-
1
-
-
0032131027
-
Hybrid genetic algorithms for a multiple-objective scheduling problem
-
Cavalieri, S. and Gaiardelli, P. (1998) Hybrid genetic algorithms for a multiple-objective scheduling problem. Journal of Intelligent Manufacturing, 9, 361-367.
-
(1998)
Journal of Intelligent Manufacturing
, vol.9
, pp. 361-367
-
-
Cavalieri, S.1
Gaiardelli, P.2
-
2
-
-
0009489150
-
A parallel genetic neuro scheduler for job-shop scheduling
-
Jerusalem, Freund Publishing House, London
-
Dagli, C. H. and Lee, H. C. (1995) A parallel genetic neuro scheduler for job-shop scheduling, in Proceedings of the 13th International Conference on Production Research, Jerusalem, Freund Publishing House, London, pp. 602-604.
-
(1995)
Proceedings of the 13th International Conference on Production Research
, pp. 602-604
-
-
Dagli, C.H.1
Lee, H.C.2
-
3
-
-
0000150948
-
Job shop scheduling with genetic algorithms
-
Carnegie-Mellon University, Pittsburgh, PA, USA
-
Davis, L. (1985) Job shop scheduling with genetic algorithms, in Proceedings of the 1st International Conference on Genetic Algorithms and Their Applications, Carnegie-Mellon University, Pittsburgh, PA, USA, pp. 136-140.
-
(1985)
Proceedings of the 1st International Conference on Genetic Algorithms and Their Applications
, pp. 136-140
-
-
Davis, L.1
-
4
-
-
0029215084
-
Evolution based learning in a job shop environment
-
Dorndorf, U. and Pesch, E. (1995) Evolution based learning in a job shop environment. Computers & Operations Research, 22, 25-40.
-
(1995)
Computers & Operations Research
, vol.22
, pp. 25-40
-
-
Dorndorf, U.1
Pesch, E.2
-
5
-
-
0003011391
-
A promising genetic algorithm approach to job-shop scheduling, rescheduling and open-shop scheduling problems
-
Urbana, Illinois
-
Fang, H. L., Ross, P. and Corne, D. (1993) A promising genetic algorithm approach to job-shop scheduling, rescheduling and open-shop scheduling problems, in Proceedings of the 5th International Conference on Genetic Algorithm, Urbana, Illinois, pp. 375-382.
-
(1993)
Proceedings of the 5th International Conference on Genetic Algorithm
, pp. 375-382
-
-
Fang, H.L.1
Ross, P.2
Corne, D.3
-
6
-
-
0030676526
-
Rolling horizon job shop rescheduling strategy in the dynamic environment
-
Fang, J. and Xi, Y. (1997) Rolling horizon job shop rescheduling strategy in the dynamic environment. International Journal of Advanced Manufacturing Technology, 13(3), 227-232.
-
(1997)
International Journal of Advanced Manufacturing Technology
, vol.13
, Issue.3
, pp. 227-232
-
-
Fang, J.1
Xi, Y.2
-
8
-
-
0032599597
-
Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence
-
Ghedjati, F. (1999) Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence. Computers & Industrial Engineering, 37, 39-42.
-
(1999)
Computers & Industrial Engineering
, vol.37
, pp. 39-42
-
-
Ghedjati, F.1
-
9
-
-
0003722376
-
-
Addison-Wesley Publishing Company, Inc., MA
-
Goldberg, D. E. (1989) Genetic Algorithms in Search, Optimization, and Machine Learning, Addison-Wesley Publishing Company, Inc., MA.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
10
-
-
0031168629
-
Single process plan scheduling with genetic algorithms
-
Jain, A. K. and ElMaraghy, H. A. (1997) Single process plan scheduling with genetic algorithms. Production Planning and Control, 8(4), 363-376.
-
(1997)
Production Planning and Control
, vol.8
, Issue.4
, pp. 363-376
-
-
Jain, A.K.1
ElMaraghy, H.A.2
-
11
-
-
0031621321
-
A genetic algorithm for scheduling flexible manufacturing systems
-
Jawahar, N., Aravindan, P. and Ponnambalam, S. G. (1998) A genetic algorithm for scheduling flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 14, 588-607.
-
(1998)
International Journal of Advanced Manufacturing Technology
, vol.14
, pp. 588-607
-
-
Jawahar, N.1
Aravindan, P.2
Ponnambalam, S.G.3
-
13
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
MacCarthy, B. L. and Liu, J. Y. (1993) Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59-79.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
MacCarthy, B.L.1
Liu, J.Y.2
-
14
-
-
0030268892
-
Genetic algorithms: Concepts and applications
-
Man, Tang, K. S. and Kwong, S. (1996) Genetic algorithms: Concepts and applications. IEEE Transaction on Industrial Electronics, 43(5), 519-534.
-
(1996)
IEEE Transaction on Industrial Electronics
, vol.43
, Issue.5
, pp. 519-534
-
-
Man1
Tang, K.S.2
Kwong, S.3
-
15
-
-
0031192667
-
Genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori, M. and Tseng, C. C. (1997) Genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operation Research, 100(1), 134-141.
-
(1997)
European Journal of Operation Research
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
19
-
-
0012268829
-
Genetic algorithm in problem space for sequencing problems
-
Fandel et al. (eds.), Springer-Verlang Publisher
-
Storer, R. H. and Wu, S. D. (1993) Genetic algorithm in problem space for sequencing problems, Operations Research in Production, Planning and Control, Fandel et al. (eds.), Springer-Verlang Publisher, pp. 584-597.
-
(1993)
Operations Research in Production, Planning and Control
, pp. 584-597
-
-
Storer, R.H.1
Wu, S.D.2
-
21
-
-
0000086539
-
A genetic Algorithm applicable to large-scale job-shop problems
-
Brussels, Belgium, Manner and Manderick (eds.), Elsevier Science Publishers
-
Yamada, T. and Nakano, R. (1992) A genetic Algorithm applicable to large-scale job-shop problems, Parallel Problem Solving from Nature, 2nd Workshop, Brussels, Belgium, Manner and Manderick (eds.), Elsevier Science Publishers, pp. 281-290.
-
(1992)
Parallel Problem Solving from Nature, 2nd Workshop
, pp. 281-290
-
-
Yamada, T.1
Nakano, R.2
-
22
-
-
0029190021
-
A genetic algorithm with multi-step crossover for job-shop scheduling problems
-
University of Sheffield, UK
-
Yamada, T. and Nakano, R. (1995) A genetic algorithm with multi-step crossover for job-shop scheduling problems, in Proceedings of the 1st International Conference on Genetic Algorithms in Engineering Systems, Innovations and Applications, University of Sheffield, UK, pp. 146-151.
-
(1995)
Proceedings of the 1st International Conference on Genetic Algorithms in Engineering Systems, Innovations and Applications
, pp. 146-151
-
-
Yamada, T.1
Nakano, R.2
|