메뉴 건너뛰기




Volumn 23, Issue 7, 2005, Pages 554-563

Statistical analysis of causes for design change in highway construction on Taiwan

Author keywords

Design change; Highway construction; Statistics analysis; Taiwan

Indexed keywords

CONSTRUCTION INDUSTRY; GEOLOGICAL SURVEYS; HIGHWAY ENGINEERING; HIGHWAY PLANNING; STATISTICAL METHODS;

EID: 27744473626     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2004.07.010     Document Type: Article
Times cited : (80)

References (12)
  • 1
    • 4143124332 scopus 로고
    • The Impact of Changes on Construction Cost and Schedule Publication
    • CII 6-10, Construction Industry Institute, Austin, TX
    • CII, The Impact of Changes on Construction Cost and Schedule, Publication 6-10, Construction Industry Institute, Austin, TX; 1990.
    • (1990)
  • 2
    • 0029361062 scopus 로고
    • Quantitative effects of construction on labor productivity
    • H.R. Thomas C.L. Napolitan Quantitative effects of construction on labor productivity J. Construct. Eng. Manage., ASCE 121 3 1995 290-296
    • (1995) J. Construct. Eng. Manage., ASCE , vol.121 , Issue.3 , pp. 290-296
    • Thomas, H.R.1    Napolitan, C.L.2
  • 3
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • C.W. Ibbs Quantitative impacts of project change: Size issues ASCE J. Construct. Eng. Manage. 123 3 1997 308-311
    • (1997) ASCE J. Construct. Eng. Manage. , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, C.W.1
  • 4
    • 0010131489 scopus 로고    scopus 로고
    • The impact of change orders on electrical construction labor efficiency
    • Master Thesis, University of Wisconsin-Madison
    • Thomack DJ. The impact of change orders on electrical construction labor efficiency, Master Thesis, University of Wisconsin-Madison; 1996.
    • (1996)
    • Thomack, D.J.1
  • 5
    • 85001687884 scopus 로고    scopus 로고
    • Managing change order and claims
    • R.K. Cox Managing change order and claims J. Manage. Eng., ASCE 13 1 1997 24-30
    • (1997) J. Manage. Eng., ASCE , vol.13 , Issue.1 , pp. 24-30
    • Cox, R.K.1
  • 7
    • 3242662970 scopus 로고    scopus 로고
    • The study of change orders for National Expressway Construction in Taiwan - Northern Second Expressway Construction Project
    • Masters Thesis, National Taiwan University
    • Hong-Ye Dai. The study of change orders for National Expressway Construction in Taiwan - Northern Second Expressway Construction Project, Masters Thesis, National Taiwan University; 1998.
    • (1998)
    • Hong-Ye, D.1
  • 10
    • 0002688193 scopus 로고
    • Multisite qualitative research: Optimizing description and generalizability
    • R.E. Herriott W.A. Firestone Multisite qualitative research: Optimizing description and generalizability Educ. Res. 12 1983 14-19
    • (1983) Educ. Res. , vol.12 , pp. 14-19
    • Herriott, R.E.1    Firestone, W.A.2
  • 12
    • 14744304262 scopus 로고    scopus 로고
    • Risk allocation and risk handling of highway projects in Taiwan
    • M.T. Wang H.Y. Chou Risk allocation and risk handling of highway projects in Taiwan ASCE J. Manage. Eng. 19 2 2003 60-68
    • (2003) ASCE J. Manage. Eng. , vol.19 , Issue.2 , pp. 60-68
    • Wang, M.T.1    Chou, H.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.