-
1
-
-
0027906633
-
Two parallel machine sequencing problems involving controllable job processing times
-
Alidaee, B. and A. Ahmadian. (1993). "Two Parallel Machine Sequencing Problems Involving Controllable Job Processing Times." European Journal of Operational Research 70, 335-341.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 335-341
-
-
Alidaee, B.1
Ahmadian, A.2
-
2
-
-
0006183587
-
A framework for machine scheduling problems with controllable processing times
-
Alidaee, B. and G. Kochenberger. (1996). "A Framework for Machine Scheduling Problems with Controllable Processing Times." Production and Operations Management 5(4), 391-405.
-
(1996)
Production and Operations Management
, vol.5
, Issue.4
, pp. 391-405
-
-
Alidaee, B.1
Kochenberger, G.2
-
3
-
-
0032154566
-
Machine scheduling, linear programming and list scheduling heuristics
-
Chan, L.M.A., A. Muriel, and D. Simchi-Levi. (1998). "Machine Scheduling, Linear Programming and List Scheduling Heuristics." Operations Research 46, 729-741.
-
(1998)
Operations Research
, vol.46
, pp. 729-741
-
-
Chan, L.M.A.1
Muriel, A.2
Simchi-Levi, D.3
-
4
-
-
0002823839
-
Single machine scheduling with discretely controllable processing times
-
Chen, Z.-L., Q. Lu, and G. Tang. (1997). "Single Machine Scheduling with Discretely Controllable Processing Times." Operations Research Letters 21, 69-76.
-
(1997)
Operations Research Letters
, vol.21
, pp. 69-76
-
-
Chen, Z.-L.1
Lu, Q.2
Tang, G.3
-
5
-
-
0006715283
-
Solving parallel machine scheduling problems by column generation
-
Chen, Z.-L. and W.B. Powell. (1999a). "Solving Parallel Machine Scheduling Problems by Column Generation." INFORMS Journal on Computing 11, 78-94.
-
(1999)
INFORMS Journal on Computing
, vol.11
, pp. 78-94
-
-
Chen, Z.-L.1
Powell, W.B.2
-
6
-
-
0032641373
-
A column generation based decomposition algorithm for a parallel machine scheduling just-in-time scheduling problem
-
Chen, Z.-L. and W.B. Powell. (1999b). "A Column Generation Based Decomposition Algorithm for a Parallel Machine Scheduling Just-in-Time Scheduling Problem." European Journal of Operational Research 116, 221-233.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 221-233
-
-
Chen, Z.-L.1
Powell, W.B.2
-
7
-
-
0000726721
-
Single-Machine scheduling with trade-off between number of tardy jobs and resource allocation
-
Cheng, T.C.E., Z.-L. Chen, and C.-L. Li. (1996). "Single-Machine Scheduling with Trade-Off between Number of Tardy Jobs and Resource Allocation." Operations Research Letters 19, 237-242.
-
(1996)
Operations Research Letters
, vol.19
, pp. 237-242
-
-
Cheng, T.C.E.1
Chen, Z.-L.2
Li, C.-L.3
-
8
-
-
0032001746
-
Scheduling to minimize the total compression and late costs
-
Cheng, T.C.E., Z.-L. Chen, C.-L. Li, and B.M.-T. Lin. (1998). "Scheduling to Minimize the Total Compression and Late Costs." Naval Research Logistics 45, 67-82.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 67-82
-
-
Cheng, T.C.E.1
Chen, Z.-L.2
Li, C.-L.3
Lin, B.M.-T.4
-
9
-
-
0029313350
-
Single machine batch scheduling with deadlines and resource dependent processing times
-
Cheng, T.C.E. and M.Y. Kovalyov. (1995). "Single Machine Batch Scheduling with Deadlines and Resource Dependent Processing Times." Operations Research Letters 17, 243-249.
-
(1995)
Operations Research Letters
, vol.17
, pp. 243-249
-
-
Cheng, T.C.E.1
Kovalyov, M.Y.2
-
10
-
-
0001691215
-
Scheduling parallel manufacturing cells with resource flexibility
-
Daniels, R.L., B.J. Hoopes, and J.B. Mazzola. (1996). "Scheduling Parallel Manufacturing Cells with Resource Flexibility." Management Science 42, 1260-1276.
-
(1996)
Management Science
, vol.42
, pp. 1260-1276
-
-
Daniels, R.L.1
Hoopes, B.J.2
Mazzola, J.B.3
-
11
-
-
0031527551
-
An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
-
Daniels, R.L., B.J. Hoopes, and J.B. Mazzola. (1997). "An Analysis of Heuristics for the Parallel-Machine Flexible-Resource Scheduling Problem." Annals of Operations Research 70, 439-472.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 439-472
-
-
Daniels, R.L.1
Hoopes, B.J.2
Mazzola, J.B.3
-
12
-
-
0028424243
-
Flow shop scheduling with resource flexibility
-
Daniels, R.L. and J.B. Mazzola. (1994). "Flow Shop Scheduling with Resource Flexibility." Operations Research 42, 504-522.
-
(1994)
Operations Research
, vol.42
, pp. 504-522
-
-
Daniels, R.L.1
Mazzola, J.B.2
-
13
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R.L., E.L. Lawler, J.K. Lenstra, and A.H.G. Rinnooy Kan. (1979). "Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey." Annals of Discrete Mathematics 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
14
-
-
0030263104
-
Single machine scheduling subject to deadlines and resource dependent processing times
-
Janiak, A. and M.Y. Kovalyov. (1996). "Single Machine Scheduling Subject to Deadlines and Resource Dependent Processing Times." European Journal of Operational Research 94, 284-291.
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 284-291
-
-
Janiak, A.1
Kovalyov, M.Y.2
-
15
-
-
0003037529
-
Reducibility among combinatorial problems
-
R.E. Miller and J.W. Thatcher (eds.). New York: Plenum
-
Karp, R.M. (1972). "Reducibility Among Combinatorial Problems." In R.E. Miller and J.W. Thatcher (eds.), Complexity of Computer Computations, pp. 85-103. New York: Plenum.
-
(1972)
Complexity of Computer Computations
, pp. 85-103
-
-
Karp, R.M.1
-
17
-
-
0034159705
-
Scheduling of jobs and maintenance activities on parallel machines
-
Lee, C.-Y. and Z.-L. Chen (2000). "Scheduling of Jobs and Maintenance Activities on Parallel Machines." Naval Research Logistics 47, 145-165.
-
(2000)
Naval Research Logistics
, vol.47
, pp. 145-165
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
18
-
-
0027906666
-
An approximation algorithm for the m-machine permutation flow shop scheduling problem with controllable processing times
-
Nowicki, E. (1993). "An Approximation Algorithm for the m-Machine Permutation Flow Shop Scheduling Problem with Controllable Processing Times." European Journal of Operational Research 70, 342-349.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 342-349
-
-
Nowicki, E.1
-
19
-
-
38249019311
-
A survey of results for sequencing problems with controllable processing times
-
Nowicki, E. and S. Zdrzalka. (1990). "A Survey of Results for Sequencing Problems with Controllable Processing Times." Discrete Applied Mathematics 25, 271-287.
-
(1990)
Discrete Applied Mathematics
, vol.25
, pp. 271-287
-
-
Nowicki, E.1
Zdrzalka, S.2
-
20
-
-
0000976158
-
A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times
-
Nowicki, E. and S. Zdrzalka. (1995). "A Bicriterion Approach to Preemptive Scheduling of Parallel Machines with Controllable Job Processing Times." Discrete Applied Mathematics 63, 237-256.
-
(1995)
Discrete Applied Mathematics
, vol.63
, pp. 237-256
-
-
Nowicki, E.1
Zdrzalka, S.2
-
23
-
-
0028383503
-
Scheduling multiple variable-speed machines
-
Trick, M.A. (1994). "Scheduling Multiple Variable-Speed Machines." Operations Research 42, 234-248.
-
(1994)
Operations Research
, vol.42
, pp. 234-248
-
-
Trick, M.A.1
-
26
-
-
0019058538
-
Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
-
Vickson, R.G. (1980a). "Choosing the Job Sequence and Processing Times to Minimize Processing Plus Flow Cost on a Single Machine." Operations Research 28, 1155-1167.
-
(1980)
Operations Research
, vol.28
, pp. 1155-1167
-
-
Vickson, R.G.1
-
27
-
-
0019055358
-
Two single-machine sequencing problems involving controllable job processing times
-
Vickson, R.G. (1980b). "Two Single-Machine Sequencing Problems Involving Controllable Job Processing Times." AIIE Transactions 12, 258-262.
-
(1980)
AIIE Transactions
, vol.12
, pp. 258-262
-
-
Vickson, R.G.1
-
28
-
-
0035426177
-
A 3/2-approximation algorithm for parallel machine scheduling with controllable processing times
-
Zhang, F., G. Tang, and Z.-L. Chen. (2001). "A 3/2-Approximation Algorithm for Parallel Machine Scheduling with Controllable Processing Times." Operations Research Letters 29, 41-47.
-
(2001)
Operations Research Letters
, vol.29
, pp. 41-47
-
-
Zhang, F.1
Tang, G.2
Chen, Z.-L.3
|