-
1
-
-
0024140442
-
A heuristic for minimizing the number of tool switching on a flexible machine
-
Bard, S. J., 1988, A heuristic for minimizing the number of tool switching on a flexible machine. IIE Transactions, 20, 382-391.
-
(1988)
IIE Transactions
, vol.20
, pp. 382-391
-
-
Bard, S.J.1
-
3
-
-
0009089145
-
Sequence dependent machine set-up times and similarity of parts: A mathematical model
-
Charles-Owaba, O. C., and Lambert, B. K., 1988, Sequence dependent machine set-up times and similarity of parts: a mathematical model. IIE Transactions, 20, 12-21.
-
(1988)
IIE Transactions
, vol.20
, pp. 12-21
-
-
Charles-Owaba, O.C.1
Lambert, B.K.2
-
5
-
-
0022812078
-
A lisp based heuristic scheduler automatic insertion in electronic assembly
-
Cunningham, P., and Browne, J., 1986, A lisp based heuristic scheduler automatic insertion in electronic assembly. International Journal of Production Research, 24 (6), 1395-1408.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.6
, pp. 1395-1408
-
-
Cunningham, P.1
Browne, J.2
-
6
-
-
0031162618
-
Grouping components in printed circuit board assembly with limited component staging capacity and single card setup: Problem characteristics and solution procedures
-
Daskin, M., Maimon, O., Shtub, A., and Braha, D., 1996, Grouping components in printed circuit board assembly with limited component staging capacity and single card setup: problem characteristics and solution procedures. International Journal of Production Research, 35 (6), 1617-1638.
-
(1996)
International Journal of Production Research
, vol.35
, Issue.6
, pp. 1617-1638
-
-
Daskin, M.1
Maimon, O.2
Shtub, A.3
Braha, D.4
-
8
-
-
0020543237
-
Set-up times in cyclic and acyclic group technology scheduling systems
-
Foo, F. C., and Wagner, J. G., 1983, Set-up times in cyclic and acyclic group technology scheduling systems. International Journal of Production Research, 21, 63-73.
-
(1983)
International Journal of Production Research
, vol.21
, pp. 63-73
-
-
Foo, F.C.1
Wagner, J.G.2
-
10
-
-
0022559425
-
Optimization of control parameters for genetic algorithms
-
Grefenstette, J. J., 1986, Optimization of control parameters for genetic algorithms. IEEE Transactions on Man, Machine and Cybernetics, 16 (1), 122-128.
-
(1986)
IEEE Transactions on Man, Machine and Cybernetics
, vol.16
, Issue.1
, pp. 122-128
-
-
Grefenstette, J.J.1
-
11
-
-
0001984556
-
Genetic algorithms for the traveling salesman problem
-
Pittsburgh: Carnegie-Mellon University)
-
Grefenstette, J. J., Gopal, R., Rosamita, B., and van Gucht, D., 1985, Genetic algorithms for the traveling salesman problem. Proceedings ofan International Conference on Genetic Algorithms and Their Applications (Pittsburgh: Carnegie-Mellon University).
-
(1985)
Proceedings Ofan International Conference on Genetic Algorithms and Their Applications
-
-
Grefenstette, J.J.1
Gopal, R.2
Rosamita, B.3
Van Gucht, D.4
-
13
-
-
0000695743
-
Parallel genetic algorithms applied to the travelling salesman problem
-
Jog, P., Jung, Y. S., and Gucht, D. V., 1991, Parallel genetic algorithms applied to the travelling salesman problem. SIAM Journal on Optimization, pp. 515-529.
-
(1991)
SIAM Journal on Optimization
, pp. 515-529
-
-
Jog, P.1
Jung, Y.S.2
Gucht, D.V.3
-
15
-
-
70350674995
-
On the shortest spanning subtree of a graph and the traveling salesman problem
-
Kruskal, J. B., 1956, On the shortest spanning subtree of a graph and the traveling salesman problem. Proceedings of the American Mathematical Society, 7, 48-50.
-
(1956)
Proceedings of the American Mathematical Society
, vol.7
, pp. 48-50
-
-
Kruskal, J.B.1
-
16
-
-
0022890910
-
Dynamic scheduling for flexible FCC assembly
-
Lofgren, C. B., and McGinnis, L. F., 1986, Dynamic scheduling for flexible FCC assembly. IEEE (ICSMC v.2), pp. 1294-1297.
-
(1986)
IEEE (ICSMC V.2)
, pp. 1294-1297
-
-
Lofgren, C.B.1
Mc Ginnis, L.F.2
-
19
-
-
0002470532
-
A study of permutation crossover operators on the traveling salesman problem
-
Oliver, I. M., Smith, D. J., and Holland, J. R. C., 1987, A study of permutation crossover operators on the traveling salesman problem. Proceedings of the Second International Conference on Genetic Algorithms and Their Applications.
-
(1987)
Proceedings of the Second International Conference on Genetic Algorithms and Their Applications
-
-
Oliver, I.M.1
Smith, D.J.2
Holland, J.R.C.3
-
20
-
-
0021877888
-
Job scheduling in a group technology environment for a single facility
-
Ozden, M., Egbelu, P. J., and Iyer, A. V., 1985, Job scheduling in a group technology environment for a single facility. Computers and Industrial Engineering, 9, 67-72.
-
(1985)
Computers and Industrial Engineering
, vol.9
, pp. 67-72
-
-
Ozden, M.1
Egbelu, P.J.2
Iyer, A.V.3
-
22
-
-
0026930899
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer, R. H., Wu, S. D., and Vaccari, R., 1992, New search spaces for sequencing problems with application to job shop scheduling. Management Science, 38, 1495-1509.
-
(1992)
Management Science
, vol.38
, pp. 1495-1509
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
23
-
-
0024070715
-
Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches
-
Tang, C. S., and Denardo, E. V., 1988a, Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches. Operations Research, 36 (5), 767-777.
-
(1988)
Operations Research
, vol.36
, Issue.5
, pp. 767-777
-
-
Tang, C.S.1
Denardo, E.V.2
-
24
-
-
0024071392
-
Models arising from a flexible manufacturing machine, part I: Minimization of the number of switching instants
-
Tang, C. S., and Denardo, E. V., 1988b, Models arising from a flexible manufacturing machine, part I: minimization of the number of switching instants. Operations Research, 36 (5), 778-784.
-
(1988)
Operations Research
, vol.36
, Issue.5
, pp. 778-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
25
-
-
38149146381
-
Genetically improved presequences for Euclidean traveling salesman problems
-
Tate, D. M., Tunasar, C., and Smith, A. E., 1994, Genetically improved presequences for Euclidean traveling salesman problems. Mathematical and Computer Modeling, 20 (2), 135-143.
-
(1994)
Mathematical and Computer Modeling
, vol.20
, Issue.2
, pp. 135-143
-
-
Tate, D.M.1
Tunasar, C.2
Smith, A.E.3
-
26
-
-
0017465264
-
Sequence-dependent set-up times andjob sequencing
-
White, C. H., and Wilson, R. C., 1977, Sequence-dependent set-up times andjob sequencing. International Journal of Production Research, 15, 191-202.
-
(1977)
International Journal of Production Research
, vol.15
, pp. 191-202
-
-
White, C.H.1
Wilson, R.C.2
|