-
1
-
-
0242653680
-
Use of genetic algorithms to solve production and operations management problems: A review
-
References Aytug, H., Khouja, M. and Vergara, F.E., Use of genetic algorithms to solve production and operations management problems: a review. Int. J. Prod. Res., 2003, 41, 3955-4009.
-
(2003)
Int. J. Prod. Res.
, vol.41
, pp. 3955-4009
-
-
Aytug, H.1
Khouja, M.2
Vergara, F.E.3
-
2
-
-
0035342176
-
Perceived relevance and quality of POM journals: A decade later
-
Barman, S., Hanna, M.D. and Laforge, R.L., Perceived relevance and quality of POM journals: a decade later. J. Op. Manage., 2001, 19, 367-385.
-
(2001)
J. Op. Manage.
, vol.19
, pp. 367-385
-
-
Barman, S.1
Hanna, M.D.2
Laforge, R.L.3
-
3
-
-
0003908748
-
-
McGraw-Hill Irwin: New York, NY
-
Chase, R.B., Aquilano, N.J. and Jacobs, F.R., Operations Management for Competitive Advantage, 9th ed., 2001 (McGraw-Hill Irwin: New York, NY).
-
(2001)
Operations Management for Competitive Advantage, 9th Ed.
-
-
Chase, R.B.1
Aquilano, N.J.2
Jacobs, F.R.3
-
4
-
-
0034344602
-
Systems research, genetic algorithms, and information systems
-
Chaudhry, S.S., Varano, M.W. and Xu, L., Systems research, genetic algorithms, and information systems. Syst. Res. & Behav. Sci., 2000, 17, 149-162.
-
(2000)
Syst. Res. & Behav. Sci.
, vol.17
, pp. 149-162
-
-
Chaudhry, S.S.1
Varano, M.W.2
Xu, L.3
-
5
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using genetic algorithms. I. Representation
-
Cheng, R., Gen, M. and Tsujimura, Y., A tutorial survey of job-shop scheduling problems using genetic algorithms. I. Representation. Computers & Indust. Eng., 1996, 30, 983-997.
-
(1996)
Computers & Indust. Eng.
, vol.30
, pp. 983-997
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
6
-
-
0030124747
-
Genetic algorithms - A tool for OR?
-
Dowsland, K.A., Genetic algorithms - A tool for OR? J. Op. Res. Soc., 1996, 47, 550-561.
-
(1996)
J. Op. Res. Soc.
, vol.47
, pp. 550-561
-
-
Dowsland, K.A.1
-
7
-
-
27844580977
-
-
Palisade Corporation: Newfield, NY
-
Evolver, 1998 (Palisade Corporation: Newfield, NY).
-
(1998)
Evolver
-
-
-
8
-
-
0002336414
-
-
Ward Systems Group, Inc.: Frederick, MD
-
GeneHunter, 1995 (Ward Systems Group, Inc.: Frederick, MD).
-
(1995)
GeneHunter
-
-
-
9
-
-
0031144454
-
Evaluating and classifying POM journals
-
Goh, C.-H., Holsapple, C.W., Johnson, L.E. and Tanner, J.R., Evaluating and classifying POM journals. J. Op. Manage., 1997, 15, 123-138.
-
(1997)
J. Op. Manage.
, vol.15
, pp. 123-138
-
-
Goh, C.-H.1
Holsapple, C.W.2
Johnson, L.E.3
Tanner, J.R.4
-
11
-
-
0024928137
-
Expert systems and their applications in production and operations management
-
Gupta, Y.P. and Chin, D.C.W., Expert systems and their applications in production and operations management. Computers & Op. Res., 1989, 16, 567-582.
-
(1989)
Computers & Op. Res.
, vol.16
, pp. 567-582
-
-
Gupta, Y.P.1
Chin, D.C.W.2
-
13
-
-
0030491069
-
Expert systems in production and operations management: Current applications and future prospects
-
Jayaraman, V. and Srivastava, R., Expert systems in production and operations management: current applications and future prospects. Int. J. Op. & Prod. Manage., 1996, 16, 27-44.
-
(1996)
Int. J. Op. & Prod. Manage.
, vol.16
, pp. 27-44
-
-
Jayaraman, V.1
Srivastava, R.2
-
14
-
-
38249041231
-
Expert systems in production management: An assessment
-
Mertens, P. and Kanet, J.J., Expert systems in production management: an assessment. J. Op. Manage., 1986, 6, 393-404.
-
(1986)
J. Op. Manage.
, vol.6
, pp. 393-404
-
-
Mertens, P.1
Kanet, J.J.2
-
16
-
-
0032124247
-
Intelligent management systems in operations: A review
-
Proudlove, N.C., Vadera, S. and Kobbacy, K.A.H., Intelligent management systems in operations: a review. J. Op. Res. Soc., 1998, 49, 682-699.
-
(1998)
J. Op. Res. Soc.
, vol.49
, pp. 682-699
-
-
Proudlove, N.C.1
Vadera, S.2
Kobbacy, K.A.H.3
-
19
-
-
0032733797
-
Assessing production and operations management related journals: The European perspective
-
Soteriou, A.C., Hadjinicola, G.C. and Patsia, K., Assessing production and operations management related journals: the European perspective. J. Op. Manage., 1999, 17, 225-238.
-
(1999)
J. Op. Manage.
, vol.17
, pp. 225-238
-
-
Soteriou, A.C.1
Hadjinicola, G.C.2
Patsia, K.3
-
20
-
-
0032298790
-
Manpower allocation using genetic annealing
-
Bibliography Abboud, N., Inuiguchi, M., Sakawa, M. and Uemura, Y., Manpower allocation using genetic annealing. Euro. J. Op. Res., 1998, 111(2), 405-421.
-
(1998)
Euro. J. Op. Res.
, vol.111
, Issue.2
, pp. 405-421
-
-
Abboud, N.1
Inuiguchi, M.2
Sakawa, M.3
Uemura, Y.4
-
21
-
-
0032050759
-
A hybrid heuristic for the uncapacitated hub location problem
-
Abdinnour-Helm, S., A hybrid heuristic for the uncapacitated hub location problem. Euro. J. Op. Res., 1998, 106(2,3), 489-500.
-
(1998)
Euro. J. Op. Res.
, vol.106
, Issue.2-3
, pp. 489-500
-
-
Abdinnour-Helm, S.1
-
22
-
-
0034628950
-
A note on a genetic algorithm approach for multiple criteria facility layout design
-
Al-Hakim, L., A note on a genetic algorithm approach for multiple criteria facility layout design. Int. J. Prod. Res., 2000, 38(4), 985-989.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.4
, pp. 985-989
-
-
Al-Hakim, L.1
-
23
-
-
0034691901
-
On solving facility layout problems using genetic algorithms
-
Al-Hakim, L., On solving facility layout problems using genetic algorithms. Int. J. Prod. Res., 2000, 38(11), 2573-2582.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.11
, pp. 2573-2582
-
-
Al-Hakim, L.1
-
24
-
-
0035837941
-
An analogue genetic algorithm for solving job shop scheduling problems
-
Al-Hakim, L., An analogue genetic algorithm for solving job shop scheduling problems. Int. J. Prod. Res., 2001, 39(7), 1537-1548.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.7
, pp. 1537-1548
-
-
Al-Hakim, L.1
-
25
-
-
0035900038
-
An efficiency frontier approach for the design of cellular manufacturing systems in a lumpy demand environment
-
Arzi, Y., Bukchin, J. and Masin, M., An efficiency frontier approach for the design of cellular manufacturing systems in a lumpy demand environment. Euro. J. Op. Res., 2001, 134(2), 346-264.
-
(2001)
Euro. J. Op. Res.
, vol.134
, Issue.2
, pp. 346-1264
-
-
Arzi, Y.1
Bukchin, J.2
Masin, M.3
-
26
-
-
0029394716
-
A computer-aided process planning model based on genetic algorithms
-
Awadh, B., Sepehri, N. and Hawaleshka, O., A computer-aided process planning model based on genetic algorithms. Computers & Op. Res., 1995, 22(8), 841-856.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.8
, pp. 841-856
-
-
Awadh, B.1
Sepehri, N.2
Hawaleshka, O.3
-
27
-
-
0028516860
-
Genetic learning of dynamic scheduling within a simulation environment
-
Aytug, H., Koehler, G.J. and Snowdon, J.L., Genetic learning of dynamic scheduling within a simulation environment. Computers & Op. Res., 1994, 21(8), 909-925.
-
(1994)
Computers & Op. Res.
, vol.21
, Issue.8
, pp. 909-925
-
-
Aytug, H.1
Koehler, G.J.2
Snowdon, J.L.3
-
28
-
-
0033078286
-
Simulation optimisation with qualitative variables and structural model changes: A genetic algorithm approach
-
Azadivar, F. and Tompkins, G., Simulation optimisation with qualitative variables and structural model changes: a genetic algorithm approach. Euro. J. Op. Res., 1999, 113(1), 169-183.
-
(1999)
Euro. J. Op. Res.
, vol.113
, Issue.1
, pp. 169-183
-
-
Azadivar, F.1
Tompkins, G.2
-
29
-
-
0034694502
-
Facility layout optimisation using simulation and genetic algorithms
-
Azadivar, F. and Wang, J., Facility layout optimisation using simulation and genetic algorithms. Int. J. Prod. Res., 2000, 38(17), 4369-4383.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.17
, pp. 4369-4383
-
-
Azadivar, F.1
Wang, J.2
-
30
-
-
0033131702
-
Effective nesting of rectangular parts in multiple rectangular sheets using genetic and heuristic algorithms
-
Babu, A.R. and Babu, N.R., Effective nesting of rectangular parts in multiple rectangular sheets using genetic and heuristic algorithms. Int. J. Prod. Res., 1999, 37(7), 1625-1643.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.7
, pp. 1625-1643
-
-
Babu, A.R.1
Babu, N.R.2
-
31
-
-
0031104332
-
A comparison of a genetic algorithm with an experimental design technique in the optimisation of a production process
-
Backhouse, P.G., Fotheringham, A.F. and Allan, G., A comparison of a genetic algorithm with an experimental design technique in the optimisation of a production process. J. Op. Research Society, 1997, 48(3), 247-256.
-
(1997)
J. Op. Research Society
, vol.48
, Issue.3
, pp. 247-256
-
-
Backhouse, P.G.1
Fotheringham, A.F.2
Allan, G.3
-
32
-
-
0034003451
-
Genetic search and the dynamic layout problem
-
Balakrishnan, J. and Chen, C.H., Genetic search and the dynamic layout problem. Computers & Op. Res., 2000, 27, 587-593.
-
(2000)
Computers & Op. Res.
, vol.27
, pp. 587-593
-
-
Balakrishnan, J.1
Chen, C.H.2
-
33
-
-
0030215192
-
Genetic algorithms for product design
-
Balakrishnan, P.V. and Jacob, V.S., Genetic algorithms for product design. Manage. Sci., 1996, 42(8), 1105-1118.
-
(1996)
Manage. Sci.
, vol.42
, Issue.8
, pp. 1105-1118
-
-
Balakrishnan, P.V.1
Jacob, V.S.2
-
34
-
-
0033098932
-
Operation sequencing in CAPP using genetic algorithms
-
Bhaskara Reddy, S.V., Shunmugam, M.S. and Narendran, T.T., Operation sequencing in CAPP using genetic algorithms. Int. J. Prod. Res., 1999, 37(5), 1063-1074.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.5
, pp. 1063-1074
-
-
Bhaskara Reddy, S.V.1
Shunmugam, M.S.2
Narendran, T.T.3
-
35
-
-
0032388104
-
Learning by objectives for adaptive shop-floor scheduling
-
Bhattacharyya, S. and Koehler, G.J., Learning by objectives for adaptive shop-floor scheduling. Decision Sci., 1998, 29(2), 347-376.
-
(1998)
Decision Sci.
, vol.29
, Issue.2
, pp. 347-376
-
-
Bhattacharyya, S.1
Koehler, G.J.2
-
36
-
-
0025682531
-
Genetic algorithms and job shop scheduling
-
Biegel, J.E. and Davern, J.J., Genetic Algorithms and Job Shop Scheduling. Computers & Ind. Eng., 1990, 19, 81-91.
-
(1990)
Computers & Ind. Eng.
, vol.19
, pp. 81-91
-
-
Biegel, J.E.1
Davern, J.J.2
-
37
-
-
0030129864
-
Development of manufacturing control strategies using unsupervised machine learning
-
Bowden, R. and Bullington, S.F., Development of manufacturing control strategies using unsupervised machine learning. IIE Trans., 1996, 28, 319-331.
-
(1996)
IIE Trans.
, vol.28
, pp. 319-331
-
-
Bowden, R.1
Bullington, S.F.2
-
38
-
-
0035841887
-
CF-GGA: A grouping algorithm for the cell formation problem
-
Brown, E.C. and Sumichrast, R.T., CF-GGA: a grouping algorithm for the cell formation problem. Int. J. Prod. Res., 2001, 39(16), 3651-3669.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.16
, pp. 3651-3669
-
-
Brown, E.C.1
Sumichrast, R.T.2
-
39
-
-
0001147217
-
Buffer size optimisation in asynchronous assembly systems using genetic algorithms
-
Bulgak, A.A., Diwan, P.D. and Inozu, B., Buffer size optimisation in asynchronous assembly systems using genetic algorithms. Computers & Ind. Eng., 1995, 28(2), 309-322.
-
(1995)
Computers & Ind. Eng.
, vol.28
, Issue.2
, pp. 309-322
-
-
Bulgak, A.A.1
Diwan, P.D.2
Inozu, B.3
-
40
-
-
0033705901
-
A genetic algorithm for scheduling staff of mixed skills under multicriteria
-
Cai, X. and Li, K.N., A genetic algorithm for scheduling staff of mixed skills under multicriteria. Euro. J. Op. Res., 2000, 125(2), 359-369.
-
(2000)
Euro. J. Op. Res.
, vol.125
, Issue.2
, pp. 359-369
-
-
Cai, X.1
Li, K.N.2
-
41
-
-
0032295711
-
A genetic algorithm based procedure for more realistic job shop scheduling problems
-
Candido, M.A.B., Khator, S.K. and Barcia, R.M., A genetic algorithm based procedure for more realistic job shop scheduling problems. Int. J. Prod. Res., 1998, 36(12), 3437-3457.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.12
, pp. 3437-3457
-
-
Candido, M.A.B.1
Khator, S.K.2
Barcia, R.M.3
-
42
-
-
0035277503
-
Minimising makespan in a blocking flowshop using genetic algorithms
-
Caraffa, V., Ianes, S., Bagchi, T.P. and Sriskandarajah, C., Minimising makespan in a blocking flowshop using genetic algorithms. Int. J. Prod. Econ., 2001, 70(2), 101-115.
-
(2001)
Int. J. Prod. Econ.
, vol.70
, Issue.2
, pp. 101-115
-
-
Caraffa, V.1
Ianes, S.2
Bagchi, T.P.3
Sriskandarajah, C.4
-
43
-
-
0035480374
-
Incorporating physical demand criteria into assembly line balancing
-
Carnahan, B.J., Norman, B.A. and Redfern, M.S., Incorporating physical demand criteria into assembly line balancing. IIE Trans., 2001, 33, 875-887.
-
(2001)
IIE Trans.
, vol.33
, pp. 875-887
-
-
Carnahan, B.J.1
Norman, B.A.2
Redfern, M.S.3
-
44
-
-
0035546218
-
A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
-
Cavory, G., Dupas, R. and Goncalves, G., A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line. Int. J. Prod. Econ. 2001, 74, 135-140.
-
(2001)
Int. J. Prod. Econ.
, vol.74
, pp. 135-140
-
-
Cavory, G.1
Dupas, R.2
Goncalves, G.3
-
45
-
-
0028464285
-
A study of genetic crossover operations on the facilities layout problem
-
Chan, K.C. and Tansri, H., A study of genetic crossover operations on the facilities layout problem. Computers & Ind. Eng., 1994, 26(3), 537-550.
-
(1994)
Computers & Ind. Eng.
, vol.26
, Issue.3
, pp. 537-550
-
-
Chan, K.C.1
Tansri, H.2
-
46
-
-
0030241758
-
Genetic algorithms applied to the continuous flow shop problem
-
Chen, C., Neppalli, R.V. and Aljaber, N., Genetic algorithms applied to the continuous flow shop problem. Computers & Ind. Eng., 1996, 30(4), 919-929.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 919-929
-
-
Chen, C.1
Neppalli, R.V.2
Aljaber, N.3
-
47
-
-
0029207545
-
An application of genetic algorithms for flow shop problems
-
Chen, C.L., Vempati, V.S. and Aljaber, N., An application of genetic algorithms for flow shop problems. Euro. J. Op. Res., 1995, 80(2), 389-397.
-
(1995)
Euro. J. Op. Res.
, vol.80
, Issue.2
, pp. 389-397
-
-
Chen, C.L.1
Vempati, V.S.2
Aljaber, N.3
-
48
-
-
0034633374
-
Roundness inspection strategies for machine visions using non-linear programs and genetic algorithms
-
Chen, M., Roundness inspection strategies for machine visions using non-linear programs and genetic algorithms. Int. J. Prod. Res., 2000, 38(13), 2967-2988.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.13
, pp. 2967-2988
-
-
Chen, M.1
-
49
-
-
0032345070
-
Modeling rolling batch planning as vehicle routing problem with time windows
-
Chen, X., Wan, W. and Xu, X., Modeling rolling batch planning as vehicle routing problem with time windows. Computers & Op. Res., 1998, 25(12), 1127-1136.
-
(1998)
Computers & Op. Res.
, vol.25
, Issue.12
, pp. 1127-1136
-
-
Chen, X.1
Wan, W.2
Xu, X.3
-
50
-
-
0031622581
-
Loop layout design problem in flexible manufacturing systems using genetic algorithms
-
Cheng, R. and Gen, M., Loop layout design problem in flexible manufacturing systems using genetic algorithms. Computers & Ind. Eng., 1998, 34(1), 53-61.
-
(1998)
Computers & Ind. Eng.
, vol.34
, Issue.1
, pp. 53-61
-
-
Cheng, R.1
Gen, M.2
-
51
-
-
0035546590
-
Genetic clustering algorithms
-
Chiou, Y.C. and Lan, L.W., Genetic clustering algorithms. Euro. J. Op. Res., 2001, 135(2), 413-427.
-
(2001)
Euro. J. Op. Res.
, vol.135
, Issue.2
, pp. 413-427
-
-
Chiou, Y.C.1
Lan, L.W.2
-
52
-
-
0030244243
-
Penalty guided genetic search for reliability design optimisation
-
Coit, D.W. and Smith, A.E., Penalty guided genetic search for reliability design optimisation. Computers & Ind. Eng., 1996, 30(4), 895-904.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 895-904
-
-
Coit, D.W.1
Smith, A.E.2
-
53
-
-
0032099721
-
A constraint-based genetic algorithm for concurrent engineering
-
Cormier, D., O'Grady, P. and Sanii, E., A constraint-based genetic algorithm for concurrent engineering. Int. J. Prod. Res., 1998, 36(6), 1679-1697.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.6
, pp. 1679-1697
-
-
Cormier, D.1
O'Grady, P.2
Sanii, E.3
-
54
-
-
0030125476
-
Local search heuristics for single-machine scheduling with batching to minimise the number of late jobs
-
Crauwels, H.A.J., Potts, C.N. and Van Wassenhove, L.N., Local search heuristics for single-machine scheduling with batching to minimise the number of late jobs. Euro. J. Op. Res., 1996, 90(2), 200-214.
-
(1996)
Euro. J. Op. Res.
, vol.90
, Issue.2
, pp. 200-214
-
-
Crauwels, H.A.J.1
Potts, C.N.2
Van Wassenhove, L.N.3
-
55
-
-
0006859281
-
Genetic neuro-scheduler: A new approach for job shop scheduling
-
Dagli, C.H. and Sittisathanchai, S., Genetic neuro-scheduler: a new approach for job shop scheduling. Int. J. Prod. Econ., 1995, 41(1-3), 135-146.
-
(1995)
Int. J. Prod. Econ.
, vol.41
, Issue.1-3
, pp. 135-146
-
-
Dagli, C.H.1
Sittisathanchai, S.2
-
56
-
-
0035841881
-
Assembly planning with an ordering genetic algorithm
-
De Lit, P., Latinne, P., Rekiek, B. and Delchambre, A., Assembly planning with an ordering genetic algorithm. Int. J. Prod. Res., 2001, 39(16), 3623-3640.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.16
, pp. 3623-3640
-
-
De Lit, P.1
Latinne, P.2
Rekiek, B.3
Delchambre, A.4
-
57
-
-
0032255640
-
Economic design of reliable networks
-
Deeter, D.L. and Smith, A.E., Economic design of reliable networks. IIE Trans., 1998, 30, 1161-1174.
-
(1998)
IIE Trans.
, vol.30
, pp. 1161-1174
-
-
Deeter, D.L.1
Smith, A.E.2
-
58
-
-
0029224911
-
A genetic algorithm for the job shop problem
-
Della Croce, F., Tadei, R. and Volta, G., A genetic algorithm for the job shop problem. Computers & Op. Res., 1995, 22(1), 15-24.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.1
, pp. 15-24
-
-
Della Croce, F.1
Tadei, R.2
Volta, G.3
-
59
-
-
0034501331
-
A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
-
Dellaert, N., Jeunet, J. and Jonard, N., A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs. Int. J. Prod. Econ., 2000, 68(3), 241-257.
-
(2000)
Int. J. Prod. Econ.
, vol.68
, Issue.3
, pp. 241-257
-
-
Dellaert, N.1
Jeunet, J.2
Jonard, N.3
-
60
-
-
0034689120
-
Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm
-
Dellaert, N. and Jeunet, J., Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm. Int. J. Prod. Res., 2000, 38(5), 1083-1099.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.5
, pp. 1083-1099
-
-
Dellaert, N.1
Jeunet, J.2
-
61
-
-
0035889168
-
Optimising cutting parameters in process planning of prismatic parts by using genetic algorithms
-
Dereli, T., Filiz, I.H. and Baykasoglu, A., Optimising cutting parameters in process planning of prismatic parts by using genetic algorithms. Int. J. Prod. Res., 2001, 39(15), 3303-3328.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.15
, pp. 3303-3328
-
-
Dereli, T.1
Filiz, I.H.2
Baykasoglu, A.3
-
62
-
-
0033079210
-
Ship maintenance scheduling by genetic algorithm and constraint-based reasoning
-
Deris, S., Omatu, S., Ohta, H., Kutar, S. and Samat, P.A., Ship maintenance scheduling by genetic algorithm and constraint-based reasoning. Euro. J. Op. Res., 1999, 112(3) 489-503.
-
(1999)
Euro. J. Op. Res.
, vol.112
, Issue.3
, pp. 489-503
-
-
Deris, S.1
Omatu, S.2
Ohta, H.3
Kutar, S.4
Samat, P.A.5
-
63
-
-
0034500047
-
Genetic algorithm optimisation of a class of inventory control systems
-
Disney, S.M., Naim, M.M. and Towill, D.R., Genetic algorithm optimisation of a class of inventory control systems. Int. J. Prod. Econ., 2000, 68(3), 259-278.
-
(2000)
Int. J. Prod. Econ.
, vol.68
, Issue.3
, pp. 259-278
-
-
Disney, S.M.1
Naim, M.M.2
Towill, D.R.3
-
64
-
-
0030259058
-
Comparison of iterative improvement techniques for schedule optimisation
-
Dorn, J., Girsch, M., Skele, G. and Slany, W., Comparison of iterative improvement techniques for schedule optimisation. Euro. J. Op. Res., 1996, 94(2), 349-362.
-
(1996)
Euro. J. Op. Res.
, vol.94
, Issue.2
, pp. 349-362
-
-
Dorn, J.1
Girsch, M.2
Skele, G.3
Slany, W.4
-
65
-
-
0029215084
-
Evolution based learning in a job shop scheduling environment
-
Dorndorf, U. and Pesch, E., Evolution based learning in a job shop scheduling environment. Computers & Op. Res., 1995, 22(1), 25-40.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.1
, pp. 25-40
-
-
Dorndorf, U.1
Pesch, E.2
-
66
-
-
0031246797
-
Distribution requirements and compactness constraints in school timetabling
-
Drexl, A. and Salewski, F., Distribution requirements and compactness constraints in school timetabling. Euro. J. Op. Res., 1997, 102(1), 193-215.
-
(1997)
Euro. J. Op. Res.
, vol.102
, Issue.1
, pp. 193-215
-
-
Drexl, A.1
Salewski, F.2
-
67
-
-
0032645739
-
A distributed genetic algorithm for deterministic and stochastic labor scheduling problems
-
Easton, F.F. and Mansour, N., A distributed genetic algorithm for deterministic and stochastic labor scheduling problems. Euro. J. Op. Res., 1999, 118(3), 505-523.
-
(1999)
Euro. J. Op. Res.
, vol.118
, Issue.3
, pp. 505-523
-
-
Easton, F.F.1
Mansour, N.2
-
68
-
-
0033875411
-
Flow simulation and genetic algorithm as optimisation tools
-
Fontanili, F., Vincent, A. and Ponsonnet, R., Flow simulation and genetic algorithm as optimisation tools. Int. J. Prod. Econ., 2000, 64(1-3), 91-100.
-
(2000)
Int. J. Prod. Econ.
, vol.64
, Issue.1-3
, pp. 91-100
-
-
Fontanili, F.1
Vincent, A.2
Ponsonnet, R.3
-
69
-
-
0342903331
-
Resolution of strip-packing problems with genetic algorithms
-
Gomez, A. and de la Fuente, D., Resolution of strip-packing problems with genetic algorithms. J. Op. Res. Soc., 2000, 51(11), 1289-1295.
-
(2000)
J. Op. Res. Soc.
, vol.51
, Issue.11
, pp. 1289-1295
-
-
Gomez, A.1
De La Fuente, D.2
-
70
-
-
0032664017
-
A genetic algorithm method for one-dimensional machine location problems
-
Gong, D., Yamazaki, G., Gen, M. and Xu, W., A genetic algorithm method for one-dimensional machine location problems. Int. J. Prod. Econ., 1999, 60-61, 337-343.
-
(1999)
Int. J. Prod. Econ.
, vol.60-61
, pp. 337-343
-
-
Gong, D.1
Yamazaki, G.2
Gen, M.3
Xu, W.4
-
71
-
-
0032169192
-
Efficient solutions to the cell-formation problem with multiple routings via a double-loop genetic algorithm
-
Gravel, M., Nsakanda, A.L. and Price, W., Efficient solutions to the cell-formation problem with multiple routings via a double-loop genetic algorithm. Euro. J. Op. Res., 1998, 109(2), 286-299.
-
(1998)
Euro. J. Op. Res.
, vol.109
, Issue.2
, pp. 286-299
-
-
Gravel, M.1
Nsakanda, A.L.2
Price, W.3
-
72
-
-
18744405670
-
Scheduling jobs in an Alcan aluminum foundry using a genetic algorithm
-
Gravel, M., Price, W.L. and Gagne, C., Scheduling jobs in an Alcan aluminum foundry using a genetic algorithm. Int. J. Prod. Res., 2000, 38(13), 3031-3041.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.13
, pp. 3031-3041
-
-
Gravel, M.1
Price, W.L.2
Gagne, C.3
-
73
-
-
0027906589
-
Minimising flow time variance in a single machine system using genetic algorithms
-
Gupta, M.C., Gupta, Y.P. and Kumar, A., Minimising flow time variance in a single machine system using genetic algorithms. Euro. J. Op. Res., 1993, 70(3), 289-304.
-
(1993)
Euro. J. Op. Res.
, vol.70
, Issue.3
, pp. 289-304
-
-
Gupta, M.C.1
Gupta, Y.P.2
Kumar, A.3
-
74
-
-
0032001992
-
Multicriteria inventory classification using a genetic algorithm
-
Guvenir, H.A. and Erel, E., Multicriteria inventory classification using a genetic algorithm. Euro. J. Op. Res., 1998, 105(1), 29-38.
-
(1998)
Euro. J. Op. Res.
, vol.105
, Issue.1
, pp. 29-38
-
-
Guvenir, H.A.1
Erel, E.2
-
75
-
-
0030688633
-
A genetic algorithm for the multiple-choice integer program
-
Hadj-Alouane, A.B. and Bean, J.C., A genetic algorithm for the multiple-choice integer program. Op. Res., 1997, 45(1), 92-101.
-
(1997)
Op. Res.
, vol.45
, Issue.1
, pp. 92-101
-
-
Hadj-Alouane, A.B.1
Bean, J.C.2
-
76
-
-
0033101918
-
Development and validation of genetic algorithm-based facility layout - A case study in the pharmaceutical industry
-
Hamamoto, S., Yih, Y. and Salvendy, G., Development and validation of genetic algorithm-based facility layout - a case study in the pharmaceutical industry. Int. J. Prod. Res., 1999, 37(4), 749-768.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.4
, pp. 749-768
-
-
Hamamoto, S.1
Yih, Y.2
Salvendy, G.3
-
77
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
Hartmann, S., A competitive genetic algorithm for resource-constrained project scheduling. Naval Res. Log., 1998, 45, 733-750.
-
(1998)
Naval Res. Log.
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
78
-
-
0033748898
-
Fuzzy dispatching model and genetic algorithms for railyards operations
-
He, S., Song, R. and Chaudhry, S.S., Fuzzy dispatching model and genetic algorithms for railyards operations. Euro. J. Op. Res., 2000, 124(2), 307-331.
-
(2000)
Euro. J. Op. Res.
, vol.124
, Issue.2
, pp. 307-331
-
-
He, S.1
Song, R.2
Chaudhry, S.S.3
-
79
-
-
0343517765
-
Solving an assignment-selection problem with verbal information and using genetic algorithms
-
Herrera, F., Lopez, E., Mendana, C. and Rodriguez, M.A., Solving an assignment-selection problem with verbal information and using genetic algorithms. Euro. J. Op. Res., 1999, 119(2), 326-337.
-
(1999)
Euro. J. Op. Res.
, vol.119
, Issue.2
, pp. 326-337
-
-
Herrera, F.1
Lopez, E.2
Mendana, C.3
Rodriguez, M.A.4
-
80
-
-
0030168535
-
Comparison of genetic algorithms, random restart and two-opt switching for solving large location-allocation problems
-
Houck, C.R., Joines, J.A. and Kay, M.G., Comparison of genetic algorithms, random restart and two-opt switching for solving large location-allocation problems. Computers & Op. Res., 1996, 23(6), 587-596.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.6
, pp. 587-596
-
-
Houck, C.R.1
Joines, J.A.2
Kay, M.G.3
-
81
-
-
0032677426
-
Evolutionary algorithms for production planning problems with setup decisions
-
Hung, Y.F., Shih, C.C. and Chen, C.P., Evolutionary algorithms for production planning problems with setup decisions. J. Op. Res. Soc., 1999, 50(8), 857-866.
-
(1999)
J. Op. Res. Soc.
, vol.50
, Issue.8
, pp. 857-866
-
-
Hung, Y.F.1
Shih, C.C.2
Chen, C.P.3
-
82
-
-
0034322146
-
A multi-class multi-level capacitated lot sizing model
-
Hung, Y.F. and Chien, K.L., A multi-class multi-level capacitated lot sizing model. J. Op. Res. Soc., 2000, 51(11), 1309-1318.
-
(2000)
J. Op. Res. Soc.
, vol.51
, Issue.11
, pp. 1309-1318
-
-
Hung, Y.F.1
Chien, K.L.2
-
83
-
-
0025843905
-
A parallel heuristic for quadratic assignment problems
-
Huntley, C.L. and Brown, D.E., A parallel heuristic for quadratic assignment problems. Computers & Op. Res., 1991, 18(3), 275-289.
-
(1991)
Computers & Op. Res.
, vol.18
, Issue.3
, pp. 275-289
-
-
Huntley, C.L.1
Brown, D.E.2
-
84
-
-
0030243228
-
A genetic-algorithm-based heuristic for the GT cell formation problem
-
Hwang, H. and Sun, J., A genetic-algorithm-based heuristic for the GT cell formation problem. Computers & Ind. Eng., 1996, 30(4), 941-955.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 941-955
-
-
Hwang, H.1
Sun, J.2
-
85
-
-
0032120699
-
A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
-
Hyun, C.J., Kim, Y. and Kim, Y.K., A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers & Op. Res., 1998, 25, 675-690.
-
(1998)
Computers & Op. Res.
, vol.25
, pp. 675-690
-
-
Hyun, C.J.1
Kim, Y.2
Kim, Y.K.3
-
86
-
-
0034230027
-
Multi-product planning and scheduling using genetic algorithm approach
-
Ip, W.H., Li, Y., Man, K.F. and Tang, K.S., Multi-product planning and scheduling using genetic algorithm approach. Computers & Ind. Eng., 2000, 38, 283-296.
-
(2000)
Computers & Ind. Eng.
, vol.38
, pp. 283-296
-
-
Ip, W.H.1
Li, Y.2
Man, K.F.3
Tang, K.S.4
-
87
-
-
0032098010
-
A genetic algorithm approach for multiple criteria facility layout design
-
Islier, A.A., A genetic algorithm approach for multiple criteria facility layout design. Int. J. Prod. Res., 1998, 36(6), 1549-1569.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.6
, pp. 1549-1569
-
-
Islier, A.A.1
-
88
-
-
0032142045
-
Chance constrained integer programming models for capital budgeting in fuzzy environments
-
Iwamura, K. and Liu, B., Chance constrained integer programming models for capital budgeting in fuzzy environments. J. Op. Res. Soc., 1998, 49(8), 854-861.
-
(1998)
J. Op. Res. Soc.
, vol.49
, Issue.8
, pp. 854-861
-
-
Iwamura, K.1
Liu, B.2
-
89
-
-
0035196626
-
A genetic algorithm of determining cycle time for printed circuit board assembly lines
-
Ji, P., Sze, M.T. and Lee, W.B., A genetic algorithm of determining cycle time for printed circuit board assembly lines. Euro. J. Op. Res., 2001, 128(1), 175-184.
-
(2001)
Euro. J. Op. Res.
, vol.128
, Issue.1
, pp. 175-184
-
-
Ji, P.1
Sze, M.T.2
Lee, W.B.3
-
90
-
-
0034668374
-
Tolerance synthesis using second-order fuzzy comprehensive evaluation and genetic algorithm
-
Ji, S., Li, X. and Du, R., Tolerance synthesis using second-order fuzzy comprehensive evaluation and genetic algorithm. Int. J. Prod. Res., 2000, 38(15), 3471-3483.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.15
, pp. 3471-3483
-
-
Ji, S.1
Li, X.2
Du, R.3
-
91
-
-
0029755056
-
Manufacturing cell design: An integer programming model employing genetic algorithms
-
Joines, J.A., Culbreth, C.T. and King, R.E., Manufacturing cell design: an integer programming model employing genetic algorithms. IIE Trans., 1996, 28, 69-85.
-
(1996)
IIE Trans.
, vol.28
, pp. 69-85
-
-
Joines, J.A.1
Culbreth, C.T.2
King, R.E.3
-
92
-
-
0032026877
-
A two-phase genetic algorithm to solve variants of the batch sequencing problem
-
Jordan, C., A two-phase genetic algorithm to solve variants of the batch sequencing problem. Int. J. Prod. Res., 1998, 36(3), 745-760.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.3
, pp. 745-760
-
-
Jordan, C.1
-
93
-
-
0032095494
-
Local search metaheurisitcs for discrete-continuous scheduling problems
-
Jozefowska, J., Mika, M., Rozycki, R., Waligora, G. and Weglarz, J., Local search metaheurisitcs for discrete-continuous scheduling problems. Euro. J. Op. Res., 1998, 107(2), 254-371.
-
(1998)
Euro. J. Op. Res.
, vol.107
, Issue.2
, pp. 254-371
-
-
Jozefowska, J.1
Mika, M.2
Rozycki, R.3
Waligora, G.4
Weglarz, J.5
-
94
-
-
0030737194
-
Flow-line scheduling problem with controllable processing times
-
Karabati, S. and Kouvelis, P., Flow-line scheduling problem with controllable processing times. IIE Trans., 1997, 29, 1-14.
-
(1997)
IIE Trans.
, vol.29
, pp. 1-14
-
-
Karabati, S.1
Kouvelis, P.2
-
95
-
-
0031186426
-
Machining condition optimisation by genetic algorithms and simulated annealing
-
Khan, Z., Prasad, B. and Singh, T., Machining condition optimisation by genetic algorithms and simulated annealing. Computers & Op. Res., 1997, 24(7), 647-657.
-
(1997)
Computers & Op. Res.
, vol.24
, Issue.7
, pp. 647-657
-
-
Khan, Z.1
Prasad, B.2
Singh, T.3
-
96
-
-
0032073153
-
A genetic algorithm-based planning system for PCB component placement
-
Khoo, L.P. and Ng, T.K., A genetic algorithm-based planning system for PCB component placement. Int. J. Prod. Econ., 1998, 54(3), 321-333.
-
(1998)
Int. J. Prod. Econ.
, vol.54
, Issue.3
, pp. 321-333
-
-
Khoo, L.P.1
Ng, T.K.2
-
97
-
-
0032210383
-
The use of genetic algorithms to solve the economic lot size scheduling problem
-
Khouja, M., Michalewicz, Z. and Wilmot, M., The use of genetic algorithms to solve the economic lot size scheduling problem. Euro. J. Op. Res., 1998, 110(3), 509-525.
-
(1998)
Euro. J. Op. Res.
, vol.110
, Issue.3
, pp. 509-525
-
-
Khouja, M.1
Michalewicz, Z.2
Wilmot, M.3
-
98
-
-
0030244109
-
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
-
Kim, J.U. and Kim, Y.D, Simulated annealing and genetic algorithms for scheduling products with multi-level product structure. Computers & Op. Res., 1996, 23(9), 857-868.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.9
, pp. 857-868
-
-
Kim, J.U.1
Kim, Y.D.2
-
99
-
-
0030398997
-
Sequencing in mixed model assembly lines: A genetic algorithm approach
-
Kim, Y.K., Hyun, C.J. and Kim, Y., Sequencing in mixed model assembly lines: a genetic algorithm approach. Computers & Op. Res., 1996, 23(12), 1131-1145.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.12
, pp. 1131-1145
-
-
Kim, Y.K.1
Hyun, C.J.2
Kim, Y.3
-
100
-
-
0031994292
-
A heuristic-based genetic algorithm for workload smoothing in assembly lines
-
Kim, Y.J., Kim, Y.K. and Cho, Y., A heuristic-based genetic algorithm for workload smoothing in assembly lines. Computers & Op. Res., 1998, 25(2), 99-111.
-
(1998)
Computers & Op. Res.
, vol.25
, Issue.2
, pp. 99-111
-
-
Kim, Y.J.1
Kim, Y.K.2
Cho, Y.3
-
101
-
-
0030192703
-
Genetic algorithms for assembly line balancing with various objectives
-
Kim, Y.K., Kim, Y.J. and Kim, Y., Genetic algorithms for assembly line balancing with various objectives. Computers & Ind. Eng., 1996, 30(3), 397-409.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.3
, pp. 397-409
-
-
Kim, Y.K.1
Kim, Y.J.2
Kim, Y.3
-
102
-
-
0033166857
-
A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
-
Kimms, A., A genetic algorithm for multi-level, multi-machine lot sizing and scheduling. Computers & Op. Res., 1999, 26, 829-848.
-
(1999)
Computers & Op. Res.
, vol.26
, pp. 829-848
-
-
Kimms, A.1
-
103
-
-
0032117233
-
HOPE: A genetic algorithm for the unequal area facility layout problem
-
Kochhar, J.S., Foster, B.T. and Heragu, S.S., HOPE: a genetic algorithm for the unequal area facility layout problem. Computers & Op. Res., 1998, 25, 583-594.
-
(1998)
Computers & Op. Res.
, vol.25
, pp. 583-594
-
-
Kochhar, J.S.1
Foster, B.T.2
Heragu, S.S.3
-
104
-
-
0033078591
-
Some new results on simulated annealing applied to the job shop scheduling problem
-
Kolonko, M., Some new results on simulated annealing applied to the job shop scheduling problem. Euro. J. Op. Res., 1999, 113(1), 123-137.
-
(1999)
Euro. J. Op. Res.
, vol.113
, Issue.1
, pp. 123-137
-
-
Kolonko, M.1
-
105
-
-
0034294996
-
Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
-
Koonce, D.A. and Tsai, S.C., Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Computers & Ind. Eng., 2000, 38, 361-374.
-
(2000)
Computers & Ind. Eng.
, vol.38
, pp. 361-374
-
-
Koonce, D.A.1
Tsai, S.C.2
-
106
-
-
0034634829
-
A genetic algorithm for FMS part type selection and machine loading
-
Kumar, N. and Shanker, K., A genetic algorithm for FMS part type selection and machine loading. Int. J. Prod. Res., 2000, 38(16), 3861-3887.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.16
, pp. 3861-3887
-
-
Kumar, N.1
Shanker, K.2
-
107
-
-
0033708147
-
Lot streaming and scheduling heuristics for m-machine no-wait Flowshops
-
Kumar, S., Bagchi, T.P. and Sriskandarajah, C., Lot streaming and scheduling heuristics for m-machine no-wait Flowshops. Computers & Ind. Eng., 2000, 38(1), 149-172.
-
(2000)
Computers & Ind. Eng.
, vol.38
, Issue.1
, pp. 149-172
-
-
Kumar, S.1
Bagchi, T.P.2
Sriskandarajah, C.3
-
108
-
-
0035283856
-
A sales forecasting system based on fuzzy neural network with initial weights generated by genetic algorithm
-
Kuo, R.J., A sales forecasting system based on fuzzy neural network with initial weights generated by genetic algorithm. Euro. J. Op. Res., 2001, 129, 496-517.
-
(2001)
Euro. J. Op. Res.
, vol.129
, pp. 496-517
-
-
Kuo, R.J.1
-
109
-
-
0032664026
-
Dynamic control of a cellular-line production system under variations in the product mix
-
Kuroda, M., Tomita, T. and Maeda, K., Dynamic control of a cellular-line production system under variations in the product mix. Int. J. Prod. Econ., 1999, 60-61, 439-446.
-
(1999)
Int. J. Prod. Econ.
, vol.60-61
, pp. 439-446
-
-
Kuroda, M.1
Tomita, T.2
Maeda, K.3
-
110
-
-
0032676409
-
Scheduling to minimise product design time using a genetic algorithm
-
Lam, F.S.C., Lin, B.C., Sriskandarajah, C. and Yan, H., Scheduling to minimise product design time using a genetic algorithm. Int. J. Prod. Res., 1999, 37(6), 1369-1386.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.6
, pp. 1369-1386
-
-
Lam, F.S.C.1
Lin, B.C.2
Sriskandarajah, C.3
Yan, H.4
-
111
-
-
0032735952
-
Formulating and solving production planning problems
-
LeBlanc, L.J., Shtub, A. and Anandalingam, G., Formulating and solving production planning problems. Euro. J. Op. Res., 1999, 112(1), 54-81.
-
(1999)
Euro. J. Op. Res.
, vol.112
, Issue.1
, pp. 54-81
-
-
LeBlanc, L.J.1
Shtub, A.2
Anandalingam, G.3
-
112
-
-
0000902813
-
A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights
-
Lee, C.Y. and Choi, J.Y., A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers & Op. Res., 1995, 22(8), 857-869.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.8
, pp. 857-869
-
-
Lee, C.Y.1
Choi, J.Y.2
-
113
-
-
0000208572
-
Parallel genetic algorithms for the earliness-tardiness job scheduling problem with general penalty weights
-
Lee, C.Y. and Kim, S.J., Parallel genetic algorithms for the earliness-tardiness job scheduling problem with general penalty weights. Computers & Ind. Eng., 1995, 28(2), 231-243.
-
(1995)
Computers & Ind. Eng.
, vol.28
, Issue.2
, pp. 231-243
-
-
Lee, C.Y.1
Kim, S.J.2
-
114
-
-
0031121631
-
Job shop scheduling with a genetic algorithm and machine learning
-
Lee, C.Y., Piramuthu, S. and Tsai, Y.K., Job shop scheduling with a genetic algorithm and machine learning. Int. J. Prod. Res., 1997, 35(4), 1171-1191.
-
(1997)
Int. J. Prod. Res.
, vol.35
, Issue.4
, pp. 1171-1191
-
-
Lee, C.Y.1
Piramuthu, S.2
Tsai, Y.K.3
-
115
-
-
0031210823
-
A parallel genetic-neuro scheduler for job-shop scheduling problems
-
Lee, H.C. and Dagli, C.H., A parallel genetic-neuro scheduler for job-shop scheduling problems. Int. J. Prod. Econ., 1997, 51(1,2), 115-123.
-
(1997)
Int. J. Prod. Econ.
, vol.51
, Issue.1-2
, pp. 115-123
-
-
Lee, H.C.1
Dagli, C.H.2
-
116
-
-
0033724249
-
A neural-net approach to real time flow-shop sequencing
-
Lee, I. and Shaw, M.J., A neural-net approach to real time flow-shop sequencing. Computers & Ind. Eng., 2000, 38, 125-147.
-
(2000)
Computers & Ind. Eng.
, vol.38
, pp. 125-147
-
-
Lee, I.1
Shaw, M.J.2
-
117
-
-
0030151930
-
Search heuristics for resource constrained project scheduling
-
Lee, J.K. and Kim, Y.D., Search heuristics for resource constrained project scheduling. J. Op. Res. Soc., 1996, 47(5), 678-690.
-
(1996)
J. Op. Res. Soc.
, vol.47
, Issue.5
, pp. 678-690
-
-
Lee, J.K.1
Kim, Y.D.2
-
118
-
-
0034628951
-
Part family identification using a simple genetic algorithm
-
Lee-Post, A., Part family identification using a simple genetic algorithm. Int. J. Prod. Res., 2000, 38(4), 793-810.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.4
, pp. 793-810
-
-
Lee-Post, A.1
-
119
-
-
0028499648
-
Robustness measures and robust scheduling for job shops
-
Leon, V.J., Wu S.D. and Storer, R.H., Robustness measures and robust scheduling for job shops. IIE Trans., 1994, 26(5), 32-43.
-
(1994)
IIE Trans.
, vol.26
, Issue.5
, pp. 32-43
-
-
Leon, V.J.1
Wu, S.D.2
Storer, R.H.3
-
120
-
-
84990609518
-
Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria
-
Leu, Y.Y., Matheson, L.A. and Rees, L.P., Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sci., 1994, 25(4), 581-607.
-
(1994)
Decision Sci.
, vol.25
, Issue.4
, pp. 581-607
-
-
Leu, Y.Y.1
Matheson, L.A.2
Rees, L.P.3
-
121
-
-
0030242937
-
Sequencing mixed-model assembly lines with genetic algorithms
-
Leu, Y., Matheson, L.A. and Rees, L.P., Sequencing mixed-model assembly lines with genetic algorithms. Computers & Ind. Eng., 1996, 30(4), 1027-1036.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 1027-1036
-
-
Leu, Y.1
Matheson, L.A.2
Rees, L.P.3
-
122
-
-
0030173721
-
Application of a hybrid genetic algorithm to airline crew scheduling
-
Levine, D., Application of a hybrid genetic algorithm to airline crew scheduling. Computers & Op. Res., 1996, 23(6), 547-558.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.6
, pp. 547-558
-
-
Levine, D.1
-
123
-
-
0035283561
-
Structure optimisation for continuous production systems with buffers under reliability constraints
-
Levitin, G. and Meizin, L., Structure optimisation for continuous production systems with buffers under reliability constraints. Int. J. Prod. Econ., 2001, 70, 77-87.
-
(2001)
Int. J. Prod. Econ.
, vol.70
, pp. 77-87
-
-
Levitin, G.1
Meizin, L.2
-
124
-
-
0034230637
-
A hybrid genetic algorithm for the open shop scheduling problem
-
Liaw, C.F., A hybrid genetic algorithm for the open shop scheduling problem. Euro. J. Op. Res., 2000, 124(1), 28-42.
-
(2000)
Euro. J. Op. Res.
, vol.124
, Issue.1
, pp. 28-42
-
-
Liaw, C.F.1
-
125
-
-
0034655054
-
Optimisation of machining datum selection and machining tolerance allocation with genetic algorithms
-
Li, W., Bai, G., Zhang, C. and Wang, B., Optimisation of machining datum selection and machining tolerance allocation with genetic algorithms. Int. J. Prod. Res., 2000, 38(6), 1407-1424.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.6
, pp. 1407-1424
-
-
Li, W.1
Bai, G.2
Zhang, C.3
Wang, B.4
-
126
-
-
0032484447
-
Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
-
Li, Y., Ip, W.H. and Wang, D.W., Genetic algorithm approach to earliness and tardiness production scheduling and planning problem. Int. J. Prod. Econ., 1998, 54(1), 65-77.
-
(1998)
Int. J. Prod. Econ.
, vol.54
, Issue.1
, pp. 65-77
-
-
Li, Y.1
Ip, W.H.2
Wang, D.W.3
-
127
-
-
0035447575
-
A genetic algorithm for sequential part assignment for PCB assembly
-
Loh, T.S., Bukkapatnam, S.T.S., Medeiros, D. and Kwon, H., A genetic algorithm for sequential part assignment for PCB assembly. Computers & Ind. Eng., 2001, 40, 293-307.
-
(2001)
Computers & Ind. Eng.
, vol.40
, pp. 293-307
-
-
Loh, T.S.1
Bukkapatnam, S.T.S.2
Medeiros, D.3
Kwon, H.4
-
128
-
-
0032021554
-
A genetic algorithm approach to scheduling PCBs on a single machine
-
Maimon, O.Z. and Braha, D., A genetic algorithm approach to scheduling PCBs on a single machine. Int. J. Prod. Res., 1998, 36(3), 761-784.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.3
, pp. 761-784
-
-
Maimon, O.Z.1
Braha, D.2
-
129
-
-
0034664135
-
Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups
-
McMullen, P.R., Tarasewich, P. and Frazier, G.V., Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups. Int. J. Prod. Res., 2000, 38(12), 2653-2670.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.12
, pp. 2653-2670
-
-
McMullen, P.R.1
Tarasewich, P.2
Frazier, G.V.3
-
130
-
-
0035545592
-
An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics
-
McMullen, P.R., An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics. Computers & Ind. Eng., 2001, 41, 335-353.
-
(2001)
Computers & Ind. Eng.
, vol.41
, pp. 335-353
-
-
McMullen, P.R.1
-
131
-
-
0034690551
-
A hybrid Hopfield network-genetic algorithm approach to optimal process plan selection
-
Ming, X.G. and Mak, K.L., A hybrid Hopfield network-genetic algorithm approach to optimal process plan selection. Int. J. Prod. Res., 2000, 38(8), 1823-1839.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.8
, pp. 1823-1839
-
-
Ming, X.G.1
Mak, K.L.2
-
132
-
-
0032162707
-
Optimal system design considering maintenance and warranty
-
Monga, A., Optimal system design considering maintenance and warranty. Computers & Op. Res., 1994, 25(9), 691-705.
-
(1994)
Computers & Op. Res.
, vol.25
, Issue.9
, pp. 691-705
-
-
Monga, A.1
-
133
-
-
0032162707
-
Optimal system design considering maintenance and warranty
-
Monga, A. and Zuo, M.J., Optimal system design considering maintenance and warranty. Computers & Op. Res., 1998, 25(9), 691-705.
-
(1998)
Computers & Op. Res.
, vol.25
, Issue.9
, pp. 691-705
-
-
Monga, A.1
Zuo, M.J.2
-
134
-
-
0035447113
-
Optimal design of series-parallel systems considering maintenance and salvage value
-
Monga, A. and Zuo, M.J., Optimal design of series-parallel systems considering maintenance and salvage value. Computers & Ind. Eng., 2001, 40, 323-337.
-
(2001)
Computers & Ind. Eng.
, vol.40
, pp. 323-337
-
-
Monga, A.1
Zuo, M.J.2
-
135
-
-
0032652134
-
A genetic algorithm-based approach for design of independent manufacturing cells
-
Moon, C. and Gen, M., A genetic algorithm-based approach for design of independent manufacturing cells. Int. J. Prod. Econ., 1999, 60-61, 421-427.
-
(1999)
Int. J. Prod. Econ.
, vol.60-61
, pp. 421-427
-
-
Moon, C.1
Gen, M.2
-
136
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori, M. and Tseng, C.C., A genetic algorithm for multi-mode resource constrained project scheduling problem. Euro. J. Op. Res., 1997, 100(1), 134-142.
-
(1997)
Euro. J. Op. Res.
, vol.100
, Issue.1
, pp. 134-142
-
-
Mori, M.1
Tseng, C.C.2
-
137
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
Murata, T., Ishibuchi, H. and Tanaka, H., Genetic algorithms for flowshop scheduling problems. Computers & Ind. Eng., 1996, 30(4), 1061-1071.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
138
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flowshop scheduling
-
Murata, T., Ishibuchi, H. and Tanaka, H., Multi-objective genetic algorithm and its applications to flowshop scheduling. Computers & Ind. Eng., 1996, 30(4), 957-968.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
139
-
-
0030143150
-
A genetic algorithm approach to periodic railway synchronisation
-
Nachtigall, K. and Voget, S., A genetic algorithm approach to periodic railway synchronisation. Computers & Op. Res., 1996, 23(5), 453-463.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.5
, pp. 453-463
-
-
Nachtigall, K.1
Voget, S.2
-
140
-
-
0031351812
-
Minimising waiting times in integrated fixed interval timetables by upgrading railway tracks
-
Nachtigall, K. and Voget, S., Minimising waiting times in integrated fixed interval timetables by upgrading railway tracks. Euro. J. Op. Res., 1997, 103(3), 610-628.
-
(1997)
Euro. J. Op. Res.
, vol.103
, Issue.3
, pp. 610-628
-
-
Nachtigall, K.1
Voget, S.2
-
141
-
-
0029322972
-
A branch-and-bound approach for a two-machine flowshop scheduling problem
-
Nagar, A., Heragu, S.S. and Haddock, J., A branch-and-bound approach for a two-machine flowshop scheduling problem. J. Op. Res. Soc., 1995, 46(6), 721-735.
-
(1995)
J. Op. Res. Soc.
, vol.46
, Issue.6
, pp. 721-735
-
-
Nagar, A.1
Heragu, S.S.2
Haddock, J.3
-
142
-
-
0030572949
-
Genetic algorithms for the two-stage bicriteria flowshop problem
-
Neppalli, V.R., Chen, C.L. and Gupta, J.N.D., Genetic algorithms for the two-stage bicriteria flowshop problem. Euro. J. Op. Res., 1995, 95, 356-373.
-
(1995)
Euro. J. Op. Res.
, vol.95
, pp. 356-373
-
-
Neppalli, V.R.1
Chen, C.L.2
Gupta, J.N.D.3
-
143
-
-
0035324677
-
Berth allocation planning in the public berth system by genetic algorithms
-
Nishimura, E., Imai, A. and Papadimitriou, S., Berth allocation planning in the public berth system by genetic algorithms. Euro. J. Op. Res., 2001, 35, 401-417.
-
(2001)
Euro. J. Op. Res.
, vol.35
, pp. 401-417
-
-
Nishimura, E.1
Imai, A.2
Papadimitriou, S.3
-
144
-
-
0028518431
-
A genetic algorithm for the talent scheduling problem
-
Nordstrom, A.L. and Tufekci, S., A genetic algorithm for the talent scheduling problem. Computers & Op. Res., 1994, 21(8), 927-940.
-
(1994)
Computers & Op. Res.
, vol.21
, Issue.8
, pp. 927-940
-
-
Nordstrom, A.L.1
Tufekci, S.2
-
145
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
Norman, B.A. and Bean, J.C., A genetic algorithm methodology for complex scheduling problems. Naval Research Logistics, 1999, 46, 199-211.
-
(1999)
Naval Research Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
146
-
-
0033881315
-
Scheduling operations on parallel machine tools
-
Norman, B.A. and Bean, J.C., Scheduling operations on parallel machine tools. IIE Trans., 2000, 32, 449-459.
-
(2000)
IIE Trans.
, vol.32
, pp. 449-459
-
-
Norman, B.A.1
Bean, J.C.2
-
147
-
-
0034111265
-
A continuous approach to the design of physical distribution systems
-
Novaes, A.G.N., de Cursi, J.E.S. and Graciolli, O.D., A continuous approach to the design of physical distribution systems. Computers & Op. Res., 2000, 27, 877-893.
-
(2000)
Computers & Op. Res.
, vol.27
, pp. 877-893
-
-
Novaes, A.G.N.1
De Cursi, J.E.S.2
Graciolli, O.D.3
-
148
-
-
0035841883
-
Optimisation of multipass turning operations with genetic algorithms
-
Onwubolu, G.C. and Kumalo, T., Optimisation of multipass turning operations with genetic algorithms. Int. J. Prod. Res., 2001, 39(16), 3727-3745.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.16
, pp. 3727-3745
-
-
Onwubolu, G.C.1
Kumalo, T.2
-
149
-
-
0035878033
-
Optimising the multiple constrained resources product mix problem using genetic algorithms
-
Onwubolu, G.C. and Mutingi, M., Optimising the multiple constrained resources product mix problem using genetic algorithms. Int. J. Prod. Res., 2001, 39(9), 1897-1910.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.9
, pp. 1897-1910
-
-
Onwubolu, G.C.1
Mutingi, M.2
-
150
-
-
0035247218
-
A genetic algorithm approach to cellular manufacturing systems
-
Onwubolu, G.C. and Mutingi, M., A genetic algorithm approach to cellular manufacturing systems. Computers & Ind. Eng., 2001, 39, 125-144.
-
(2001)
Computers & Ind. Eng.
, vol.39
, pp. 125-144
-
-
Onwubolu, G.C.1
Mutingi, M.2
-
151
-
-
0033133851
-
Solving a nonlinear non-convex trim loss problem with a genetic hybrid algorithm
-
Ostermark, R., Solving a nonlinear non-convex trim loss problem with a genetic hybrid algorithm. Computers & Op. Res., 1999, 26, 623-635.
-
(1999)
Computers & Op. Res.
, vol.26
, pp. 623-635
-
-
Ostermark, R.1
-
152
-
-
0345581411
-
Hybrid heuristics for the multi-stage capacitated lot sizing and loading problem
-
Ozdamar, L. and Barbarosoglu, G., Hybrid heuristics for the multi-stage capacitated lot sizing and loading problem. J. Op. Res. Soc., 1999, 50(8), 810-825.
-
(1999)
J. Op. Res. Soc.
, vol.50
, Issue.8
, pp. 810-825
-
-
Ozdamar, L.1
Barbarosoglu, G.2
-
153
-
-
0034311096
-
The capacitated lot sizing problem with overtime decisions and setup times
-
Ozdamar, L. and Bozyel, M.A., The capacitated lot sizing problem with overtime decisions and setup times. IIE Trans., 2000, 32, 1043-1057.
-
(2000)
IIE Trans.
, vol.32
, pp. 1043-1057
-
-
Ozdamar, L.1
Bozyel, M.A.2
-
154
-
-
84990599113
-
Specifying critical inputs in a genetic algorithm-driven decision support system: An automated facility
-
Pakath, R. and Zaveri, J.S., Specifying critical inputs in a genetic algorithm-driven decision support system: an automated facility. Decision Sci., 1995, 26(6), 749-780.
-
(1995)
Decision Sci.
, vol.26
, Issue.6
, pp. 749-780
-
-
Pakath, R.1
Zaveri, J.S.2
-
155
-
-
0032098627
-
Branch and bound crossed with GA to solve hybrid Flowshops
-
Portmann, M.C., Vignier, A., Dardilhac, D. and Dezalay, D., Branch and bound crossed with GA to solve hybrid Flowshops. Euro. J. Op. Res., 1998, 107(2), 389-401.
-
(1998)
Euro. J. Op. Res.
, vol.107
, Issue.2
, pp. 389-401
-
-
Portmann, M.C.1
Vignier, A.2
Dardilhac, D.3
Dezalay, D.4
-
156
-
-
0034692670
-
A GA-based approach to machining operation sequencing for prismatic parts
-
Qiao, L., Wang, X.Y. and Wang, S.C., A GA-based approach to machining operation sequencing for prismatic parts. Int. J. Prod. Res., 2000, 38(14), 3283-3303.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.14
, pp. 3283-3303
-
-
Qiao, L.1
Wang, X.Y.2
Wang, S.C.3
-
157
-
-
0031675679
-
A genetic algorithm for facility layout design in flexible manufacturing systems
-
Rajasekharan, M., Peters, B.A. and Yang, T., A genetic algorithm for facility layout design in flexible manufacturing systems. Int. J. Prod. Res., 1998, 36(1), 95-110.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.1
, pp. 95-110
-
-
Rajasekharan, M.1
Peters, B.A.2
Yang, T.3
-
158
-
-
0033079877
-
A genetic algorithms-based approach for design of manufacturing systems: An industrial application
-
Rao, H.A., Pham, S.N. and Gu, P., A genetic algorithms-based approach for design of manufacturing systems: an industrial application. Int. J. Prod. Res., 1999, 37(3), 557-580.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.3
, pp. 557-580
-
-
Rao, H.A.1
Pham, S.N.2
Gu, P.3
-
159
-
-
0029224965
-
A genetic algorithm for flowshop sequencing
-
Reeves, C.R., A genetic algorithm for flowshop sequencing. Computers & Op. Res., 1995, 22(1), 5-13.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.1
, pp. 5-13
-
-
Reeves, C.R.1
-
160
-
-
0030241635
-
A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies
-
Roach, A. and Nagi, R., A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies. Computers & Ind. Eng., 1996, 30(4), 1047-1060.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 1047-1060
-
-
Roach, A.1
Nagi, R.2
-
161
-
-
0030143035
-
Genetic algorithms and call admission to telecommunications networks
-
Rose, C. and Yates, R.D., Genetic algorithms and call admission to telecommunications networks. Computers & Op. Res., 1996, 23(5), 485-499.
-
(1996)
Computers & Op. Res.
, vol.23
, Issue.5
, pp. 485-499
-
-
Rose, C.1
Yates, R.D.2
-
162
-
-
0034627942
-
Dynamic scheduling of FMS using a real-time genetic algorithm
-
Rossi, A. and Dini, G., Dynamic scheduling of FMS using a real-time genetic algorithm. Int. J. Prod. Res., 2000, 38(1), 1-20.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.1
, pp. 1-20
-
-
Rossi, A.1
Dini, G.2
-
163
-
-
0001634874
-
Genetic algorithm for assembly line balancing
-
Rubinovitz, J. and Levitin, G., Genetic algorithm for assembly line balancing. Int. J. Prod. Econ., 1995, 41(1-3), 343-355.
-
(1995)
Int. J. Prod. Econ.
, vol.41
, Issue.1-3
, pp. 343-355
-
-
Rubinovitz, J.1
Levitin, G.2
-
164
-
-
0030241688
-
Flexible scheduling in a machining center through genetic algorithms
-
Sakawa, M., Kato, K. and Mori, T., Flexible scheduling in a machining center through genetic algorithms. Computers & Ind. Eng., 1996, 30(4), 931-940.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 931-940
-
-
Sakawa, M.1
Kato, K.2
Mori, T.3
-
165
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
-
Sakawa, M. and Kubota, R., Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms. Euro. J. Op. Res., 2000, 120(2), 393-407.
-
(2000)
Euro. J. Op. Res.
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
166
-
-
0034300581
-
A fuzzy satisficing method for electric power plant coal purchase using genetic algorithms
-
Shiromaru, I., Inuiguchi, M. and Sakawa, M., A fuzzy satisficing method for electric power plant coal purchase using genetic algorithms. Euro. J. Op. Res., 2000, 126(1), 218-230.
-
(2000)
Euro. J. Op. Res.
, vol.126
, Issue.1
, pp. 218-230
-
-
Shiromaru, I.1
Inuiguchi, M.2
Sakawa, M.3
-
167
-
-
0030571697
-
Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
-
Shtub, A., LeBlanc, L.J. and Cai, Z., Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. Euro. J. Op. Res., 1996, 88(1), 124-139.
-
(1996)
Euro. J. Op. Res.
, vol.88
, Issue.1
, pp. 124-139
-
-
Shtub, A.1
LeBlanc, L.J.2
Cai, Z.3
-
168
-
-
0030241588
-
A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line
-
Sikora, R., A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line. Computers & Ind. Eng., 1996, 30(4), 969-981.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 969-981
-
-
Sikora, R.1
-
169
-
-
0027656618
-
Comparison of the performance of modern heuristics for combinatorial optimisation on real data
-
Sinclair, M., Comparison of the performance of modern heuristics for combinatorial optimisation on real data. Computers & Op. Res., 1993, 20(7), 687-695.
-
(1993)
Computers & Op. Res.
, vol.20
, Issue.7
, pp. 687-695
-
-
Sinclair, M.1
-
170
-
-
0033166361
-
Parallel machine scheduling with earliness and tardiness penalties
-
Sivrikaya-Serifoglu, F. and Ulusoy, G., Parallel machine scheduling with earliness and tardiness penalties. Computers & Op. Res., 1999, 26, 773-787.
-
(1999)
Computers & Op. Res.
, vol.26
, pp. 773-787
-
-
Sivrikaya-Serifoglu, F.1
Ulusoy, G.2
-
171
-
-
0032203407
-
Maintenance scheduling of rolling stock using a genetic algorithm
-
Sriskandarajah, C., Jardine, A.K.S. and Chan, C.K., Maintenance scheduling of rolling stock using a genetic algorithm. J. Op. Res. Soc., 1998, 49(11), 1130-1146.
-
(1998)
J. Op. Res. Soc.
, vol.49
, Issue.11
, pp. 1130-1146
-
-
Sriskandarajah, C.1
Jardine, A.K.S.2
Chan, C.K.3
-
172
-
-
21344480637
-
Identifying economic order quantities using genetic algorithms
-
Stockton, D.J. and Quinn, L., Identifying economic order quantities using genetic algorithms. Int. J. Op. & Prod. Manage., 1993, 13(11), 92-103.
-
(1993)
Int. J. Op. & Prod. Manage.
, vol.13
, Issue.11
, pp. 92-103
-
-
Stockton, D.J.1
Quinn, L.2
-
173
-
-
0034380016
-
An evolutionary algorithm for sequencing production on a paced assembly line
-
Sumichrast, R.T., Oxenrider, K.A. and Clayton, E.R., An evolutionary algorithm for sequencing production on a paced assembly line. Decision Sci., 2000, 31(1), 149-173.
-
(2000)
Decision Sci.
, vol.31
, Issue.1
, pp. 149-173
-
-
Sumichrast, R.T.1
Oxenrider, K.A.2
Clayton, E.R.3
-
174
-
-
0032628437
-
Integrated environmental management process applying genetic algorithm
-
Takeuchi, T., Yazu, Y. and Sakuma, A., Integrated environmental management process applying genetic algorithm. Int. J. Prod. Econ., 1999, 60-61, 35-43.
-
(1999)
Int. J. Prod. Econ.
, vol.60-61
, pp. 35-43
-
-
Takeuchi, T.1
Yazu, Y.2
Sakuma, A.3
-
175
-
-
0026979059
-
Genetic algorithms, function optimisation, and facility layout design
-
Tam, K. Y., Genetic algorithms, function optimisation, and facility layout design. Euro. J. Op. Res., 1992, 63(2), 322-347.
-
(1992)
Euro. J. Op. Res.
, vol.63
, Issue.2
, pp. 322-347
-
-
Tam, K.Y.1
-
176
-
-
0032294137
-
Solving facility layout problems with geometric constraints using parallel genetic algorithms: Experimentation and findings
-
Tam, K.Y. and Chan, S.K., Solving facility layout problems with geometric constraints using parallel genetic algorithms: experimentation and findings. Int. J. Prod. Res., 1998, 36(12), 3253-3272.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.12
, pp. 3253-3272
-
-
Tam, K.Y.1
Chan, S.K.2
-
177
-
-
0033741404
-
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
-
Tang, L., Liu, J., Rong, A. and Yang, Z., A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex. Euro. J. Op. Res., 2000, 124(2), 267-282.
-
(2000)
Euro. J. Op. Res.
, vol.124
, Issue.2
, pp. 267-282
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
178
-
-
0033896903
-
A new model and solution method for product line design with pricing
-
Thakur, L.S., Nair, S.K., Wen, K.W. and Tarasewich, P., A new model and solution method for product line design with pricing. J. Op. Res. Soc., 2000, 51(1), 90-101.
-
(2000)
J. Op. Res. Soc.
, vol.51
, Issue.1
, pp. 90-101
-
-
Thakur, L.S.1
Nair, S.K.2
Wen, K.W.3
Tarasewich, P.4
-
179
-
-
0034692672
-
Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
-
Tiwari, M.K. and Vidyarthi, N.K., Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. Int. J. Prod. Res., 2000, 38(14), 3357-3384.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.14
, pp. 3357-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
180
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G., Sivrikaya-Serifoglu, F. and Bilge, U., A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Op. Res., 1997, 24(4), 335-351.
-
(1997)
Computers & Op. Res.
, vol.24
, Issue.4
, pp. 335-351
-
-
Ulusoy, G.1
Sivrikaya-Serifoglu, F.2
Bilge, U.3
-
181
-
-
0034561525
-
An equitable approach to the payment scheduling problem in project management
-
Ulusoy, G. and Cebelli, S., An equitable approach to the payment scheduling problem in project management. Euro. J. Op. Res., 2000, 127(2), 262-278.
-
(2000)
Euro. J. Op. Res.
, vol.127
, Issue.2
, pp. 262-278
-
-
Ulusoy, G.1
Cebelli, S.2
-
182
-
-
0030242936
-
The application of genetic algorithms to operation sequencing for use in computer-aided process planning
-
Usher, J.M. and Bowden, R.O., The application of genetic algorithms to operation sequencing for use in computer-aided process planning. Computers & Ind. Eng., 1996, 30(4), 999-1013.
-
(1996)
Computers & Ind. Eng.
, vol.30
, Issue.4
, pp. 999-1013
-
-
Usher, J.M.1
Bowden, R.O.2
-
183
-
-
0032280892
-
Cost optimal preventive maintenance and replacement scheduling
-
Usher, J.S., Kamal, A.H. and Syed, W.H., Cost optimal preventive maintenance and replacement scheduling. IIE Trans., 1998, 30, 1121-1128.
-
(1998)
IIE Trans.
, vol.30
, pp. 1121-1128
-
-
Usher, J.S.1
Kamal, A.H.2
Syed, W.H.3
-
184
-
-
0030291565
-
Random search in the one-dimensional cutting stock problem
-
Vahrenkamp, R., Random search in the one-dimensional cutting stock problem. Euro. J. Op. Res., 1996, 95(1), 191-201.
-
(1996)
Euro. J. Op. Res.
, vol.95
, Issue.1
, pp. 191-201
-
-
Vahrenkamp, R.1
-
185
-
-
0032650405
-
Solving the medium newspaper production/distribution problem
-
Van Buer, M.G., Woodruff, D.L. and Olson, R.T., Solving the medium newspaper production/distribution problem. Euro. J. Op. Res., 1999, 15(2), 237-254.
-
(1999)
Euro. J. Op. Res.
, vol.15
, Issue.2
, pp. 237-254
-
-
Van Buer, M.G.1
Woodruff, D.L.2
Olson, R.T.3
-
186
-
-
0026940060
-
A genetic algorithm approach to the machine-component grouping problem with multiple objectives
-
Venugopal, V. and Narendran, T.T., A genetic algorithm approach to the machine-component grouping problem with multiple objectives. Computers & Ind. Eng., 1992, 22(4), 469-480.
-
(1992)
Computers & Ind. Eng.
, vol.22
, Issue.4
, pp. 469-480
-
-
Venugopal, V.1
Narendran, T.T.2
-
187
-
-
0032657061
-
A genetic algorithm solution for one-dimensional bundled stock cutting
-
Wagner, B.J., A genetic algorithm solution for one-dimensional bundled stock cutting. Euro. J. Op. Res., 1999, 117(2), 368-382.
-
(1999)
Euro. J. Op. Res.
, vol.117
, Issue.2
, pp. 368-382
-
-
Wagner, B.J.1
-
188
-
-
0032165143
-
A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date
-
Webster, S., Jog, P.D. and Gupta, A., A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date. Int. J. Prod. Res., 1998, 36(9), 2543-2551.
-
(1998)
Int. J. Prod. Res.
, vol.36
, Issue.9
, pp. 2543-2551
-
-
Webster, S.1
Jog, P.D.2
Gupta, A.3
-
189
-
-
0033885012
-
Three scheduling algorithms applied to the earth observing systems domain
-
Wolfe, W.J. and Sorensen, S.E., Three scheduling algorithms applied to the earth observing systems domain. Manage. Sci., 2000, 46(1), 148-167.
-
(2000)
Manage. Sci.
, vol.46
, Issue.1
, pp. 148-167
-
-
Wolfe, W.J.1
Sorensen, S.E.2
-
190
-
-
0028368129
-
A genetic algorithm for public transport driver scheduling
-
Wren, A. and Wren, D.O., A genetic algorithm for public transport driver scheduling. Computers & Op. Res., 1995, 22(1), 101-110.
-
(1995)
Computers & Op. Res.
, vol.22
, Issue.1
, pp. 101-110
-
-
Wren, A.1
Wren, D.O.2
-
191
-
-
0030190733
-
The use of dynamic programming in genetic algorithms for permutation problems
-
Yagiura, M. and Ibaraki, T., The use of dynamic programming in genetic algorithms for permutation problems. Euro. J. Op. Res., 1996, 92(2), 387-402.
-
(1996)
Euro. J. Op. Res.
, vol.92
, Issue.2
, pp. 387-402
-
-
Yagiura, M.1
Ibaraki, T.2
-
192
-
-
0033230551
-
A new branch-and-bound approach for the n/2/flowshop/xF+BC sub max flowshop scheduling problem
-
Yeh, E.C., A new branch-and-bound approach for the n/2/flowshop/xF+BC sub max flowshop scheduling problem. Computers & Op. Res., 1999, 26, 1293-1310.
-
(1999)
Computers & Op. Res.
, vol.26
, pp. 1293-1310
-
-
Yeh, E.C.1
-
193
-
-
0029754151
-
A genetic algorithm application for sequencing operations in process planning for parallel machining
-
Yip-Hoi, D. and Dutta, D., A genetic algorithm application for sequencing operations in process planning for parallel machining. IIE Trans., 1996, 28, 55-68.
-
(1996)
IIE Trans.
, vol.28
, pp. 55-68
-
-
Yip-Hoi, D.1
Dutta, D.2
-
194
-
-
0035309164
-
Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling
-
Yu, H. and Liang, W., Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling. Computers & Ind. Eng., 2001, 39, 337-356.
-
(2001)
Computers & Ind. Eng.
, vol.39
, pp. 337-356
-
-
Yu, H.1
Liang, W.2
-
195
-
-
0034692668
-
A genetic algorithm based heuristic for adjacent paper-reel layout problem
-
Zhang, G.Q., Xue, J. and Lai, K.K., A genetic algorithm based heuristic for adjacent paper-reel layout problem. Int. J. Prod. Res., 2000, 38(14), 3343-3356.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.14
, pp. 3343-3356
-
-
Zhang, G.Q.1
Xue, J.2
Lai, K.K.3
-
196
-
-
0034688395
-
A genetic algorithm for manufacturing cell formation with multiple routes and multiple objectives
-
Zhao, C. and Wu, Z., A genetic algorithm for manufacturing cell formation with multiple routes and multiple objectives. Int. J. Prod. Res., 2000, 38(2), 385-395.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.2
, pp. 385-395
-
-
Zhao, C.1
Wu, Z.2
-
197
-
-
0035399781
-
The hybrid heuristic genetic algorithm for job shop scheduling
-
Zhou, H., Feng, Y. and Han, L., The hybrid heuristic genetic algorithm for job shop scheduling. Computers & Ind. Eng., 2001, 40, 191-200.
-
(2001)
Computers & Ind. Eng.
, vol.40
, pp. 191-200
-
-
Zhou, H.1
Feng, Y.2
Han, L.3
|