Volumn 23, Issue 8, 2005, Pages 600-610

Impact of soft logic on the probabilistic duration of construction projects

Author keywords

Risk; Simulation; Soft logic; Time

Indexed keywords

COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; MATHEMATICAL MODELS; PERT; PROBABILITY; RISK ASSESSMENT; RISK MANAGEMENT; SCHEDULING;

EID: 27944510967     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2005.05.008     Document Type: Article
Times cited : (33)

References (23)
  • 1
    • 0016994648 scopus 로고
    • Probabilistic time scheduling
    • K.C. Crandall Probabilistic time scheduling J Construct Div 102 co3 1976 415-423
    • (1976) J. Construct. Div. , vol.102 , Issue.co3 , pp. 415-423
    • Crandall, K.C.1
  • 2
    • 0018478270 scopus 로고
    • Simulation of construction project duration
    • R.I. Carr Simulation of construction project duration J Construct Div 105 2 1979 117-128
    • (1979) J. Construct. Div. , vol.105 , Issue.2 , pp. 117-128
    • Carr, R.I.1
  • 3
    • 0020824616 scopus 로고
    • Stochastic network model for planning scheduling
    • J.C. Woolery K.C. Crandall Stochastic network model for planning scheduling J Construct Eng Manage 109 3 1983 342-354
    • (1983) J. Construct. Eng. Manage , vol.109 , Issue.3 , pp. 342-354
    • Woolery, J.C.1    Crandall, K.C.2
  • 4
    • 0022404044 scopus 로고
    • Simulation model to forecast project completion time
    • H.N. Ahuja V. Nandakumar Simulation model to forecast project completion time J Construct Eng Manage 111 4 1985 325-342
    • (1985) J. Construct. Eng. Manage , vol.111 , Issue.4 , pp. 325-342
    • Ahuja, H.N.1    Nandakumar, V.2
  • 5
    • 0003138676 scopus 로고
    • Quantification and management of uncertainty in activity duration networks
    • M. Ranasinghe Quantification and management of uncertainty in activity duration networks Construct Manage Econom 12 1994 15-29
    • (1994) Construct. Manage Econom. , vol.12 , pp. 15-29
    • Ranasinghe, M.1
  • 7
    • 0034322763 scopus 로고    scopus 로고
    • Model for evaluating networks under correlated uncertainty - NETCOR
    • W.C. Wang L.A. Demsetz Model for evaluating networks under correlated uncertainty - NETCOR J Construct Eng Manage 126 6 2000 458-466
    • (2000) J. Construct. Eng. Manage , vol.126 , Issue.6 , pp. 458-466
    • Wang, W.C.1    Demsetz, L.A.2
  • 9
    • 0013415196 scopus 로고
    • An intelligent data model for schedule updating
    • PhD dissertation, University of California, Berkeley, CA
    • El-sersy AH. An intelligent data model for schedule updating. PhD dissertation, University of California, Berkeley, CA; 1992.
    • (1992)
    • El-sersy, A.H.1
  • 10
    • 0009117670 scopus 로고
    • Factors for generating initial construction schedules
    • USACERL technical manuscript. P-91/54, US Army Corps of Engineers, Construction Engineering Research Laboratory, Champaign, IL
    • Echeverry D. Factors for generating initial construction schedules. USACERL technical manuscript. P-91/54, US Army Corps of Engineers, Construction Engineering Research Laboratory, Champaign, IL; 1991.
    • (1991)
    • Echeverry, D.1
  • 12
    • 0001273577 scopus 로고
    • An algebra for the analysis of generalized activity networks
    • S.E. Elmaghraby An algebra for the analysis of generalized activity networks Manage Sci 10 3 1964 494-514
    • (1964) Manage Sci. , vol.10 , Issue.3 , pp. 494-514
    • Elmaghraby, S.E.1
  • 13
    • 0000302001 scopus 로고
    • GERT: Graphical evaluation and review technique, part I. Fundamentals
    • A.A.B. Pritsker W.W. Happ GERT: Graphical evaluation and review technique, part I. fundamentals J Ind Eng 17 5 1966 267-274
    • (1966) J. Ind. Eng. , vol.17 , Issue.5 , pp. 267-274
    • Pritsker, A.A.B.1    Happ, W.W.2
  • 14
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • M.A. Fisher F. Aalami Scheduling with computer-interpretable construction method models J Construct Eng Manage 122 4 1996 337-347
    • (1996) J. Construct. Eng. Manage , vol.122 , Issue.4 , pp. 337-347
    • Fisher, M.A.1    Aalami, F.2
  • 15
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • E.W. Davis J.H. Patterson A comparison of heuristic and optimum solutions in resource-constrained project scheduling Manage Sci 21 8 1975 944-955
    • (1975) Manage Sci. , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 16
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • F.B. Talbot J.H. Patterson An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems Manage Sci 24 11 1978 1163-1174
    • (1978) Manage Sci. , vol.24 , Issue.11 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 17
    • 0025448002 scopus 로고
    • Network resource allocation with support of a fuzzy expert system
    • T.C. Chang C.W. Ibbs K.C. Crandall Network resource allocation with support of a fuzzy expert system J Construct Eng Manage 116 2 1990 239-259
    • (1990) J. Construct. Eng. Manage , vol.116 , Issue.2 , pp. 239-259
    • Chang, T.C.1    Ibbs, C.W.2    Crandall, K.C.3
  • 18
    • 0032595609 scopus 로고    scopus 로고
    • 2 SM: A dynamic approach to resource constraint project scheduling
    • 2 SM: A dynamic approach to resource constraint project scheduling Int J Project Manage 17 6 1999 383-391
    • (1999) Int. J. Project Manage , vol.17 , Issue.6 , pp. 383-391
    • Khamooshi, H.1
  • 19
    • 0036778997 scopus 로고    scopus 로고
    • Resource-constrained project management using enhanced theory of constraint
    • C.C. Wei P.H. Liu Y.C. Tsai Resource-constrained project management using enhanced theory of constraint Int J Project Manage 20 2002 561-567
    • (2002) Int. J. Project Manage , vol.20 , pp. 561-567
    • Wei, C.C.1    Liu, P.H.2    Tsai, Y.C.3
  • 20
    • 0036132285 scopus 로고    scopus 로고
    • Project management applications of the theory of constraints beyond critical chain scheduling
    • H. Steyn Project management applications of the theory of constraints beyond critical chain scheduling Int J Project Manage 20 2002 75-80
    • (2002) Int. J. Project Manage , vol.20 , pp. 75-80
    • Steyn, H.1
  • 21
    • 13944281016 scopus 로고    scopus 로고
    • Constraint-based planning with integrated production scheduler over internet
    • D.K.H. Chua L.J. Shen S.H. Bok Constraint-based planning with integrated production scheduler over internet J Construct Eng Manage 129 3 2003 293-301
    • (2003) J. Construct. Eng. Manage , vol.129 , Issue.3 , pp. 293-301
    • Chua, D.K.H.1    Shen, L.J.2    Bok, S.H.3
  • 22
    • 13944280651 scopus 로고    scopus 로고
    • Resource-activity critical-path method for construction planning
    • M. Lu H. Li Resource-activity critical-path method for construction planning J Construct Eng Manage 129 4 2003 412-420
    • (2003) J. Construct. Eng. Manage , vol.129 , Issue.4 , pp. 412-420
    • Lu, M.1    Li, H.2
  • 23
    • 0004007948 scopus 로고    scopus 로고
    • STROBOSCOPE: State and resource based simulation of construction processes
    • PhD dissertation, University of Michigan, Ann Arbor, MI
    • Martinez JC. STROBOSCOPE: State and resource based simulation of construction processes. PhD dissertation, University of Michigan, Ann Arbor, MI; 1996.
    • (1996)
    • Martinez, J.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.