-
1
-
-
0029772740
-
An integrated decision support system for FMS production planning and scheduling problems
-
Jang S.Y., Park J., Park N. An integrated decision support system for FMS production planning and scheduling problems. Int. J. Adv. Manuf. Technol. 11(2):1996;101-110.
-
(1996)
Int. J. Adv. Manuf. Technol.
, vol.11
, Issue.2
, pp. 101-110
-
-
Jang, S.Y.1
Park, J.2
Park, N.3
-
3
-
-
0343699912
-
Design of scheduling system for flexible manufacturing cells
-
Chan D.Y., Bedworth D.D. Design of scheduling system for flexible manufacturing cells. Int. J. Product. Res. 28(11):1990;2037-2049.
-
(1990)
Int. J. Product. Res.
, vol.28
, Issue.11
, pp. 2037-2049
-
-
Chan, D.Y.1
Bedworth, D.D.2
-
4
-
-
0027591340
-
A synthesis of decision models for the tool management in automated manufacturing
-
Gray A.E., Seidmann A., Stecke K.E. A synthesis of decision models for the tool management in automated manufacturing. Mgmt. Sci. 39(5):1993;549-567.
-
(1993)
Mgmt. Sci.
, vol.39
, Issue.5
, pp. 549-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
6
-
-
0343264298
-
Planning and control of tool and cutter grinding in manufacturing systems
-
G. Petuelli, U. Muller, Planning and control of tool and cutter grinding in manufacturing systems, in: Proceedings of the Third International Conference of Computer Integrated Manufacturing, Vol. 1, 1995, pp. 795-801.
-
(1995)
In: Proceedings of the Third International Conference of Computer Integrated Manufacturing
, vol.1
, pp. 795-801
-
-
Petuelli, G.1
Muller, U.2
-
7
-
-
0032121744
-
Part type selection, machine loading and part type volume determination problems in FMS planning
-
Nayak G.K., Acharya D. Part type selection, machine loading and part type volume determination problems in FMS planning. Int. J. Product. Res. 36(7):1998;1801-1824.
-
(1998)
Int. J. Product. Res.
, vol.36
, Issue.7
, pp. 1801-1824
-
-
Nayak, G.K.1
Acharya, D.2
-
8
-
-
0032187951
-
Iterative procedures for multi-period order selection and loading problems flexible manufacturing systems
-
Lee D.-H., Kim Y.-D. Iterative procedures for multi-period order selection and loading problems flexible manufacturing systems. Int. J. Product. Res. 36(10):1998;2653-2668.
-
(1998)
Int. J. Product. Res.
, vol.36
, Issue.10
, pp. 2653-2668
-
-
Lee, D.-H.1
Kim, Y.-D.2
-
9
-
-
0029659077
-
Machine loading in flexible manufacturing systems considering routeing flexibility
-
Rajamani D., Adil G.K. Machine loading in flexible manufacturing systems considering routeing flexibility. Int. J. Adv. Manuf. Technol. 11(5):1996;372-380.
-
(1996)
Int. J. Adv. Manuf. Technol.
, vol.11
, Issue.5
, pp. 372-380
-
-
Rajamani, D.1
Adil, G.K.2
-
10
-
-
0343699908
-
Design, planning, scheduling and control problems of flexible manufacturing systems
-
in: M. Oliff (Ed.)
-
K.E. Stecke, Design, planning, scheduling and control problems of flexible manufacturing systems, in: M. Oliff (Ed.), Intelligent Manufacturing, 1988, pp. 189-198.
-
(1988)
Intelligent Manufacturing
, pp. 189-198
-
-
Stecke, K.E.1
-
11
-
-
0031197478
-
A heuristic solution approach to the machine loading problems of an FMS and its Petri net model
-
Tiwari M.K., Hazarika B. A heuristic solution approach to the machine loading problems of an FMS and its Petri net model. Int. J. Product. Res. 35(8):1997;2269-2284.
-
(1997)
Int. J. Product. Res.
, vol.35
, Issue.8
, pp. 2269-2284
-
-
Tiwari, M.K.1
Hazarika, B.2
-
13
-
-
0026219104
-
A review of multi-criterion approaches to FMS scheduling problems
-
Y.P. Gupta, G.W. Evans, M.C. Gupta, A review of multi-criterion approaches to FMS scheduling problems, Int. J. Product. Econim. (1991) 13-31.
-
(1991)
Int. J. Product. Econim.
, pp. 13-31
-
-
Gupta, Y.P.1
Evans, G.W.2
Gupta, M.C.3
-
16
-
-
0343264293
-
A real-time scheduling method using hierarchical decentralized decision makers for flexible manufacturing systems
-
Manchester, UK
-
K. Mori, M. Tsukiyama, T. Fukuda, A real-time scheduling method using hierarchical decentralized decision makers for flexible manufacturing systems, in: Proceedings of the 30th International Matador Conference, Manchester, UK, 1993, pp. 719-726.
-
(1993)
In: Proceedings of the 30th International Matador Conference
, pp. 719-726
-
-
Mori, K.1
Tsukiyama, M.2
Fukuda, T.3
-
17
-
-
0343699904
-
Real-time routing selection in flexible manufacturing systems
-
Manchester, UK
-
M.P. Fanti, E. Lo Valvo, M. Piacentini, G. Piscitelli, Real-time routing selection in flexible manufacturing systems, in: Proceedings of the 30th International Matador Conference, Manchester, UK, 1993, pp. 727-732.
-
(1993)
In: Proceedings of the 30th International Matador Conference
, pp. 727-732
-
-
Fanti, M.P.1
Lo Valvo, E.2
Piacentini, M.3
Piscitelli, G.4
-
18
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
Chandar J., Talavage J. Intelligent dispatching for flexible manufacturing. Int. J. Product. Res. 29(11):1991;2259-2278.
-
(1991)
Int. J. Product. Res.
, vol.29
, Issue.11
, pp. 2259-2278
-
-
Chandar, J.1
Talavage, J.2
-
19
-
-
0028015322
-
Clustering methods for production planning and scheduling in a FMS
-
Macchiaroli R., Riemma S. Clustering methods for production planning and scheduling in a FMS. IEEE Trans. Robotics Automation. 4:1994;3155-3160.
-
(1994)
IEEE Trans. Robotics Automation
, vol.4
, pp. 3155-3160
-
-
Macchiaroli, R.1
Riemma, S.2
-
20
-
-
3543123589
-
Comparative analysis of group scheduling heuristics in a flow shop cellular system
-
Leu B.-Y., Nazemetz J.W. Comparative analysis of group scheduling heuristics in a flow shop cellular system. Int. J. Oper. Product. Mgmt. 15(9):1995;143-157.
-
(1995)
Int. J. Oper. Product. Mgmt.
, vol.15
, Issue.9
, pp. 143-157
-
-
Leu, B.-Y.1
Nazemetz, J.W.2
-
21
-
-
0001719397
-
The formation of subfamilies for machine loading of flow-line cells
-
Solomon M.M., Millen R.A., Afentakis P. The formation of subfamilies for machine loading of flow-line cells. Int. J. Product. Res. 33(9):1995;2357-2374.
-
(1995)
Int. J. Product. Res.
, vol.33
, Issue.9
, pp. 2357-2374
-
-
Solomon, M.M.1
Millen, R.A.2
Afentakis, P.3
-
22
-
-
0032131897
-
Heuristics for minimising tool switches when scheduling part types on a flexible machine
-
Hertz A., Laporte G. Heuristics for minimising tool switches when scheduling part types on a flexible machine. IIE Trans. 30(8):1998;689-694.
-
(1998)
IIE Trans.
, vol.30
, Issue.8
, pp. 689-694
-
-
Hertz, A.1
Laporte, G.2
-
23
-
-
0030648334
-
An efficient heuristic approach to recognise the infeasibility of a loading problem
-
Hsu V.N., De Matta R. An efficient heuristic approach to recognise the infeasibility of a loading problem. Int. J. Flexible Manuf. Syst. 9(1):1997;31-50.
-
(1997)
Int. J. Flexible Manuf. Syst.
, vol.9
, Issue.1
, pp. 31-50
-
-
Hsu, V.N.1
De Matta, R.2
-
24
-
-
0343699899
-
-
Ph.D. Thesis, Loughborough University, Leicestershire, UK
-
S. Rahimifard, Multi-flow control of flexible machining cells, Ph.D. Thesis, Loughborough University, Leicestershire, UK, 1996.
-
(1996)
Multi-flow Control of Flexible Machining Cells
-
-
Rahimifard, S.1
|