-
3
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
Graves SC et al (eds), North Holland, Amsterdam
-
Lawler EL, Lenstra JK, Rinnooy Kan AHG and Shmoys DB (1993). Sequencing and scheduling: algorithms and complexity. In Graves SC et al (eds). Handbooks in Operations Research and Management Science 4 North Holland, Amsterdam 445-552.
-
(1993)
Handbooks in Operations Research and Management Science
, vol.4
, pp. 445-552
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.3
Shmoys, D.B.4
-
5
-
-
21844496123
-
Maintenance Scheduling: Issues, Results and Research Needs
-
Paz NM and Leigh W (1994). Maintenance Scheduling: Issues, Results and Research Needs. Int J Opns and Prod Mgmt 14: 4769.
-
(1994)
Int J Opns and Prod Mgmt
, vol.14
, pp. 4769
-
-
Paz, N.M.1
Leigh, W.2
-
8
-
-
0023996604
-
Optimal preventive maintenance scheduling of thermal generating units in power systems: A survey of problems formulations and solutions methods
-
Kralj B and Petrovic R (1988). Optimal preventive maintenance scheduling of thermal generating units in power systems: a survey of problems formulations and solutions methods. Eur J OplRes 35: 1-15.
-
(1988)
Eur J Oplres
, vol.35
, pp. 1-15
-
-
Kralj, B.1
Petrovic, R.2
-
9
-
-
0029343602
-
A multiobjective optimisation approach to thermal generating units maintenance scheduling
-
Kralj B and Petrovic R (1995). A multiobjective optimisation approach to thermal generating units maintenance scheduling. Eur J Opl Res 84: 481-493.
-
(1995)
Eur J Opl Res
, vol.84
, pp. 481-493
-
-
Kralj, B.1
Petrovic, R.2
-
10
-
-
0020100152
-
On maintenance of production units
-
Escudero LF (1982). On maintenance of production units. Eur J Opl Res 9: 264-274.
-
(1982)
Eur J Opl Res
, vol.9
, pp. 264-274
-
-
Escudero, L.F.1
-
11
-
-
0005868488
-
A method for maintenance scheduling using GA combined with SA
-
Hyunchul K, Nara K and Gen M (1994). A method for maintenance scheduling using GA combined with SA. Comp and Indust Engng 27: 477-480.
-
(1994)
Comp and Indust Engng
, vol.27
, pp. 477-480
-
-
Hyunchul, K.1
Nara, K.2
Gen, M.3
-
12
-
-
0017719787
-
Scheduling overhauls of soaking pits
-
Christer A and Doherty D (1977). Scheduling overhauls of soaking pits. Opns Res Q 28: 915-926.
-
(1977)
Opns Res Q
, vol.28
, pp. 915-926
-
-
Christer, A.1
Doherty, D.2
-
13
-
-
0018441246
-
Determination of co-ordinated maintenance scheduling frequencies for a group of machines
-
Sule DR and Harmon B (1979). Determination of co-ordinated maintenance scheduling frequencies for a group of machines. AIIE Trans 11: 48-53.
-
(1979)
AIIE Trans
, vol.11
, pp. 48-53
-
-
Sule, D.R.1
Harmon, B.2
-
14
-
-
21344488361
-
A deterministic maintenance-scheduling problem for a group of non-identical machines
-
Hariga M (1994). A deterministic maintenance-scheduling problem for a group of non-identical machines. Int J Opns and Prod Mgmt 14: 27-36.
-
(1994)
Int J Opns and Prod Mgmt
, vol.14
, pp. 27-36
-
-
Hariga, M.1
-
15
-
-
21344491916
-
An extended model for the joint overhaul scheduling problem
-
Duffuaa SO and Ben-Daya M (1994). An extended model for the joint overhaul scheduling problem. Int J Opns and Prod Mgmt 14: 37-43.
-
(1994)
Intj Opns and Prod Mgmt
, vol.14
, pp. 37-43
-
-
Duffuaa, S.O.1
Ben-Daya, M.2
-
16
-
-
0029469956
-
Impact of job- sequence on the down-time of a deteriorating flexible machine
-
Chakravarty AK and Balakrishnan N (1995). Impact of job- sequence on the down-time of a deteriorating flexible machine. Eur J Opl Res 87: 299-315.
-
(1995)
Eur J Opl Res
, vol.87
, pp. 299-315
-
-
Chakravarty, A.K.1
Balakrishnan, N.2
-
17
-
-
84984716671
-
-
Faculty of Mathematical Studies, Southampton, UK
-
Anily S, Glass C and Hassin R (1994). The scheduling of maintenance service. Report No. OR57, University of Southampton, Faculty of Mathematical Studies, Southampton, UK.
-
(1994)
The Scheduling of Maintenance Service. Report No. OR57, University of Southampton
-
-
Anily, S.1
Glass, C.2
Hassin, R.3
-
18
-
-
0025418901
-
Equipment utilization based maintenance task scheduling in a job shop
-
Banerjee A and Burton S (1990). Equipment utilization based maintenance task scheduling in a job shop. Eur J Opl Res 45: 191-202.
-
(1990)
Eur J Opl Res
, vol.45
, pp. 191-202
-
-
Banerjee, A.1
Burton, S.2
-
20
-
-
77957077792
-
A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness
-
Lawler EL (1977). A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics 1: 331-342.
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 331-342
-
-
Lawler, E.L.1
-
23
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker KR and Scudder G (1990). Sequencing with earliness and tardiness penalties: A review. Opns Res 38: 22-36.
-
(1990)
Opns Res
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.2
-
24
-
-
0026223840
-
Earliness-tardiness scheduling problem i: Weighted deviation of the completion times about common due date
-
Hall NG and Posner M (1991). Earliness-tardiness scheduling problem i: weighted deviation of the completion times about common due date. Opns Res 39: 836-846.
-
(1991)
Opns Res
, vol.39
, pp. 836-846
-
-
Hall, N.G.1
Posner, M.2
-
25
-
-
0026223827
-
Earliness-tardiness scheduling problem ii: Deviation of the completion times about a restrictive common due date
-
Hall NG, Kubiak W and Sethi SP (1991). Earliness-tardiness scheduling problem ii: deviation of the completion times about a restrictive common due date. Opns Res 39: 847-856.
-
(1991)
Opns Res
, vol.39
, pp. 847-856
-
-
Hall, N.G.1
Kubiak, W.2
Sethi, S.P.3
-
26
-
-
0023542419
-
Minimizing weighted absolute deviation in single machine scheduling: A Survey
-
Fry T, Armstrong, R and Blackstone J (1987). Minimizing weighted absolute deviation in single machine scheduling: a Survey. IIE Trans 19: 445-450.
-
(1987)
IIE Trans
, vol.19
, pp. 445-450
-
-
Fry, T.1
Armstrong, R.2
Blackstone, J.3
-
27
-
-
0000245614
-
The single machine early-tardy problem
-
Ow P and Morton T (1989). The single machine early-tardy problem. Mgmt Sci 35: 177-191.
-
(1989)
Mgmt Sci
, vol.35
, pp. 177-191
-
-
Ow, P.1
Morton, T.2
-
28
-
-
0030124747
-
Genetic algorithms-a tool for OR?
-
Dowsland KA (1996). Genetic algorithms-a tool for OR? J Opl ResSoc 47: 550-561.
-
(1996)
J Opl Ressoc
, vol.47
, pp. 550-561
-
-
Dowsland, K.A.1
-
30
-
-
84974862898
-
General purpose simulated annealing
-
Connolly DT (1992). General purpose simulated annealing. J Opl Res Soc 43: 495-505.
-
(1992)
J Opl Res Soc
, vol.43
, pp. 495-505
-
-
Connolly, D.T.1
-
31
-
-
84984733851
-
TabuSearch-Part I
-
Glover F (1989). Tabu Search-Part I. ORSA J on Comput 1: 190-206.
-
(1989)
ORSA J on Comput
, vol.1
, pp. 190-206
-
-
Glover, F.1
-
32
-
-
0001724713
-
Tabu Search-Part II
-
Glover F (1990). Tabu Search-Part II. ORSA J on Comput 21: 4-32.
-
(1990)
ORSA J on Comput
, vol.21
, pp. 4-32
-
-
Glover, F.1
-
34
-
-
0029207545
-
An application of genetic algorithms for flowshop problems
-
Chen CL, Vempati VS and Aljaber N (1995). An application of genetic algorithms for flowshop problems. Eur J Opl Res 80: 389-396.
-
(1995)
Eur J Opl Res
, vol.80
, pp. 389-396
-
-
Chen, C.L.1
Vempati, V.S.2
Aljaber, N.3
-
35
-
-
0028565588
-
Performance evaluation of genetic algorithms for flowshop scheduling problems
-
IEEE, New York
-
Murata T and Ishibuchi H (1994). Performance evaluation of genetic algorithms for flowshop scheduling problems. In: Proceedings of the IEEE Conference on Genetic Algorithms IEEE, New York 812-817.
-
(1994)
Proceedings of the IEEE Conference on Genetic Algorithms
, pp. 812-817
-
-
Murata, T.1
Ishibuchi, H.2
|