메뉴 건너뛰기




Volumn 49, Issue 11, 1998, Pages 1130-1145

Maintenance scheduling of rolling stock using a genetic algorithm

Author keywords

Genetic algorithms; Maintenance scheduling; Optimisation; Rolling stock

Indexed keywords

COMPUTATIONAL METHODS; GENETIC ALGORITHMS; OPTIMIZATION; PREVENTIVE MAINTENANCE; PROBLEM SOLVING; RAILROAD ROLLING STOCK; RANDOM PROCESSES; STRATEGIC PLANNING;

EID: 0032203407     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600627     Document Type: Article
Times cited : (33)

References (36)
  • 5
    • 21844496123 scopus 로고
    • Maintenance Scheduling: Issues, Results and Research Needs
    • Paz NM and Leigh W (1994). Maintenance Scheduling: Issues, Results and Research Needs. Int J Opns and Prod Mgmt 14: 4769.
    • (1994) Int J Opns and Prod Mgmt , vol.14 , pp. 4769
    • Paz, N.M.1    Leigh, W.2
  • 8
    • 0023996604 scopus 로고
    • Optimal preventive maintenance scheduling of thermal generating units in power systems: A survey of problems formulations and solutions methods
    • Kralj B and Petrovic R (1988). Optimal preventive maintenance scheduling of thermal generating units in power systems: a survey of problems formulations and solutions methods. Eur J OplRes 35: 1-15.
    • (1988) Eur J Oplres , vol.35 , pp. 1-15
    • Kralj, B.1    Petrovic, R.2
  • 9
    • 0029343602 scopus 로고
    • A multiobjective optimisation approach to thermal generating units maintenance scheduling
    • Kralj B and Petrovic R (1995). A multiobjective optimisation approach to thermal generating units maintenance scheduling. Eur J Opl Res 84: 481-493.
    • (1995) Eur J Opl Res , vol.84 , pp. 481-493
    • Kralj, B.1    Petrovic, R.2
  • 10
    • 0020100152 scopus 로고
    • On maintenance of production units
    • Escudero LF (1982). On maintenance of production units. Eur J Opl Res 9: 264-274.
    • (1982) Eur J Opl Res , vol.9 , pp. 264-274
    • Escudero, L.F.1
  • 11
    • 0005868488 scopus 로고
    • A method for maintenance scheduling using GA combined with SA
    • Hyunchul K, Nara K and Gen M (1994). A method for maintenance scheduling using GA combined with SA. Comp and Indust Engng 27: 477-480.
    • (1994) Comp and Indust Engng , vol.27 , pp. 477-480
    • Hyunchul, K.1    Nara, K.2    Gen, M.3
  • 12
    • 0017719787 scopus 로고
    • Scheduling overhauls of soaking pits
    • Christer A and Doherty D (1977). Scheduling overhauls of soaking pits. Opns Res Q 28: 915-926.
    • (1977) Opns Res Q , vol.28 , pp. 915-926
    • Christer, A.1    Doherty, D.2
  • 13
    • 0018441246 scopus 로고
    • Determination of co-ordinated maintenance scheduling frequencies for a group of machines
    • Sule DR and Harmon B (1979). Determination of co-ordinated maintenance scheduling frequencies for a group of machines. AIIE Trans 11: 48-53.
    • (1979) AIIE Trans , vol.11 , pp. 48-53
    • Sule, D.R.1    Harmon, B.2
  • 14
    • 21344488361 scopus 로고
    • A deterministic maintenance-scheduling problem for a group of non-identical machines
    • Hariga M (1994). A deterministic maintenance-scheduling problem for a group of non-identical machines. Int J Opns and Prod Mgmt 14: 27-36.
    • (1994) Int J Opns and Prod Mgmt , vol.14 , pp. 27-36
    • Hariga, M.1
  • 15
    • 21344491916 scopus 로고
    • An extended model for the joint overhaul scheduling problem
    • Duffuaa SO and Ben-Daya M (1994). An extended model for the joint overhaul scheduling problem. Int J Opns and Prod Mgmt 14: 37-43.
    • (1994) Intj Opns and Prod Mgmt , vol.14 , pp. 37-43
    • Duffuaa, S.O.1    Ben-Daya, M.2
  • 16
    • 0029469956 scopus 로고
    • Impact of job- sequence on the down-time of a deteriorating flexible machine
    • Chakravarty AK and Balakrishnan N (1995). Impact of job- sequence on the down-time of a deteriorating flexible machine. Eur J Opl Res 87: 299-315.
    • (1995) Eur J Opl Res , vol.87 , pp. 299-315
    • Chakravarty, A.K.1    Balakrishnan, N.2
  • 18
    • 0025418901 scopus 로고
    • Equipment utilization based maintenance task scheduling in a job shop
    • Banerjee A and Burton S (1990). Equipment utilization based maintenance task scheduling in a job shop. Eur J Opl Res 45: 191-202.
    • (1990) Eur J Opl Res , vol.45 , pp. 191-202
    • Banerjee, A.1    Burton, S.2
  • 20
    • 77957077792 scopus 로고
    • A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness
    • Lawler EL (1977). A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness. Annals of Discrete Mathematics 1: 331-342.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 23
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker KR and Scudder G (1990). Sequencing with earliness and tardiness penalties: A review. Opns Res 38: 22-36.
    • (1990) Opns Res , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.2
  • 24
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problem i: Weighted deviation of the completion times about common due date
    • Hall NG and Posner M (1991). Earliness-tardiness scheduling problem i: weighted deviation of the completion times about common due date. Opns Res 39: 836-846.
    • (1991) Opns Res , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.2
  • 25
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problem ii: Deviation of the completion times about a restrictive common due date
    • Hall NG, Kubiak W and Sethi SP (1991). Earliness-tardiness scheduling problem ii: deviation of the completion times about a restrictive common due date. Opns Res 39: 847-856.
    • (1991) Opns Res , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 26
    • 0023542419 scopus 로고
    • Minimizing weighted absolute deviation in single machine scheduling: A Survey
    • Fry T, Armstrong, R and Blackstone J (1987). Minimizing weighted absolute deviation in single machine scheduling: a Survey. IIE Trans 19: 445-450.
    • (1987) IIE Trans , vol.19 , pp. 445-450
    • Fry, T.1    Armstrong, R.2    Blackstone, J.3
  • 27
    • 0000245614 scopus 로고
    • The single machine early-tardy problem
    • Ow P and Morton T (1989). The single machine early-tardy problem. Mgmt Sci 35: 177-191.
    • (1989) Mgmt Sci , vol.35 , pp. 177-191
    • Ow, P.1    Morton, T.2
  • 28
    • 0030124747 scopus 로고    scopus 로고
    • Genetic algorithms-a tool for OR?
    • Dowsland KA (1996). Genetic algorithms-a tool for OR? J Opl ResSoc 47: 550-561.
    • (1996) J Opl Ressoc , vol.47 , pp. 550-561
    • Dowsland, K.A.1
  • 30
    • 84974862898 scopus 로고
    • General purpose simulated annealing
    • Connolly DT (1992). General purpose simulated annealing. J Opl Res Soc 43: 495-505.
    • (1992) J Opl Res Soc , vol.43 , pp. 495-505
    • Connolly, D.T.1
  • 31
    • 84984733851 scopus 로고
    • TabuSearch-Part I
    • Glover F (1989). Tabu Search-Part I. ORSA J on Comput 1: 190-206.
    • (1989) ORSA J on Comput , vol.1 , pp. 190-206
    • Glover, F.1
  • 32
    • 0001724713 scopus 로고
    • Tabu Search-Part II
    • Glover F (1990). Tabu Search-Part II. ORSA J on Comput 21: 4-32.
    • (1990) ORSA J on Comput , vol.21 , pp. 4-32
    • Glover, F.1
  • 34
    • 0029207545 scopus 로고
    • An application of genetic algorithms for flowshop problems
    • Chen CL, Vempati VS and Aljaber N (1995). An application of genetic algorithms for flowshop problems. Eur J Opl Res 80: 389-396.
    • (1995) Eur J Opl Res , vol.80 , pp. 389-396
    • Chen, C.L.1    Vempati, V.S.2    Aljaber, N.3
  • 35
    • 0028565588 scopus 로고
    • Performance evaluation of genetic algorithms for flowshop scheduling problems
    • IEEE, New York
    • Murata T and Ishibuchi H (1994). Performance evaluation of genetic algorithms for flowshop scheduling problems. In: Proceedings of the IEEE Conference on Genetic Algorithms IEEE, New York 812-817.
    • (1994) Proceedings of the IEEE Conference on Genetic Algorithms , pp. 812-817
    • Murata, T.1    Ishibuchi, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.