-
2
-
-
0035917226
-
Finite capacity production planning algorithms for a semiconductor wafer fabrication facility
-
Horiguchi, K., N. Raghavani, R. Uzsoy. 2001. Finite capacity production planning algorithms for a semiconductor wafer fabrication facility. International Journal of Production Research 39 (5): 825-42.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.5
, pp. 825-842
-
-
Horiguchi, K.1
Raghavani, N.2
Uzsoy, R.3
-
3
-
-
0034246784
-
Segment-based approach for real-time reactive rescheduling for automated manufacturing control
-
Toba, H. 2000. Segment-based approach for real-time reactive rescheduling for automated manufacturing control. IEEE Transactions on Semiconductor Manufacturing 13 (3): 264-72.
-
(2000)
IEEE Transactions on Semiconductor Manufacturing
, vol.13
, Issue.3
, pp. 264-272
-
-
Toba, H.1
-
4
-
-
0042622980
-
A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab
-
Mason, S., J. W. Fowler, and M. W. Carlyle. 2001. A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab. Journal of Scheduling 5:247-62.
-
(2001)
Journal of Scheduling
, vol.5
, pp. 247-262
-
-
Mason, S.1
Fowler, J.W.2
Carlyle, M.W.3
-
5
-
-
0001811353
-
Logistics management system (LMS): Integrating decision technology for dispatch scheduling in semiconductor manufacturing
-
edited by M. Zweben and M. S. Fox; San Francisco, CA: Morgan Kaufmann
-
Fordyce, K., G. Sullivan. 1994. Logistics management system (LMS): Integrating decision technology for dispatch scheduling in semiconductor manufacturing. In Intelligent scheduling, edited by M. Zweben and M. S. Fox, 473-516. San Francisco, CA: Morgan Kaufmann.
-
(1994)
Intelligent Scheduling
, pp. 473-516
-
-
Fordyce, K.1
Sullivan, G.2
-
6
-
-
0041621007
-
HIDES: Towards an agent-based simulator
-
Henoch, J., and H. Ulrich. 2000. HIDES: Towards an agent-based simulator. In Proceedings of Agent Based Simulation: International Workshop 2000, Passau, Germany, pp. 259-63.
-
(2000)
Proceedings of Agent Based Simulation: International Workshop 2000, Passau, Germany
, pp. 259-263
-
-
Henoch, J.1
Ulrich, H.2
-
8
-
-
0043123827
-
-
Object Management Group; CORBA/IIOP specification 2.6
-
Object Management Group. 2001. CORBA/IIOP specification 2.6. Retrieved from www.omg.org
-
(2001)
-
-
-
10
-
-
0042622979
-
A modified shifting bottleneck heuristic for scheduling semiconductor wafer fabrication facilities
-
Fowler, J. W., S. Brown, M. W. Carlyle, E. S. Gel, S. M. Mason, L. Mönch, O. Rose, G. C. Runger, and R. Sturm. 2002. A modified shifting bottleneck heuristic for scheduling semiconductor wafer fabrication facilities. In Proceedings of the 12th International Conference on Flexible Automation and Intelligent Manufacturing, pp. 1231-6.
-
(2002)
Proceedings of the 12th International Conference on Flexible Automation and Intelligent Manufacturing
, pp. 1231-1236
-
-
Fowler, J.W.1
Brown, S.2
Carlyle, M.W.3
Gel, E.S.4
Mason, S.M.5
Mönch, L.6
Rose, O.7
Runger, G.C.8
Sturm, R.9
-
11
-
-
0036927906
-
A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing
-
Habenicht, I., and L. Mönch. 2002. A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. In Proceedings of the 2002 Winter Simulation Conference, pp. 1406-13.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1406-1413
-
-
Habenicht, I.1
Mönch, L.2
-
12
-
-
0028442512
-
Implementation of resource constraints in ILOG SCHEDULE: A library for the development of constraint-based scheduling systems
-
Le Pape, C. 1994. Implementation of resource constraints in ILOG SCHEDULE: A library for the development of constraint-based scheduling systems. Intelligent Systems Engineering 3:55-66.
-
(1994)
Intelligent Systems Engineering
, vol.3
, pp. 55-66
-
-
Le Pape, C.1
|