Volumn 14, Issue 3-4, 2003, Pages 311-322

Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines

Author keywords

Fuzzy decision; Fuzzy logic; Genetic algorithm; Scheduling with batch setup times on parallel machines; Setup times; Soft computing

Indexed keywords

FUZZY SETS; GENETIC ALGORITHMS; PROBLEM SOLVING; SCHEDULING;

EID: 0041732082     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1024697625512     Document Type: Article
Times cited : (31)

References (29)
  • 1
    • 0041890926 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K. R. and Scudder, G. (1987) Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 26-36.
    • (1987) Operations Research , vol.38 , pp. 26-36
    • Baker, K.R.1    Scudder, G.2
  • 2
    • 0028464285 scopus 로고
    • A study of genetic crossover operations on the facilities layout problem
    • Chan, K. C. and Tansri, H. (1994) A study of genetic crossover operations on the facilities layout problem. Computers and Industry Engineering, 26, 537-550.
    • (1994) Computers and Industry Engineering , vol.26 , pp. 537-550
    • Chan, K.C.1    Tansri, H.2
  • 3
    • 0031078986 scopus 로고    scopus 로고
    • Scheduling with batch setup times and earliness-tardiness penalties
    • Chen, Z. (1997) Scheduling with batch setup times and earliness-tardiness penalties. European Journal of Operational Research, 3, 518-537.
    • (1997) European Journal of Operational Research , vol.3 , pp. 518-537
    • Chen, Z.1
  • 4
    • 0030216821 scopus 로고    scopus 로고
    • Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
    • Chen, A. (1996) Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. European Journal of Operation Research, 93, 49-60.
    • (1996) European Journal of Operation Research , vol.93 , pp. 49-60
    • Chen, A.1
  • 5
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E. and Gupta, M. C. (1989) Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 6
    • 0028445470 scopus 로고
    • Parallel machine scheduling with earliness and tardiness penalties
    • Cheng, E. and Chen, Z. L. (1994) Parallel machine scheduling with earliness and tardiness penalties. Journal of Operational Research Society, 45, 685-695.
    • (1994) Journal of Operational Research Society , vol.45 , pp. 685-695
    • Cheng, E.1    Chen, Z.L.2
  • 8
    • 0027542554 scopus 로고
    • Single-machine scheduling with early tardy completion costs
    • Davis, J. S. and Kanet, J. J. (1993) Single-machine scheduling with early tardy completion costs. Naval Research Logistics, 40, 85-101.
    • (1993) Naval Research Logistics , vol.40 , pp. 85-101
    • Davis, J.S.1    Kanet, J.J.2
  • 9
    • 0027886805 scopus 로고
    • Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
    • Federgruen, A. and Mosheiov, G. (1993) Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems. Naval Research Logistics, 40, 951-970.
    • (1993) Naval Research Logistics , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 10
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common duedate
    • Hall, N. and Poster, M. (1991) Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common duedate. Operations Research, 39, 836-846.
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.1    Poster, M.2
  • 11
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
    • Hall, N. G., Kubiak, W. and Sethi, S. P. (1991) Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date. Operations Research, 39, 847-856.
    • (1991) Operations Research , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 12
    • 0027906623 scopus 로고
    • On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
    • Herman, J. and Lee, C. (1993) On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date. Operational Research, 70, 272-288.
    • (1993) Operational Research , vol.70 , pp. 272-288
    • Herman, J.1    Lee, C.2
  • 13
    • 0024714857 scopus 로고
    • Group technology in the US manufacturing industry: A survey of current practices
    • Hyer, N. l. and Wemmerlov, U. (1989) Group technology in the US manufacturing industry: A survey of current practices. International Journal of Production Research, 27, 1287-1304.
    • (1989) International Journal of Production Research , vol.27 , pp. 1287-1304
    • Hyer, N.L.1    Wemmerlov, U.2
  • 14
    • 0032021416 scopus 로고    scopus 로고
    • On fuzzy logic applications for automatic control, supervision, and fault diagnosis
    • Isermann, R. (1998) On fuzzy logic applications for automatic control, supervision, and fault diagnosis. IEEE Transaction, on SMC Part A: Systems and Human, 28, 221-235.
    • (1998) IEEE Transaction, on SMC Part A: Systems and Human , vol.28 , pp. 221-235
    • Isermann, R.1
  • 15
    • 0042392123 scopus 로고
    • Minimizing the average diviation of job completion times about a common due date
    • Kanet, J. (1981) Minimizing the average diviation of job completion times about a common due date. Naval Research Logistics, 3, 76-91.
    • (1981) Naval Research Logistics , vol.3 , pp. 76-91
    • Kanet, J.1
  • 16
    • 0025897854 scopus 로고
    • Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
    • Lee, C., Danusaputro, S. and Lin, C. (1991) Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date. Computers and Operations Research, 18, 379-389.
    • (1991) Computers and Operations Research , vol.18 , pp. 379-389
    • Lee, C.1    Danusaputro, S.2    Lin, C.3
  • 17
    • 0028377693 scopus 로고
    • The parallel machine min-max weighted absolute lateness scheduling problem
    • Li, C. and Cheng, T. (1994) The parallel machine min-max weighted absolute lateness scheduling problem. Noval Res. Log. Qua, 41, 33-36.
    • (1994) Noval Res. Log. Qua , vol.41 , pp. 33-36
    • Li, C.1    Cheng, T.2
  • 18
    • 0001057578 scopus 로고
    • Error bound of a heuristic for the common due date scheduling problem
    • Liman, S. and Lee, C. (1993) Error bound of a heuristic for the common due date scheduling problem. ORSA Journal on Computing, 5, 420-425.
    • (1993) ORSA Journal on Computing , vol.5 , pp. 420-425
    • Liman, S.1    Lee, C.2
  • 19
    • 0024736520 scopus 로고
    • On the complexity of scheduling with batch setup times
    • Monma, C. L. and Potts, C. N. (1989) On the complexity of scheduling with batch setup times. Operations Research, 37, 798-804.
    • (1989) Operations Research , vol.37 , pp. 798-804
    • Monma, C.L.1    Potts, C.N.2
  • 20
    • 0032670741 scopus 로고    scopus 로고
    • A practical scheduling method for multiclass production systems with setups
    • Olsen, T. L. (1999) A practical scheduling method for multiclass production systems with setups. Management Science, 45, 116-130.
    • (1999) Management Science , vol.45 , pp. 116-130
    • Olsen, T.L.1
  • 22
    • 84974861854 scopus 로고
    • Integrating scheduling with batch and lot-sizing: A review of algorithms and complexity
    • Potts, C. N. and Wassenhove, L. V. (1992) Integrating scheduling with batch and lot-sizing: A review of algorithms and complexity. Journal of Operations Research Society, 43, 395-406.
    • (1992) Journal of Operations Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Wassenhove, L.V.2
  • 23
    • 0019089428 scopus 로고
    • A dynamic programming approach for sequencing groups of identical jobs
    • Psaraftis, H. N. (1980) A dynamic programming approach for sequencing groups of identical jobs. Operations Research, 28, 1347-1359.
    • (1980) Operations Research , vol.28 , pp. 1347-1359
    • Psaraftis, H.N.1
  • 24
    • 0026945872 scopus 로고
    • A single machine scheduling problem with earliness-tardiness and starting time penalties under a common due date
    • Sung, C. and Joo, U. (1992) A single machine scheduling problem with earliness-tardiness and starting time penalties under a common due date. Computer and Operations Research, 19, 757-766.
    • (1992) Computer and Operations Research , vol.19 , pp. 757-766
    • Sung, C.1    Joo, U.2
  • 26
    • 0003162370 scopus 로고    scopus 로고
    • Fuzzy rule quantification and its application in fuzzy due-date bargaining
    • Taiwan, August
    • Wang, D. W. (1999) Fuzzy rule quantification and its application in fuzzy due-date bargaining, Proceeding of IFSA Congress 1999, Taiwan, August.
    • (1999) Proceeding of IFSA Congress 1999
    • Wang, D.W.1
  • 27
    • 0032592171 scopus 로고    scopus 로고
    • Scheduling grouped jobs on single machine with genetic algorithm
    • Wang, D. W. (1999) Scheduling grouped jobs on single machine with genetic algorithm. Computers and Industrial Engineering, 36, 309-324.
    • (1999) Computers and Industrial Engineering , vol.36 , pp. 309-324
    • Wang, D.W.1
  • 28
    • 0035325544 scopus 로고    scopus 로고
    • A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment
    • Wang, D. W., Yung, K. L. and Ip, W. H. (2001) A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment, IEEE Transactions on SMC Part C: Applications and Reviews, 31, 189-198.
    • (2001) IEEE Transactions on SMC Part C: Applications and Reviews , vol.31 , pp. 189-198
    • Wang, D.W.1    Yung, K.L.2    Ip, W.H.3
  • 29
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster, S. and Baker, K. R. (1995) Scheduling groups of jobs on a single machine. Operations Research, 43, 692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.