메뉴 건너뛰기




Volumn 10, Issue 1, 2004, Pages 23-32

Highway development decision-making under uncertainty: A real options approach

Author keywords

Facility expansion; Highway construction; Highway design; Monte Carlo method; Regression analysis; Rehabilitation; Stochastic models

Indexed keywords

COMPUTER AIDED ANALYSIS; DETERIORATION; HIGHWAY ENGINEERING; HUMAN REHABILITATION EQUIPMENT; MATHEMATICAL MODELS; MATHEMATICAL TECHNIQUES; MONTE CARLO METHODS; RISK ASSESSMENT; STOCHASTIC CONTROL SYSTEMS;

EID: 1942538239     PISSN: 10760342     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)1076-0342(2004)10:1(23)     Document Type: Article
Times cited : (103)

References (25)
  • 1
    • 0036850890 scopus 로고    scopus 로고
    • Optimum flexible pavement life-cycle analysis model
    • Abaza, K. A. (2002). "Optimum flexible pavement life-cycle analysis model." J. Transp. Eng., 128(16), 542-549.
    • (2002) J. Transp. Eng. , vol.128 , Issue.16 , pp. 542-549
    • Abaza, K.A.1
  • 11
    • 0036571051 scopus 로고    scopus 로고
    • Profitability evaluation of intelligent transport system investment
    • Leviakangas, P., and Lahesmaa, J. (2002). "Profitability evaluation of intelligent transport system investment." J. Transp. Eng., 128(3), 276-286.
    • (2002) J. Transp. Eng. , vol.128 , Issue.3 , pp. 276-286
    • Leviakangas, P.1    Lahesmaa, J.2
  • 12
    • 0030232758 scopus 로고    scopus 로고
    • Reliability-based processing of Markov chains for modeling pavement network deterioration
    • Transportation Research Board, Washington, D.C
    • Li, N., Xie, W., and Haas, R. (1996). "Reliability-based processing of Markov chains for modeling pavement network deterioration." Transportation Research Record 1524, Transportation Research Board, Washington, D.C., 1-10.
    • (1996) Transportation Research Record 1524 , pp. 1-10
    • Li, N.1    Xie, W.2    Haas, R.3
  • 13
    • 0035578679 scopus 로고    scopus 로고
    • Valuing American options by simulation: A simple least-squares approach
    • Longstaff, F. A., and Schwartz, E. S. (2001). "Valuing American options by simulation: A simple least-squares approach." Rev. Financ. Stud., 14(1), 113-147.
    • (2001) Rev. Financ. Stud. , vol.14 , Issue.1 , pp. 113-147
    • Longstaff, F.A.1    Schwartz, E.S.2
  • 15
    • 38349169113 scopus 로고
    • Estimation of infrastructure transition probabilities from condition rating data
    • Madanat, S. M., Mishalani, R., and Ibrahim, W. H. (1995). "Estimation of infrastructure transition probabilities from condition rating data." J. Infrastruct. Syst., 1(2), 120-125.
    • (1995) J. Infrastruct. Syst. , vol.1 , Issue.2 , pp. 120-125
    • Madanat, S.M.1    Mishalani, R.2    Ibrahim, W.H.3
  • 17
    • 0036609782 scopus 로고    scopus 로고
    • Markov model for storm pipe deterioration
    • Micevski, T., Kuczera, G., and Coombes, P. (2002). "Markov model for storm pipe deterioration." J. Infrastract. Syst., 8(2), 49-56.
    • (2002) J. Infrastract. Syst. , vol.8 , Issue.2 , pp. 49-56
    • Micevski, T.1    Kuczera, G.2    Coombes, P.3
  • 18
    • 0002732121 scopus 로고    scopus 로고
    • Hybrid real options valuation of risky product development projects
    • Neely, J., and de Neufville, R. (2001). "Hybrid real options valuation of risky product development projects." Int. J. Technol. Policy Manage., 1(1), 29-46.
    • (2001) Int. J. Technol. Policy Manage. , vol.1 , Issue.1 , pp. 29-46
    • Neely, J.1    de Neufville, R.2
  • 19
    • 1942459594 scopus 로고    scopus 로고
    • Land speculation as a cause of deforestation: The role of cattle ranching in the humid tropics of Costa Rica
    • Environmental Economics and Natural Resources Group, Wageningen Univ., Wageningen, The Netherlands
    • Roebeling, P. C., and Hendrix, E. M. T. (2002). "Land speculation as a cause of deforestation: The role of cattle ranching in the humid tropics of Costa Rica." Proc., Conf. on Risk and Uncertainty in Environmental and Resource Economics, Environmental Economics and Natural Resources Group, Wageningen Univ., Wageningen, The Netherlands.
    • (2002) Proc., Conf. on Risk and Uncertainty in Environmental and Resource Economics
    • Roebeling, P.C.1    Hendrix, E.M.T.2
  • 21
    • 1942523950 scopus 로고    scopus 로고
    • Washington State Department of Transportation
    • Washington State Department of Transportation. (2002). "Highway construction cost comparison survey: Final report." www.wsdot.wa.gov/biz/construction/constructioncosts.htm
    • (2002) Highway Construction Cost Comparison Survey: Final Report
  • 23
    • 1942427721 scopus 로고    scopus 로고
    • Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results
    • Zayed, T. M., Chang, L.-M., and Fricker, J. D. (2002). "Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results." J. Perform. Constr. Facil., 16(2), 63-74.
    • (2002) J. Perform. Constr. Facil. , vol.16 , Issue.2 , pp. 63-74
    • Zayed, T.M.1    Chang, L.-M.2    Fricker, J.D.3
  • 25
    • 0141856372 scopus 로고    scopus 로고
    • Valuing flexibility in infrastructure expansion
    • Zhao, T., and Tseng, C.-L. (2003). "Valuing flexibility in infrastructure expansion." J. Infrastruct. Syst., 9(3), 89-97.
    • (2003) J. Infrastruct. Syst. , vol.9 , Issue.3 , pp. 89-97
    • Zhao, T.1    Tseng, C.-L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.