메뉴 건너뛰기




Volumn 54, Issue 1, 1998, Pages 65-76

Genetic algorithm approach to earliness and tardiness production scheduling and planning problem

Author keywords

GA; Just in time (JIT); Manufacturing resource planning (MRP II); Production and inventory management; Production scheduling and planning (PSP)

Indexed keywords

GENETIC ALGORITHMS; INDUSTRIAL MANAGEMENT; JUST IN TIME PRODUCTION; MANUFACTURE; PLANNING; SCHEDULING;

EID: 0032484447     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(97)00124-2     Document Type: Article
Times cited : (35)

References (23)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K.R., Scudder, G.D., 1990. Sequencing with earliness and tardiness penalties: a review. Oper. Res. 38, 22-36.
    • (1990) Oper. Res. , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0025792925 scopus 로고
    • Scheduling to minimize weighted earliness and tardiness about a common due-date
    • De, P., Ghost, J.B., Wells, C.E., 1991. Scheduling to minimize weighted earliness and tardiness about a common due-date. Comput. Oper. Res. 18, 465-475.
    • (1991) Comput. Oper. Res. , vol.18 , pp. 465-475
    • De, P.1    Ghost, J.B.2    Wells, C.E.3
  • 4
    • 0027543702 scopus 로고
    • On general solution for a class of early/tardy problems
    • De, P., Jhosh, Wells, C.E., 1993. On general solution for a class of early/tardy problems. Comput. Oper. Res. 20, 141-149.
    • (1993) Comput. Oper. Res. , vol.20 , pp. 141-149
    • De, P.1    Jhosh2    Wells, C.E.3
  • 8
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problem II: Deviation of completion times about a restrictive common due date
    • Hall, N.G., Kubiak, W., Sethi, S.P., 1991. Earliness-tardiness scheduling problem II: deviation of completion times about a restrictive common due date. Oper. Res. 39, 847-856.
    • (1991) Oper. Res. , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 9
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problem I: Weighted deviation of completion times about a common due date
    • Hall, N.G., Posner, M.E., 1991. Earliness-tardiness scheduling problem I: weighted deviation of completion times about a common due date. Oper. Res. 39, 836-846.
    • (1991) Oper. Res. , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 10
    • 0024702296 scopus 로고
    • Evaluation the impact operating environment on MRP system nervousness
    • Ho, 1989. Evaluation the impact operating environment on MRP system nervousness. Internat. J. Prod. Res. 27, 1115-1135.
    • (1989) Internat. J. Prod. Res. , vol.27 , pp. 1115-1135
    • Ho1
  • 11
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
    • Hodgson, T.J., Wang, D.W., 1991a. Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. Internat. J. Prod. Res. 29, 1279-1287.
    • (1991) Internat. J. Prod. Res. , vol.29 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.W.2
  • 12
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 2
    • Hodgson, T.J., Wang, D.W., 1991b. Optimal hybrid push/pull control strategies for a parallel multistage system: part 2. Internat. J. Prod. Res. 29, 1453-1460.
    • (1991) Internat. J. Prod. Res. , vol.29 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.W.2
  • 13
    • 0042940655 scopus 로고
    • Multi-process capacities considered earliness/tardiness production planning methods for manufacturing systems
    • Li, Y., Wang, D.W., 1995. Multi-process capacities considered earliness/tardiness production planning methods for manufacturing systems, J. High Technol. Lett. 5, 1-7.
    • (1995) J. High Technol. Lett. , vol.5 , pp. 1-7
    • Li, Y.1    Wang, D.W.2
  • 14
    • 0042940658 scopus 로고    scopus 로고
    • The approaching feasible-field relaxation method for earliness/tardiness production planning problem for manufacturing systems
    • Li, Y., Wang, D.W., 1996. The approaching feasible-field relaxation method for earliness/tardiness production planning problem for manufacturing systems. J. System Eng. Theory Practice 16, 7-15.
    • (1996) J. System Eng. Theory Practice , vol.16 , pp. 7-15
    • Li, Y.1    Wang, D.W.2
  • 15
    • 0003740589 scopus 로고
    • Production planning of a flexible manufacturing system in a material requirements planning environment
    • Mazzola, J.B., Neebe, A.W., Dunn, C.V.R., 1989. Production planning of a flexible manufacturing system in a material requirements planning environment. Internat. J. Flexible Manuf. System 1, 115-142.
    • (1989) Internat. J. Flexible Manuf. System , vol.1 , pp. 115-142
    • Mazzola, J.B.1    Neebe, A.W.2    Dunn, C.V.R.3
  • 16
    • 0002437158 scopus 로고
    • N. Evolutionary optimization of constrained problems
    • Sebald, A.V., Fogel, L.J. (Eds.), World Scientific, Singapore
    • Michalewice, Z., Attia, 1994. N. Evolutionary optimization of constrained problems. In: Sebald, A.V., Fogel, L.J. (Eds.), Proc. 3rd Annual Conf. on Evolutionary Programming. World Scientific, Singapore, pp. 98-108.
    • (1994) Proc. 3rd Annual Conf. on Evolutionary Programming , pp. 98-108
    • Michalewice, Z.1    Attia2
  • 17
    • 0028014741 scopus 로고
    • Revisiting the johnson algorithm for flow-shop scheduling with genetic algorithms
    • Elsevier, Amsterdam
    • Mulkens, H., 1994. Revisiting the Johnson Algorithm for Flow-Shop Scheduling with Genetic Algorithms. Knowledge-Based Reactive Scheduling. Elsevier, Amsterdam, pp. 69-80.
    • (1994) Knowledge-based Reactive Scheduling , pp. 69-80
    • Mulkens, H.1
  • 18
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarker, R., Fitzsimmons, J.A., 1989. The performance of push and pull systems: a simulation and comparative study. Internat. J. Prod. Res. 27, 1715-1732.
    • (1989) Internat. J. Prod. Res. , vol.27 , pp. 1715-1732
    • Sarker, R.1    Fitzsimmons, J.A.2
  • 19
    • 0042439832 scopus 로고
    • Algorithms for efficient planning and operation of a particular FMS
    • Stecke, K.E., 1992. Algorithms for efficient planning and operation of a particular FMS. Internat. J. Flexible Manuf. System 1, 273-291.
    • (1992) Internat. J. Flexible Manuf. System , vol.1 , pp. 273-291
    • Stecke, K.E.1
  • 20
    • 0017557653 scopus 로고
    • Toyota production system and kanban system materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunoki, K., Cho, F., Uchikaa, K., 1977. Toyota production system and kanban system materialization of just-in-time and respect-for-human system. Internat. J. Prod. Res. 15, 553-564.
    • (1977) Internat. J. Prod. Res. , vol.15 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikaa, K.4
  • 21
    • 0029346791 scopus 로고
    • Earliness/tardiness production planning approaches for manufacturing systems
    • Wang, D.C., 1995. Earliness/tardiness production planning approaches for manufacturing systems. Comput. Ind. Eng. 28, 425-436.
    • (1995) Comput. Ind. Eng. , vol.28 , pp. 425-436
    • Wang, D.C.1
  • 22
    • 0027594826 scopus 로고
    • A comparative study on material requirements planning and just-in-time
    • Wang, D.W., Xu, C.G., 1993. A comparative study on material requirements planning and just-in-time. Acta Automat. Sinica 19, 363-372.
    • (1993) Acta Automat. Sinica , vol.19 , pp. 363-372
    • Wang, D.W.1    Xu, C.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.