메뉴 건너뛰기




Volumn 125, Issue 3, 1999, Pages 204-209

Optimal bid model for price-time biparameter construction contracts

Author keywords

[No Author keywords available]

Indexed keywords

COMPETITION; CONSTRUCTION; CONTRACTS; COSTS; MATHEMATICAL MODELS; OPTIMIZATION;

EID: 0032659895     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:3(204)     Document Type: Article
Times cited : (39)

References (8)
  • 6
    • 0029469924 scopus 로고
    • Time is money: Innovative contracting methods in highway construction
    • ASCE
    • Herbsman, Z. J., Chen, W. T., and Epstein, W. C. (1995). "Time is money: Innovative contracting methods in highway construction." J. Constr. Engrg. and Mgmt., ASCE, 121(3), 273-281.
    • (1995) J. Constr. Engrg. and Mgmt. , vol.121 , Issue.3 , pp. 273-281
    • Herbsman, Z.J.1    Chen, W.T.2    Epstein, W.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.