메뉴 건너뛰기




Volumn 30, Issue 4, 2006, Pages 727-738

A decision support system for production scheduling in an ion plating cell

Author keywords

Genetic algorithms; Ion plating; Machine loading; Production scheduling

Indexed keywords

GENETIC ALGORITHMS; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING; STRATEGIC PLANNING;

EID: 33144464479     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2005.07.032     Document Type: Article
Times cited : (31)

References (40)
  • 2
    • 4944232011 scopus 로고    scopus 로고
    • A simulated annealing algorithm for multi-agent systems: A job-shop scheduling application
    • M.E. Aydin, and T.C. Fogarty A simulated annealing algorithm for multi-agent systems: A job-shop scheduling application Journal of Intelligent Manufacturing 15 2004 805 814
    • (2004) Journal of Intelligent Manufacturing , vol.15 , pp. 805-814
    • Aydin, M.E.1    Fogarty, T.C.2
  • 3
    • 3543134227 scopus 로고    scopus 로고
    • A multiple criterion model for machine scheduling
    • K.R. Baker, and J.C. Smith A multiple criterion model for machine scheduling Journal of Scheduling 6 2003 7 16
    • (2003) Journal of Scheduling , vol.6 , pp. 7-16
    • Baker, K.R.1    Smith, J.C.2
  • 4
    • 0022663475 scopus 로고
    • Generalized multi-period MIP model for production scheduling and processing facilities selection and location
    • R.W. Barbaro, and R.V. Ramani Generalized multi-period MIP model for production scheduling and processing facilities selection and location Mining Engineering 38 2 1986 107 114
    • (1986) Mining Engineering , vol.38 , Issue.2 , pp. 107-114
    • Barbaro, R.W.1    Ramani, R.V.2
  • 5
    • 4944252227 scopus 로고    scopus 로고
    • Using multiple objective tabu search and grammars to model and solve multi-objective flexible job-shop scheduling problems
    • A. Baykasoglu, L. Ozbakir, and A.I. Sonmez Using multiple objective tabu search and grammars to model and solve multi-objective flexible job-shop scheduling problems Journal of Intelligent Manufacturing 15 2004 777 785
    • (2004) Journal of Intelligent Manufacturing , vol.15 , pp. 777-785
    • Baykasoglu, A.1    Ozbakir, L.2    Sonmez, A.I.3
  • 6
    • 4744340734 scopus 로고    scopus 로고
    • Flow-shop scheduling for three serial stations with the last two duplicate
    • A. Bolat, I. Al-Harkan, and B. Al-Harbi Flow-shop scheduling for three serial stations with the last two duplicate Computers & Operations Research 32 2005 647 667
    • (2005) Computers & Operations Research , vol.32 , pp. 647-667
    • Bolat, A.1    Al-Harkan, I.2    Al-Harbi, B.3
  • 8
    • 3042840546 scopus 로고    scopus 로고
    • Simultaneous job scheduling and resource allocation on parallel machines
    • Z.L. Chen Simultaneous job scheduling and resource allocation on parallel machines Annals of Operations Research 129 2004 135 153
    • (2004) Annals of Operations Research , vol.129 , pp. 135-153
    • Chen, Z.L.1
  • 9
    • 0035565786 scopus 로고    scopus 로고
    • Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times
    • W. Cheung, and H. Zhou Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times Annals of Operations Research 107 2001 65 81
    • (2001) Annals of Operations Research , vol.107 , pp. 65-81
    • Cheung, W.1    Zhou, H.2
  • 11
    • 0030174048 scopus 로고    scopus 로고
    • A hybrid grouping genetic algorithms for bin packing
    • E. Falkenauer A hybrid grouping genetic algorithms for bin packing Journal of Heuristics 2 1996 5 30
    • (1996) Journal of Heuristics , vol.2 , pp. 5-30
    • Falkenauer, E.1
  • 14
  • 16
    • 0031146510 scopus 로고    scopus 로고
    • Production scheduling in almost continuous time
    • K.R. Gue, G.L. Nemhauser, and M. Padron Production scheduling in almost continuous time IIE Transactions 29 1997 391 398
    • (1997) IIE Transactions , vol.29 , pp. 391-398
    • Gue, K.R.1    Nemhauser, G.L.2    Padron, M.3
  • 19
    • 0037410521 scopus 로고    scopus 로고
    • Algorithms for the variable sized bin packing problem
    • J. Kang, and S. Park Algorithms for the variable sized bin packing problem European Journal of Operational Research 147 2003 365 372
    • (2003) European Journal of Operational Research , vol.147 , pp. 365-372
    • Kang, J.1    Park, S.2
  • 21
    • 0042021869 scopus 로고    scopus 로고
    • Job-shop scheduling with processing alternatives
    • T. Kis Job-shop scheduling with processing alternatives European Journal of Operational Research 151 2003 307 332
    • (2003) European Journal of Operational Research , vol.151 , pp. 307-332
    • Kis, T.1
  • 22
    • 0037448810 scopus 로고    scopus 로고
    • Using genetic algorithms for single machine bicriteria scheduling problems
    • M. Koksalan, and A.B. Keha Using genetic algorithms for single machine bicriteria scheduling problems European Journal of Operational Research 145 2003 543 556
    • (2003) European Journal of Operational Research , vol.145 , pp. 543-556
    • Koksalan, M.1    Keha, A.B.2
  • 23
    • 5144232432 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using metaheuristics
    • T. Loukil, J. Teghem, and D. Tuyttens Solving multi-objective production scheduling problems using metaheuristics European Journal of Operational Research 161 1 2005 42 61
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 42-61
    • Loukil, T.1    Teghem, J.2    Tuyttens, D.3
  • 24
    • 0742319169 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job shop scheduling with tardiness objectives
    • D.C. Mattfeld, and C. Bierwirth An efficient genetic algorithm for job shop scheduling with tardiness objectives European Journal of Operational Research 155 2004 616 630
    • (2004) European Journal of Operational Research , vol.155 , pp. 616-630
    • Mattfeld, D.C.1    Bierwirth, C.2
  • 25
    • 12844258828 scopus 로고    scopus 로고
    • Physical vapor deposition (PVD) processes
    • D.M. Mattox Physical vapor deposition (PVD) processes Metal Finishing 98 1 2000 410 423
    • (2000) Metal Finishing , vol.98 , Issue.1 , pp. 410-423
    • Mattox, D.M.1
  • 27
    • 0033317358 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the single machine scheduling problem
    • D.M. Miller, H. Chen, J. Matson, and Q. Liu A hybrid genetic algorithm for the single machine scheduling problem Journal of Heuristics 5 1999 437 454
    • (1999) Journal of Heuristics , vol.5 , pp. 437-454
    • Miller, D.M.1    Chen, H.2    Matson, J.3    Liu, Q.4
  • 28
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • N. Morad, and A. Zalzala Genetic algorithms in integrated process planning and scheduling Journal of Intelligent Manufacturing 10 1999 169 179
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 29
    • 0037410951 scopus 로고    scopus 로고
    • Single machine scheduling with a variable common due date and resource-dependent processing times
    • C.T. Ng, T.C. Cheng, M.Y. Kovalyov, and S.S. Lam Single machine scheduling with a variable common due date and resource-dependent processing times Computers & Operations Research 30 2003 1173 1185
    • (2003) Computers & Operations Research , vol.30 , pp. 1173-1185
    • Ng, C.T.1    Cheng, T.C.2    Kovalyov, M.Y.3    Lam, S.S.4
  • 30
    • 0346093876 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the job shop scheduling problems
    • B.J. Park, H.R. Choi, and H.S. Kim A hybrid genetic algorithm for the job shop scheduling problems Computers & Industrial Engineering 45 2003 597 613
    • (2003) Computers & Industrial Engineering , vol.45 , pp. 597-613
    • Park, B.J.1    Choi, H.R.2    Kim, H.S.3
  • 31
    • 0034316129 scopus 로고    scopus 로고
    • Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications
    • S. Rahimifard, and S.T. Newman Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications Journal of Materials Processing Technology 107 2000 450 458
    • (2000) Journal of Materials Processing Technology , vol.107 , pp. 450-458
    • Rahimifard, S.1    Newman, S.T.2
  • 32
    • 0031275801 scopus 로고    scopus 로고
    • Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • H.K. Roh, and Y.D. Kim Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter International Journal of Production Research 35 11 1997 2989 3003
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 2989-3003
    • Roh, H.K.1    Kim, Y.D.2
  • 33
    • 0029406326 scopus 로고
    • The role of discrete event simulation techniques in finite capacity scheduling
    • R. Roy, and S.E. Meikle The role of discrete event simulation techniques in finite capacity scheduling Journal of the Operational Research Society 46 1995 1310 1321
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 1310-1321
    • Roy, R.1    Meikle, S.E.2
  • 34
    • 0041742181 scopus 로고    scopus 로고
    • Genetic algorithms to minimize the weighted number of late jobs on a single machine
    • M. Sevauz, and S. Dauzere-Peres Genetic algorithms to minimize the weighted number of late jobs on a single machine European Journal of Operational Research 151 2003 296 306
    • (2003) European Journal of Operational Research , vol.151 , pp. 296-306
    • Sevauz, M.1    Dauzere-Peres, S.2
  • 36
    • 0034692672 scopus 로고    scopus 로고
    • Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
    • M.K. Tiwari, and N.K. Vidyarthi Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach International Journal of Production Research 38 14 2000 3357 3384
    • (2000) International Journal of Production Research , vol.38 , Issue.14 , pp. 3357-3384
    • Tiwari, M.K.1    Vidyarthi, N.K.2
  • 37
    • 0036778940 scopus 로고    scopus 로고
    • A genetic algorithm to minimize maximum lateness on a batch processing machine
    • C.S. Wang, and R. Uzsoy A genetic algorithm to minimize maximum lateness on a batch processing machine Computers & Operations Research 29 2002 1621 1640
    • (2002) Computers & Operations Research , vol.29 , pp. 1621-1640
    • Wang, C.S.1    Uzsoy, R.2
  • 38
    • 0043234613 scopus 로고    scopus 로고
    • Modeling and analysis for multi-period, multi-product and multi-resource production scheduling
    • H.F. Wang, and K.Y. Wu Modeling and analysis for multi-period, multi-product and multi-resource production scheduling Journal of Intelligent Manufacturing 14 2003 297 309
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 297-309
    • Wang, H.F.1    Wu, K.Y.2
  • 39
    • 0141741168 scopus 로고    scopus 로고
    • Machining process sequencing with fuzzy expert system and genetic algorithms
    • T.N. Wong, L.C.F. Chan, and H.C.W. Lau Machining process sequencing with fuzzy expert system and genetic algorithms Engineering with Computers (London) 19 2-3 2003 191 202
    • (2003) Engineering with Computers (London) , vol.19 , Issue.2-3 , pp. 191-202
    • Wong, T.N.1    Chan, L.C.F.2    Lau, H.C.W.3
  • 40
    • 0041732082 scopus 로고    scopus 로고
    • Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
    • Y. Yi, and D.W. Wang Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines Journal of Intelligent Manufacturing 14 2003 311 322
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 311-322
    • Yi, Y.1    Wang, D.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.