메뉴 건너뛰기




Volumn 107, Issue 1-3, 2000, Pages 450-458

Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; BATCH DATA PROCESSING; COMPUTER APPLICATIONS; DATA STRUCTURES; JOB SATISFACTION; PRODUCTION ENGINEERING; SCADA SYSTEMS; SCHEDULING;

EID: 0034316129     PISSN: 09240136     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0924-0136(00)00719-6     Document Type: Article
Times cited : (8)

References (24)
  • 1
    • 0029772740 scopus 로고    scopus 로고
    • An integrated decision support system for FMS production planning and scheduling problems
    • Jang S.Y., Park J., Park N. An integrated decision support system for FMS production planning and scheduling problems. Int. J. Adv. Manuf. Technol. 11(2):1996;101-110.
    • (1996) Int. J. Adv. Manuf. Technol. , vol.11 , Issue.2 , pp. 101-110
    • Jang, S.Y.1    Park, J.2    Park, N.3
  • 3
    • 0343699912 scopus 로고
    • Design of scheduling system for flexible manufacturing cells
    • Chan D.Y., Bedworth D.D. Design of scheduling system for flexible manufacturing cells. Int. J. Product. Res. 28(11):1990;2037-2049.
    • (1990) Int. J. Product. Res. , vol.28 , Issue.11 , pp. 2037-2049
    • Chan, D.Y.1    Bedworth, D.D.2
  • 4
    • 0027591340 scopus 로고
    • A synthesis of decision models for the tool management in automated manufacturing
    • Gray A.E., Seidmann A., Stecke K.E. A synthesis of decision models for the tool management in automated manufacturing. Mgmt. Sci. 39(5):1993;549-567.
    • (1993) Mgmt. Sci. , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 5
    • 0027681460 scopus 로고
    • An integrated fixture planning and analysis system for machining processes
    • Fuh J.Y.H., Chang C.-H., Melkanoff M.A. An integrated fixture planning and analysis system for machining processes. Robotics Computer Integrated Manuf. 10(5):1993;339-353.
    • (1993) Robotics Computer Integrated Manuf. , vol.10 , Issue.5 , pp. 339-353
    • Fuh, J.Y.H.1    Chang, C.-H.2    Melkanoff, M.A.3
  • 7
    • 0032121744 scopus 로고    scopus 로고
    • Part type selection, machine loading and part type volume determination problems in FMS planning
    • Nayak G.K., Acharya D. Part type selection, machine loading and part type volume determination problems in FMS planning. Int. J. Product. Res. 36(7):1998;1801-1824.
    • (1998) Int. J. Product. Res. , vol.36 , Issue.7 , pp. 1801-1824
    • Nayak, G.K.1    Acharya, D.2
  • 8
    • 0032187951 scopus 로고    scopus 로고
    • Iterative procedures for multi-period order selection and loading problems flexible manufacturing systems
    • Lee D.-H., Kim Y.-D. Iterative procedures for multi-period order selection and loading problems flexible manufacturing systems. Int. J. Product. Res. 36(10):1998;2653-2668.
    • (1998) Int. J. Product. Res. , vol.36 , Issue.10 , pp. 2653-2668
    • Lee, D.-H.1    Kim, Y.-D.2
  • 9
    • 0029659077 scopus 로고    scopus 로고
    • Machine loading in flexible manufacturing systems considering routeing flexibility
    • Rajamani D., Adil G.K. Machine loading in flexible manufacturing systems considering routeing flexibility. Int. J. Adv. Manuf. Technol. 11(5):1996;372-380.
    • (1996) Int. J. Adv. Manuf. Technol. , vol.11 , Issue.5 , pp. 372-380
    • Rajamani, D.1    Adil, G.K.2
  • 10
    • 0343699908 scopus 로고
    • Design, planning, scheduling and control problems of flexible manufacturing systems
    • in: M. Oliff (Ed.)
    • K.E. Stecke, Design, planning, scheduling and control problems of flexible manufacturing systems, in: M. Oliff (Ed.), Intelligent Manufacturing, 1988, pp. 189-198.
    • (1988) Intelligent Manufacturing , pp. 189-198
    • Stecke, K.E.1
  • 11
    • 0031197478 scopus 로고    scopus 로고
    • A heuristic solution approach to the machine loading problems of an FMS and its Petri net model
    • Tiwari M.K., Hazarika B. A heuristic solution approach to the machine loading problems of an FMS and its Petri net model. Int. J. Product. Res. 35(8):1997;2269-2284.
    • (1997) Int. J. Product. Res. , vol.35 , Issue.8 , pp. 2269-2284
    • Tiwari, M.K.1    Hazarika, B.2
  • 13
    • 0026219104 scopus 로고
    • A review of multi-criterion approaches to FMS scheduling problems
    • Y.P. Gupta, G.W. Evans, M.C. Gupta, A review of multi-criterion approaches to FMS scheduling problems, Int. J. Product. Econim. (1991) 13-31.
    • (1991) Int. J. Product. Econim. , pp. 13-31
    • Gupta, Y.P.1    Evans, G.W.2    Gupta, M.C.3
  • 16
    • 0343264293 scopus 로고
    • A real-time scheduling method using hierarchical decentralized decision makers for flexible manufacturing systems
    • Manchester, UK
    • K. Mori, M. Tsukiyama, T. Fukuda, A real-time scheduling method using hierarchical decentralized decision makers for flexible manufacturing systems, in: Proceedings of the 30th International Matador Conference, Manchester, UK, 1993, pp. 719-726.
    • (1993) In: Proceedings of the 30th International Matador Conference , pp. 719-726
    • Mori, K.1    Tsukiyama, M.2    Fukuda, T.3
  • 18
    • 0026253933 scopus 로고
    • Intelligent dispatching for flexible manufacturing
    • Chandar J., Talavage J. Intelligent dispatching for flexible manufacturing. Int. J. Product. Res. 29(11):1991;2259-2278.
    • (1991) Int. J. Product. Res. , vol.29 , Issue.11 , pp. 2259-2278
    • Chandar, J.1    Talavage, J.2
  • 19
    • 0028015322 scopus 로고
    • Clustering methods for production planning and scheduling in a FMS
    • Macchiaroli R., Riemma S. Clustering methods for production planning and scheduling in a FMS. IEEE Trans. Robotics Automation. 4:1994;3155-3160.
    • (1994) IEEE Trans. Robotics Automation , vol.4 , pp. 3155-3160
    • Macchiaroli, R.1    Riemma, S.2
  • 20
    • 3543123589 scopus 로고
    • Comparative analysis of group scheduling heuristics in a flow shop cellular system
    • Leu B.-Y., Nazemetz J.W. Comparative analysis of group scheduling heuristics in a flow shop cellular system. Int. J. Oper. Product. Mgmt. 15(9):1995;143-157.
    • (1995) Int. J. Oper. Product. Mgmt. , vol.15 , Issue.9 , pp. 143-157
    • Leu, B.-Y.1    Nazemetz, J.W.2
  • 21
    • 0001719397 scopus 로고
    • The formation of subfamilies for machine loading of flow-line cells
    • Solomon M.M., Millen R.A., Afentakis P. The formation of subfamilies for machine loading of flow-line cells. Int. J. Product. Res. 33(9):1995;2357-2374.
    • (1995) Int. J. Product. Res. , vol.33 , Issue.9 , pp. 2357-2374
    • Solomon, M.M.1    Millen, R.A.2    Afentakis, P.3
  • 22
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimising tool switches when scheduling part types on a flexible machine
    • Hertz A., Laporte G. Heuristics for minimising tool switches when scheduling part types on a flexible machine. IIE Trans. 30(8):1998;689-694.
    • (1998) IIE Trans. , vol.30 , Issue.8 , pp. 689-694
    • Hertz, A.1    Laporte, G.2
  • 23
    • 0030648334 scopus 로고    scopus 로고
    • An efficient heuristic approach to recognise the infeasibility of a loading problem
    • Hsu V.N., De Matta R. An efficient heuristic approach to recognise the infeasibility of a loading problem. Int. J. Flexible Manuf. Syst. 9(1):1997;31-50.
    • (1997) Int. J. Flexible Manuf. Syst. , vol.9 , Issue.1 , pp. 31-50
    • Hsu, V.N.1    De Matta, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.