메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1406-1413

A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; BEAM LEAD DEVICES; COMPUTER SIMULATION; DISTRIBUTED PARAMETER CONTROL SYSTEMS; HIERARCHICAL SYSTEMS; PRODUCTION CONTROL; SCHEDULING; WSI CIRCUITS;

EID: 0036927906     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (25)

References (17)
  • 3
    • 0001675866 scopus 로고
    • Planning in a flexible semiconductor manufacturing environment
    • eds. M. Zweben and M. Fox, San Francisco, CA: Morgan Kaufmann
    • Fargher, H. E. and R. A. Smith. 1994. Planning in a Flexible Semiconductor Manufacturing Environment. In Intelligent Scheduling, eds. M. Zweben and M. Fox, 545-581, San Francisco, CA: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 545-581
    • Fargher, H.E.1    Smith, R.A.2
  • 5
    • 0034135518 scopus 로고    scopus 로고
    • Control of multiproduct bulk server diffusion/oxidation processes, part Two: Multiple servers
    • Fowler, J. W., G. L. Hogg, and D. T. Phillips. 2000. Control of Multiproduct Bulk Server Diffusion/Oxidation Processes, Part Two: Multiple Servers. IIE Transactions on Scheduling and Logistics, 32 (2): 167-176.
    • (2000) IIE Transactions on Scheduling and Logistics , vol.32 , Issue.2 , pp. 167-176
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 6
    • 0002540072 scopus 로고
    • ISIS: A retrospective
    • eds. M. Zweben and M. Fox, San Francisco, CA: Morgan Kaufmann
    • Fox, M. S. 1994. ISIS: A Retrospective. In Intelligent Scheduling, eds. M. Zweben and M. Fox, 3-28, San Francisco, CA: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 3-28
    • Fox, M.S.1
  • 7
    • 0000189314 scopus 로고
    • ReDS: A real time production scheduling system from conception to practice
    • eds. M. Zweben and M. Fox, San Francisco, CA: Morgan Kaufmann
    • Hadavi, K. and K. Voigt. 1994. ReDS: A Real Time Production Scheduling System from Conception to Practice. In Intelligent Scheduling, eds. M. Zweben and M. Fox, 581-604, San Francisco, CA: Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 581-604
    • Hadavi, K.1    Voigt, K.2
  • 9
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung, Y.-F. and R. C. Leachman. 1996. A Production Planning Methodology for Semiconductor Manufacturing Based on Iterative Simulation and Linear Programming Calculations. IEEE Transactions on Semiconductor Manufacturing, 9: 257-269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , pp. 257-269
    • Hung, Y.-F.1    Leachman, R.C.2
  • 10
    • 0028442512 scopus 로고
    • Implementation of resource constraints in ILOG SCHEDULE: A library for the development of constraint-based scheduling systems
    • Le Pape, C. 1994. Implementation of Resource Constraints in ILOG SCHEDULE: A Library for the Development of Constraint-Based Scheduling Systems. Intelligent Systems Engineering 3: 55-66.
    • (1994) Intelligent Systems Engineering , vol.3 , pp. 55-66
    • Le Pape, C.1
  • 12
    • 0012305709 scopus 로고    scopus 로고
    • Towards an agent-based production control in the semiconductor industry
    • Workshop on Multi-Agent-Based Modeling and Simulation, Marseille
    • th European Simulation Symposium- Simulation in Industry (ESS 2001), Workshop on Multi-Agent-Based Modeling and Simulation, Marseille, 941-945.
    • (2001) th European Simulation Symposium- Simulation in Industry (ESS 2001) , pp. 941-945
    • Mönch, L.1
  • 15
    • 0034246784 scopus 로고    scopus 로고
    • Segment-based approach for real-time reactive rescheduling for automatic manufacturing control
    • Toba, H. 1999. Segment-Based Approach for Real-Time Reactive Rescheduling for Automatic Manufacturing Control. IEEE Transactions on Semiconductor Manufacturing, 13 (3): 264-272.
    • (1999) IEEE Transactions on Semiconductor Manufacturing , vol.13 , Issue.3 , pp. 264-272
    • Toba, H.1
  • 16
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., C.-Y. Lee, and L. A. Martin-Vega. 1992. A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning. IIE Transactions on Scheduling and Logistics, 24: 47-61.
    • (1992) IIE Transactions on Scheduling and Logistics , vol.24 , pp. 47-61
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 17
    • 0035331868 scopus 로고    scopus 로고
    • A model predictive control approach for real-time optimization of reentrant manufacturing lines
    • Vargas-Villamil, F.-D. and D. E. Rivera. 2001. A Model Predictive Control Approach for Real-Time Optimization of Reentrant Manufacturing Lines. Computers in Industry, 45: 45-57.
    • (2001) Computers in Industry , vol.45 , pp. 45-57
    • Vargas-Villamil, F.-D.1    Rivera, D.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.