메뉴 건너뛰기




Volumn 23, Issue 7, 2005, Pages 546-553

Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding

Author keywords

Chance constrained programming; Cost; Risk; Time

Indexed keywords

COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; LINEAR PROGRAMMING; MATHEMATICAL MODELS; MONTE CARLO METHODS; OPTIMIZATION; PROBABILITY DISTRIBUTIONS; RESOURCE ALLOCATION; RISK MANAGEMENT; SCHEDULING;

EID: 27744569616     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2005.03.003     Document Type: Article
Times cited : (31)

References (32)
  • 1
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • F.F. Boctor Some efficient multi-heuristic procedures for resource-constrained project scheduling Eur J Oper Res 49 1990 3-13
    • (1990) Eur. J. Oper. Res. , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 2
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models and methods
    • P. Brucker A. Drexl R. Mohring Resource-constrained project scheduling: notation, classification, models and methods Eur J Oper Res 112 1999 3-41
    • (1999) Eur. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Mohring, R.3
  • 3
    • 27744483260 scopus 로고    scopus 로고
    • Chance-constrained programming model for repetitive project scheduling under stochastic resource and funding supply
    • Master thesis, Chaoyang University of Technology, Taiwan
    • Chang CY. Chance-constrained programming model for repetitive project scheduling under stochastic resource and funding supply. Master thesis, Chaoyang University of Technology, Taiwan; 2003, 133 pp.
    • (2003) , pp. 133
    • Chang, C.Y.1
  • 4
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • A. Charnes W.W. Cooper Chance-constrained programming Manage Sci 6 1 1959 73-79
    • (1959) Manage. Sci. , vol.6 , Issue.1 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 5
    • 0006799266 scopus 로고
    • A remark on algorithm AS63: The incomplete beta integral, AS64. Inverse of the incomplete beta function ratio
    • G.W. Cran K.J. Martin G.E. Thomas A remark on algorithm AS63: The incomplete beta integral, AS64. Inverse of the incomplete beta function ratio Appl Stat 26 1977 111-114
    • (1977) Appl. Stat. , vol.26 , pp. 111-114
    • Cran, G.W.1    Martin, K.J.2    Thomas, G.E.3
  • 6
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • E. Demeulemeester W. Herroelen A branch-and-bound procedure for the multiple resource-constrained project scheduling problem Manage Sci 38 1992 1803-1818
    • (1992) Manage. Sci. , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 8
    • 0032210246 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
    • B. De Reyck W. Herroelen A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations Eur J Oper Res 111 1998 152-174
    • (1998) Eur. J. Oper. Res. , vol.111 , pp. 152-174
    • De Reyck, B.1    Herroelen, W.2
  • 10
    • 0027302082 scopus 로고
    • Resource allocation via dynamic programming in activity networks
    • S.E. Elmaghraby Resource allocation via dynamic programming in activity networks Eur J Oper Res 64 1993 199-215
    • (1993) Eur. J. Oper. Res. , vol.64 , pp. 199-215
    • Elmaghraby, S.E.1
  • 11
    • 0035372223 scopus 로고    scopus 로고
    • Chance-constrained programming in activity networks: A critical evaluation
    • S.E. Elmaghraby H. Soewandi M.J. Yao Chance-constrained programming in activity networks: A critical evaluation Eur J Oper Res 131 2001 440-458
    • (2001) Eur. J. Oper. Res. , vol.131 , pp. 440-458
    • Elmaghraby, S.E.1    Soewandi, H.2    Yao, M.J.3
  • 13
    • 0022779734 scopus 로고
    • Linear scheduling using optimal control theory
    • V.K. Handa R.M. Barcia Linear scheduling using optimal control theory ASCE J Constr Eng Manage 112 3 1986 387-393
    • (1986) ASCE J. Constr. Eng. Manage. , vol.112 , Issue.3 , pp. 387-393
    • Handa, V.K.1    Barcia, R.M.2
  • 14
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • T. Hegazy Optimization of resource allocation and leveling using genetic algorithms ASCE J Constr Eng Manage 125 3 1999 167-175
    • (1999) ASCE J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 15
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A survey of recent developments
    • W. Herroelen B.D. Reyck E. Demeulemeester Resource-constrained project scheduling: A survey of recent developments Comput Oper Res 25 4 1998 279-302
    • (1998) Comput. Oper. Res. , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    Reyck, B.D.2    Demeulemeester, E.3
  • 16
    • 0028517361 scopus 로고
    • A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
    • O. Icmeli S.S. Erenguc A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows Comput Oper Res 21 8 1994 841-853
    • (1994) Comput. Oper. Res. , vol.21 , Issue.8 , pp. 841-853
    • Icmeli, O.1    Erenguc, S.S.2
  • 17
    • 0027912257 scopus 로고
    • Simulated annealing for resource-constrained scheduling
    • D.E. Jeffcoat R.L. Bulfin Simulated annealing for resource-constrained scheduling Eur J Oper Res 70 1993 43-51
    • (1993) Eur. J. Oper. Res. , vol.70 , pp. 43-51
    • Jeffcoat, D.E.1    Bulfin, R.L.2
  • 18
    • 0002866635 scopus 로고
    • The critical path method: Resources planning and scheduling
    • J.F. Muth G.L. Thompson (Eds) Prentice-Hall Englewood Cliffs (NJ)
    • J.E. Kelley The critical path method: Resources planning and scheduling in: J.F. Muth G.L. Thompson (Eds) Industrial scheduling 1963 Prentice-Hall Englewood Cliffs (NJ) 347-365
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley, J.E.1
  • 19
    • 0003740863 scopus 로고    scopus 로고
    • A reservations-based railway network operations management system
    • PhD thesis, Department of Systems Engineering, University of Pennsylvania
    • Kraft ER. A reservations-based railway network operations management system. PhD thesis, Department of Systems Engineering, University of Pennsylvania; 1998.
    • (1998)
    • Kraft, E.R.1
  • 20
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for constructions scheduling
    • S.S. Leu C.H. Yang GA-based multicriteria optimal model for constructions scheduling ASCE J Constr Eng Manage 125 6 1999 420-427
    • (1999) ASCE J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.S.1    Yang, C.H.2
  • 21
    • 0004275276 scopus 로고
    • The line-of-balance method
    • England: Industrial Training Division
    • P. Lumsden The line-of-balance method 1968 Industrial Training Division England 77 pp
    • (1968) , pp. 77
    • Lumsden, P.1
  • 22
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
    • A. Mingozzi V. Maniezzo S. Ricciardelli L. Bianco An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation Manage Sci 44 5 1998 714-729
    • (1998) Manage. Sci. , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 23
    • 24944509375 scopus 로고
    • Decision under risk
    • Publication No. 8162, Economic Research Institute, Stockholm School of Economics, Sweden
    • Näslund B. Decision under risk. Publication No. 8162, Economic Research Institute, Stockholm School of Economics, Sweden; 1967.
    • (1967)
    • Näslund, B.1
  • 25
    • 0002399812 scopus 로고
    • The percentage points of the normal distribution
    • R.E. Odeh J.O. Evans The percentage points of the normal distribution Appl Stat 23 1974 96-97
    • (1974) Appl. Stat. , vol.23 , pp. 96-97
    • Odeh, R.E.1    Evans, J.O.2
  • 26
    • 0035534934 scopus 로고    scopus 로고
    • Chance-constrained optimal control for multireservoir system optimization and risk analysis
    • T.B.M.J. Ouarda J.W. Labadie Chance-constrained optimal control for multireservoir system optimization and risk analysis Stoch Environ Res Risk Assess 15 3 2001 185-204
    • (2001) Stoch. Environ. Res. Risk. Assess. , vol.15 , Issue.3 , pp. 185-204
    • Ouarda, T.B.M.J.1    Labadie, J.W.2
  • 27
    • 0020717288 scopus 로고
    • Resource sharing in linear construction
    • S. Perera Resource sharing in linear construction ASCE J Constr Eng Manage 109 1 1983 102-111
    • (1983) ASCE J. Constr. Eng. Manage. , vol.109 , Issue.1 , pp. 102-111
    • Perera, S.1
  • 28
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • R.M. Reda RPM: Repetitive project modeling ASCE J Constr Eng Manage 116 2 1990 316330
    • (1990) ASCE J. Constr. Eng. Manage. , vol.116 , Issue.2 , pp. 316330
    • Reda, R.M.1
  • 29
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • I.D. Tommelein D. Riley G.A. Howell Parade game: Impact of work flow variability on trade performance ASCE J Constr Eng Manage 125 5 1999 304-310
    • (1999) ASCE J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3
  • 30
    • 0032210453 scopus 로고    scopus 로고
    • Using tabu search to schedule activities of stochastic resource-constrained projects
    • Y.W. Tsai D.D. Gemmill Using tabu search to schedule activities of stochastic resource-constrained projects Eur J Oper Res 111 1998 129-141
    • (1998) Eur. J. Oper. Res. , vol.111 , pp. 129-141
    • Tsai, Y.W.1    Gemmill, D.D.2
  • 31
    • 0001694940 scopus 로고
    • A heuristic model for scheduling large projects with limited resources
    • J.D. Wiest A heuristic model for scheduling large projects with limited resources Manage Sci 13 6 1967 B359-B377
    • (1967) Manage. Sci. , vol.13 , Issue.6
    • Wiest, J.D.1
  • 32
    • 4043093611 scopus 로고    scopus 로고
    • Scheduling system with focus on practical concerns in repetitive projects
    • I.T. Yang P.G. Ioannou Scheduling system with focus on practical concerns in repetitive projects Constr Manage Econ 22 6 2004 619-630
    • (2004) Constr. Manage. Econ. , vol.22 , Issue.6 , pp. 619-630
    • Yang, I.T.1    Ioannou, P.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.