    • J. B. Droy, "It's time to 'CELL' your factory", Production Engineering, 34, pp. 50-52, 1984.
    • (1984) Production Engineering , vol.34 , pp. 50-52
    • Droy, J.B.1
  • 6
    • 0015681904 scopus 로고
    • An economic evaluation of job shop dispatching rules
    • C. H. Jones, "An economic evaluation of job shop dispatching rules", Management Science, 20(3), pp. 293-307, 1973.
    • (1973) Management Science , vol.20 , Issue.3 , pp. 293-307
    • Jones, C.H.1
  • 10
    • 0026907761 scopus 로고
    • Scheduling manufacturing systems
    • Weihua He and Andrew Kusiak, "Scheduling manufacturing systems", Computers in Industry, 20, pp. 163-175, 1992.
    • (1992) Computers in Industry , vol.20 , pp. 163-175
    • He, W.1    Kusiak, A.2
  • 11
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in job shop scheduling
    • Imtiaz Ahmed and W. Warren Fisher, "Due date assignment, job order release, and sequencing interaction in job shop scheduling", Decision Sciences [DSI], 23(3), pp. 633-647, 1992.
    • (1992) Decision Sciences [DSI] , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 12
    • 0027699991 scopus 로고
    • An efficient dynamic dispatching rule for scheduling in a job shop
    • T. S. Raghu and Chandrasekhran Rajendran, "An efficient dynamic dispatching rule for scheduling in a job shop", International Journal of Production Economics, 32, pp. 301-313, 1993.
    • (1993) International Journal of Production Economics , vol.32 , pp. 301-313
    • Raghu, T.S.1    Rajendran, C.2
  • 13
    • 0042088700 scopus 로고
    • Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
    • Ihsan Sabuncuoglu and Don L. Hommertzheim, "Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules", The International Journal of Flexible Manufacturing Systems, 5, pp. 301-323, 1993.
    • (1993) The International Journal of Flexible Manufacturing Systems , vol.5 , pp. 301-323
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 14
    • 0028725846 scopus 로고
    • A simulation study of due-date assignment rules in a dynamic job shop
    • G. J. Udo, "A simulation study of due-date assignment rules in a dynamic job shop", Journal of the Operational Research Society [OQT], 45(12), pp. 1425-1435, 1994.
    • (1994) Journal of the Operational Research Society [OQT] , vol.45 , Issue.12 , pp. 1425-1435
    • Udo, G.J.1
  • 17
    • 0029344295 scopus 로고
    • A comparative study of some priority dispatching rules under different shop loads
    • Avinash M. Waikar, Bhaba R. Sarker and Anil M. Lal, "A comparative study of some priority dispatching rules under different shop loads", Production Planning and Control, 6(4), pp. 301-310, 1995.
    • (1995) Production Planning and Control , vol.6 , Issue.4 , pp. 301-310
    • Waikar, A.M.1    Sarker, B.R.2    Lal, A.M.3
  • 18
    • 0001242514 scopus 로고
    • Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routeing capability
    • R. Piplani and J. Talavage, "Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routeing capability", International Journal of Production Economics, 33(8), pp. 2181-2196, 1995.
    • (1995) International Journal of Production Economics , vol.33 , Issue.8 , pp. 2181-2196
    • Piplani, R.1    Talavage, J.2
  • 19
    • 0029387523 scopus 로고
    • Evaluation of scheduling rules with commensurate customer priorities in job shops
    • John B. Jensen, Patrick R. Philipoom and Manoj K. Malhotra, "Evaluation of scheduling rules with commensurate customer priorities in job shops", Journal of Operations Management [JOT], 13(3), pp. 213-228, 1995.
    • (1995) Journal of Operations Management [JOT] , vol.13 , Issue.3 , pp. 213-228
    • Jensen, J.B.1    Philipoom, P.R.2    Malhotra, M.K.3
  • 20
    • 0002536833 scopus 로고
    • Simulation for analysis of scheduling rules for a flexible manufacturing system
    • S. K. Goyal, Kapil Mehta, Rambabu Kodkodali and S. G. Deshmukh, "Simulation for analysis of scheduling rules for a flexible manufacturing system", Integrated Manufacturing Systems[ING], 6(5), pp. 21-26, 1995.
    • (1995) Integrated Manufacturing Systems[ING] , vol.6 , Issue.5 , pp. 21-26
    • Goyal, S.K.1    Mehta, K.2    Kodkodali, R.3    Deshmukh, S.G.4
  • 23
    • 0031076549 scopus 로고    scopus 로고
    • Improving job shop performance by coordinating dispatching rules
    • O. Holthaus and H. Ziegler, "Improving job shop performance by coordinating dispatching rules", International Journal of Production Economics, 35(2), pp. 539-549, 1997.
    • (1997) International Journal of Production Economics , vol.35 , Issue.2 , pp. 539-549
    • Holthaus, O.1    Ziegler, H.2
  • 24
    • 0031246589 scopus 로고    scopus 로고
    • Design of efficient job shop scheduling rules
    • O. Holthaus, "Design of efficient job shop scheduling rules", Computers and Industrial Engineering [CIE], 33(1,2), pp. 249-252, 1997.
    • (1997) Computers and Industrial Engineering [CIE] , vol.33 , Issue.1-2 , pp. 249-252
    • Holthaus, O.1
  • 25
    • 0030825235 scopus 로고    scopus 로고
    • Job sequencing rules for minimizing the expected makespan in flexible machines
    • Amiya K. Chakravarthy and Nagaraj Balakrishnan, "Job sequencing rules for minimizing the expected makespan in Flexible machines", European Journal of Operational Research [EJO], 96(2), pp. 274-288, 1997.
    • (1997) European Journal of Operational Research [EJO] , vol.96 , Issue.2 , pp. 274-288
    • Chakravarthy, A.K.1    Balakrishnan, N.2
  • 26
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • I. Sabuncuoglu, "A study of scheduling rules of flexible manufacturing systems: a simulation approach", International Journal of Production Economics, 36(2), pp. 527-546, 1998.
    • (1998) International Journal of Production Economics , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 27
    • 0027606670 scopus 로고
    • A comprehensive analysis of group scheduling heuristics in a job shop cell
    • R. A. Ruben, C. T. Mosier and F. Mahmoody, "A comprehensive analysis of group scheduling heuristics in a job shop cell", International Journal of Production Research, 31(6), pp. 1343-1369, 1993.
    • (1993) International Journal of Production Research , vol.31 , Issue.6 , pp. 1343-1369
    • Ruben, R.A.1    Mosier, C.T.2    Mahmoody, F.3
  • 32
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence dependent set-up time scheduling procedure in group technology and traditional shops
    • B. B. Flynn. "Repetitive lots: The use of a sequence dependent set-up time scheduling procedure in group technology and traditional shops", Journal of Operations Management, 7, pp. 203-213, 1987.
    • (1987) Journal of Operations Management , vol.7 , pp. 203-213
    • Flynn, B.B.1
  • 33
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in job shop manufacturing cell
    • F. Mahmoodi, K. J. Dooly and P. J. Starr, "An investigation of dynamic group scheduling heuristics in job shop manufacturing cell", International Journal of Production Research, 28, pp. 1695-1711, 1990.
    • (1990) International Journal of Production Research , vol.28 , pp. 1695-1711
    • Mahmoodi, F.1    Dooly, K.J.2    Starr, P.J.3
  • 34
    • 0026220052 scopus 로고
    • A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
    • Farzad Mahmoodi and Kavin J. Dooly, "A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell", International Journal of Production Research, 29(9), pp. 1923-1939, 1991.
    • (1991) International Journal of Production Research , vol.29 , Issue.9 , pp. 1923-1939
    • Mahmoodi, F.1    Dooly, K.J.2
  • 35
    • 0002765014 scopus 로고
    • Dynamic group scheduling heuristics in a flow through cell environment
    • Faraz Mahmoody, Edward J. Tierny and Charles T. Mosier, "Dynamic group scheduling heuristics in a flow through cell environment", Decision Science, 23, pp. 61-85, 1992.
    • (1992) Decision Science , vol.23 , pp. 61-85
    • Mahmoody, F.1    Tierny, E.J.2    Mosier, C.T.3
  • 36
    • 84990617466 scopus 로고
    • An investigation of scheduling policies in a dual-constrained manufacturing cell
    • Glen T. Wirth, Farzad Mahmoodi and Charles T. Mosier, "An investigation of scheduling policies in a dual-constrained manufacturing cell", Decision Sciences, 24, pp. 761-768, 1993.
    • (1993) Decision Sciences , vol.24 , pp. 761-768
    • Wirth, G.T.1    Mahmoodi, F.2    Mosier, C.T.3
  • 37
    • 0031076550 scopus 로고    scopus 로고
    • A new shop based and predictive scheduling for cellular manufacturing
    • F. Mahmoodi and G. E. Martin, "A new shop based and predictive scheduling for cellular manufacturing", International Journal of Production Research, 35(2), pp. 313-326, 1997.
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 313-326
    • Mahmoodi, F.1    Martin, G.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.